A26 submarine

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Class overview
Builders: Kockums
Operators:  Swedish Navy
Preceded by: Gotland
In service: Cancelled[citation needed]
Planned: 2
Cancelled: 2
General characteristics
Displacement: 1,900 long tons (1,930 t)[1]
Length: 63 m (206 ft 8 in)[1]
Beam: 6.4 m (21 ft 0 in)[1]
Draught: 6 m (19 ft 8 in)
Propulsion: Diesel-electric and Stirling AIP[1]
Endurance: 45 days (18 days underwater with AIP)
Test depth: 200 m (656 ft 2 in)
Complement: 17–26[1]
Armament: 533 mm (21.0 in) Torpedo tubes
400 mm (15.7 in) Torpedo tubes
Torped 62, mines
A total payload of more than fifteen 53 cm weapons is possible

A26 was the project name of the next generation of submarines developed by Kockums for the Swedish Navy. First planned at the beginning of the 1990s, the project was called "U-båt 2000" and was intended to be ready by the late 1990s or early 2000. With the end of the Cold War the naval threat from the Soviet Union disappeared and the new submarine class was deemed unnecessary.[2] The project lay dormant for years until the mid-2000s when the need for a replacement for the Södermanland-class submarines became apparent. Originally the Scandinavian countries had intended to collaborate on the Viking-class submarine, but Denmark's withdrawal from submarine operations meant that Kockums proceeded on their own.

In February 2014 the project was cancelled because of disagreement between Kockums German owners and the Swedish government.[citation needed]

Features[edit]

The new submarine project was intended to be an improved version of the Gotland-class submarine, which will be considered obsolete around 2015–17 according to Per Skantz, development co-ordinator at the Marine headquarters in Stockholm.[3] The submarine would displace 1,900 tonnes[1] and have a crew complement of between 17 and 31 men.[4] The 2008–10 military budget memorandum to the Minister for Defence by the Supreme Commander Håkan Syrén would require the type to cost no more than the current Gotland class (about 1.5 billion SEK).[3] The new submarine would have blue water capability, something earlier Swedish submarines have lacked. It would have been equipped with modified AIP stirling propulsion and GHOST (Genuine HOlistic STealth) technology, making the submarine extremely quiet. It will also be designed to withstand significant shock loads from underwater explosions and would be able to "Launch and recover vehicles" through its torpedo tubes.[5] The submarine's sail would largely be composed of the same material that was used when constructing the Visby stealth corvette.[6]

Orders[edit]

On 25 February 2010 Kockums AB signed a contract with the Swedish Defence Materiel Administration (FMV) concerning the overall design phase of the next-generation submarine. Kockums CEO, Ola Alfredsson, stated that "This is an important first step, not only for Kockums, but for the Swedish Armed Forces as a whole. We shall now be able to maintain our position at the cutting edge of submarine technology, which is vital in the light of current threat scenarios."[7][8]

The Norwegian Navy had shown interest in the project and could be interested to buy several submarines in the future. According to Kockums AB orders must be made by the end of 2010.[9][10]

On 11 April 2010 the Swedish Defence minister Sten Tolgfors announced plans to acquire two new submarines to be commissioned in 2018–19 replacing the two submarines of the Södermanlands class. The plans also included a Mid-Life Upgrade program of two submarines of the Gotland class. Additional submarines could later be ordered to replace the Gotland class, however this will not be decided before 2020.[11][12]

On 16 June 2010, the Swedish Parliament authorised the government to procure two new submarines.[13][14] Kockums states that construction of two A26 submarines will generate about 170 jobs.[15]

The first submarine was planned to be laid down by the end of 2012, but as of 2013 no submarines have yet been ordered.[16] In September 2013 it was announced that the project had been delayed because of construction issues and the first submarine would not be ready before 2020.[17]

Order cancelled and alternatives[edit]

On 27 February 2014 the Swedish Defence Materiel Administration cancelled its plans for ordering the A26 submarine from Kockums. According to FMV the new Kockum owner, the German company Thyssen Krupp has refused to allow Sweden to share the cost with any other nation, making the submarine too expensive. Sweden has instead approached Saab.[18][19] Saab plans to rehire many of Kockums submarine engineers if they receive orders for a new submarine.[20][21] As a result Saab recruited top people from Kockums and issued a press release that the company was seeking employees for its naval division. In a letter to the Swedish Defence Materiel Administration, FMV, the head of the German ThyssenKrupp Marine Division, Dr. Hans Atzpodien begs FMV to stop Saab from recruiting key personnel from Kockums. On 2 April 2014 the Swedish government officially terminated all talks about a deal with the ThyssenKrupp.[22]

On 14 April 2014 about 200 employees had left Thyssen Krupp for Saab and it was reported that Saab and Thyssen Krupp had started to negotiate about selling Kockums.[23] In June 2014 Thyssen Krupp agreed to sell Kockums to Saab.[24]

On 22 July 2014 it was announced that Saab had bought Kockums from Thyssen Krupp for 340 million SEK. The new name will be Saab Kockums.[25]

On 12 September 2014, Saab Kockums proposed a 4,000 ton variant of the A26, known as the type 612, for the Royal Australian Navy to replace their ageing Collins-class submarine which may lead to the project being brought back.

