Bury–Holcombe Brook line

From Wikipedia, the free encyclopedia
(Redirected from Bury to Holcombe Brook Line)

This viaduct, which spans the river Irwell, was part of the Bury–Holcombe Brook branch line built in 1882. The railway line closed in 1963 but the old track bed is still in use today as the Kirklees Trail cycle way and footpath.
Bury to Holcombe Brook Line
Holcombe Brook
Greenmount
Knowles L.C. Halt
Tottington
Sunny Wood Halt
Woolfold
Brandlesholme Road Halt
Ramsbottom
Woodhill Road Halt
Summerseat
Bury Bolton Street
Knowsley Street
Bury Interchange

The Bury–Holcombe Brook line was a 3+34-mile (6.0 km) single-track railway line which ran between Bury Bolton Street railway station and Holcombe Brook railway station via seven intermediate stations, Woodhill Road Halt, Brandlesholme Road Halt, Woolfold, Sunny Wood Halt, Tottington, Knowles Halt, and Greenmount.

History[edit]

Bury and Tottington District Railway Act 1877
Act of Parliament
Long titleAn Act for making a Railway from Bury to Tottington, with branches, in the county palatine of Lancaster.
Citation40 & 41 Vict. c. clvii
Dates
Royal assent2 August 1877
Text of statute as originally enacted

Opened in 1882 by the Bury and Tottington District Railway the line was taken over by the Lancashire and Yorkshire Railway in 1888. Initially the line had stations at Woolfold, Greenmount, Tottington and Holcombe Brook with additional halts opening at Woodhill Road, Brandlesholme Road, Sunnywood and Knowles Crossing in 1905.

Passenger services operated until 1952, while freight services continued to Holcombe Brook until 1960 and Tottington until 1963.

Electrification[edit]

In 1912 Dick, Kerr & Co.‘s Preston factory were considering tendering for a Brazilian contract and approached the Lancashire and Yorkshire Railway to use the branch for test purposes at Dick, Kerr's expense. The line from Bury Bolton Street Station to Holcombe Brook was electrified with the overhead 3.5 kV dc system, rolling stock was also supplied at their cost. After prolonged trials the trains entered public use on 29 July 1913. The L&Y purchased the equipment and stock on the successful completion of the trials in 1916. During 1917 work started on the branch to convert to third rail to match the Manchester to Bury system. The third rail trains started to run on 29 March 1918.

Kirklees Trail[edit]

The start of the Kirklees Trail at Greenmount in 2007

The section of the line from Greenmount to Bury town centre has been converted into a pedestrian and cycle route, the Kirklees Trail, forming part of National Cycle Route 6. Sustrans built a new 65 metres (213 ft) long bridge over the Kirklees Valley to replace the demolished Woolfold viaduct.[1][2][3]

See also[edit]

References[edit]

  • Signal Boxes on Lancashire and Yorkshire Railway Lines: North and West of Manchester: Part Two by Chris Littleworth (Lancashire & Yorkshire Railway Society, 2014: ISBN 978-0-9559467-6-9)
  • Lost Railways of Lancashire by Gordon Suggitt (ISBN 1-85306-801-2)
  1. ^ "Railway line renovation in Bury". Sustrans. Retrieved 12 February 2018. Includes photograph of new bridge
  2. ^ "Kirklees Trail". Visit Bury. Retrieved 12 February 2018.
  3. ^ "Bury's bid for £500,000 towards Kirklees Trail". Bury Times. 29 November 2007. Retrieved 12 February 2018. Includes description of demolition of old viaduct

External links[edit]