In December 2014 an agreement between Saab and Damen Shipyards was announced to jointly develop, offer and build next-generation submarines (based on the Type 612 design) initially focused on replacing the currently 4 Walrus Class submarines in use by the Royal The Netherlands Navy by 2025 combined with the still existing Swedish Submarine requirements after cancellation of the previous A26 program.

See also[edit]

References[edit]

  1. ^ a b c d e f "A26 Submarine type A26". Kockums. Retrieved 2 March 2010. 
  2. ^ dead link
  3. ^ a b Karlberg, Lars Anders (1 March 2007). "ÖB vill ha Kockums nya tysta u-båt A26" [Supreme Commander wants Kockums' new silent submarine A26]. Ny Teknik (in Swedish) (SE). Retrieved 11 September 2010. 
  4. ^ Kleja, Monica (21 December 2007). "Kockums fick ja till ny smygubåt" [Kockums got yes for new stealth submarine]. Ny Teknik (in Swedish) (SE). Retrieved 11 September 2010. 
  5. ^ The Way Forward, SE: Nordkaparen .
  6. ^ "Kompositskrov även i superubåten" [Composite Hull also in super submarine], Ny Teknik (in Swedish) (SE) 
  7. ^ "Sweden Launches Next-Generation Submarine Project". Defence talk. 26 February 2010. Retrieved 11 September 2010. 
  8. ^ "Kockums konstruerar spionubåtar" [Kockums constructs spy submarines]. Svenska Dagbladet (in Swedish). Tidningarnas Telegrambyrå. 25 February 2010. Retrieved 11 September 2010. 
  9. ^ Enarsson, Lars-Göran (27 November 2008). "Kockums kan få bygga svensknorska ubåtar" [Kockums can build Swedish Norwegian submarines]. Blekinge Läns Tidning (in Swedish) (SE). Retrieved 6 May 2012. 
  10. ^ "Norway Should Maintain Submarine Fleet: Study", Defense news .
  11. ^ Karlberg, Lars Anders (12 April 2010). "Tolgfors beställer nya ubåtar och nya helikoptrar" [Tolgfors order new submarines and new helicopters]. Ny Teknik (in Swedish) (SE). Retrieved 11 September 2010. 
  12. ^ "Sverige ska satsa på nya ubåtar" [Sweden to invest in new submarines]. Svenska Dagbladet (in Swedish) (SE). 11 April 2010. Retrieved 11 September 2010. 
  13. ^ "Swedish Parliament Approves Procuring of New Submarines". defencetalk.com. 24 June 2010. Retrieved 11 September 2010. 
  14. ^ "Riksdagen tar beslut om nya ubåtar" [The Riksdag decides on new submarines] (in Swedish). Kockums. 16 June 2010. Archived from the original on 13 August 2010. Retrieved 11 September 2010. 
  15. ^ "Kockums hoppas på ubåtsaffär" [Kockums hope for submarine business], DI (in Swedish) (SE), 28 March 2013 
  16. ^ "Svensk mästare på kurragömma" [Swedish champion at hide and seek], Ny Teknik (in Swedish) (SE) 
  17. ^ Kleja, Monica (18 September 2013 Ny Teknik), Superubåten A26 försenad [Super Submarine A26 delayed] (in Swedish), SE  Check date values in: |date= (help).
  18. ^ "Allt det senaste om Kockums" [All the latest about Kockums], SvD Näringsliv (in Swedish) (SE), 27 February 2014: 7  |chapter= ignored (help).
  19. ^ Bjarke, Louise, ed. (27 February 2014) [2014-02-26 20 h 23], FMV beställer strategi för undervattensområdet [FMV orders strategy for the underwater sector] (in Swedish), SE: FMV .
  20. ^ "Blir Saab räddningen för 250 ubåtsingenjörer?" [Will Saab save 250 submarine engineers?], Veckans Affärer (in Swedish) (SE), 3 March 2014 .
  21. ^ "Allt det senaste om Kockums" [All the latest about Kockums], SvD Näringsliv (in Swedish) (SE), 10 March 2014: 11  |chapter= ignored (help).
  22. ^ "Regeringen stoppar planerad ubåtsaffär" [Government stops scheduled submarine business], SVT (in Swedish) (SE), 2 April 2014 .
  23. ^ Logothetis, Afroditi (14 April 2014), "Saab köper Kockums" [Saab buys Kockums], DI (in Swedish) .
  24. ^ "Thyßen Krupp sells Swedish shipyards to Saab", Defense news, 30 June 2014 .
  25. ^ "Saabs köp av Kockums klart" [Saab's purchase of Kockums clear], SvD Näringsliv (in Swedish) (SE), 22 July 2014 .