Butovskaya Line

From Wikipedia, the free encyclopedia
  (Redirected from Butovskaya Light Metro Line)
Jump to: navigation, search
Butovskaya Line
Overview
Type Rapid transit
System Moscow Metro
Locale Moscow
Termini Ulitsa Starokachalovskaya (north)
Buninskaya Alleya (south)
Stations 5
Daily ridership 50.600
Operation
Opened December 27, 2003
Owner Moskovsky Metropoliten
Operator(s) Moskovsky Metropoliten
Character At-grade
Rolling stock 81-717/714
Technical
Line length 5.2 kilometres (3.2 mi)
Track gauge 1,520 mm (4 ft 11 56 in)
Electrification Third rail
Route map
Unknown BSicon "utINTa"
Ulitsa Starokachalovskaya Transfer to #9 Serpukhovsko-Timiryazevskaya Line at Bulvar Dmitriya Donskogo.
Unknown BSicon "uTUNNELe-ELEV"
↑ north-bound
Unknown BSicon "uhBHF"
Ulitsa Skobelevskaya ↓ south-bound
Unknown BSicon "uhBHF"
Bulvar Admirala Ushakova
Unknown BSicon "uhBHF"
Ulitsa Gorchakova
Unknown BSicon "uhKBHFe"
Buninskaya Alleya

Butovskaya Line (Russian: Бу́товская ли́ния) is a Light Metro line of the Moscow Metro. The line symbolizes an experiment of building rapid-transit in areas where tunnel boring is considered expensive and impractical. In the past, attempts were made to build lines on ground level, however as the Filyovskaya Line showed, harsh Russian winters and the occupation of the large amount of useful land, make such projects a failure. However, new districts on the very edge of the city, particularly those outside Moscow Automobile Ring Road (MKAD) required a rapid-transit connection. As the practicality of tunnel boring is unclear, the system was planned to be above ground since the late 1980s, when Moscow Metro design bureau, Metrogiprotrans, developed a set of projects that would bring rapid-transit beyond MKAD, with the Yuzhnoye Butovo District being the first one.[1]

The term Light Metro (Лёгкое метро́) was applied to these new projects, as it would feature an elevated track on a continuous flyover. Specific rolling stock had to be developed to serve the track, as it would have to be resistant to the open climate elements and sharper bends. For ease of operation, the Light Metro was integrated into the classical Metro service.[2]

The Butovskaya Line essentially continues the Serpukhovsky radius of the Serpukhovsko-Timiryazevskaya Line. For convenience, the first 1.8 kilometers were bored in a tunnel allowing for a convenient transfer with the terminus of the main line, Bulvar Dmitriya Donskogo. For the rest of its length it follows a flyover, guarded by a sound barrier, with both single and dual tracks. Currently, four Light Metro stations, each of identical design, are in operation. The system was opened in December 2003.

Contents

[edit] Timeline

Segment Date opened Length
Ulitsa Strarokachalovskaya-Buninskaya Alleya December 27, 2003 5.5 km
Total: 5 Stations 5.5 km

[edit] Transfers

# Transfer to At
9 Serpukhovsko-Timiryazevskaya Line Ulitsa Starokachalovskaya

[edit] Rolling stock

The line shares the Varshavskoe depot (№ 8) with the Serpukhovsko-Timiryazevskaya Line. Specially built 81-740/741 Rusich trains serve this line. These are adapted to surface climate and to more rigorous bends and folds in the track. A total of 12 three-carriage trains are currently assigned.

[edit] Accessibility

All stations except Starokachalovskaya str. have a lift for wheelchair users only.

[edit] Recent developments and future plans

Southern terminus.
Flyover carrying the line.

Although the Light Metro was indeed innovative, it also received its share of criticism from different social groups and the media, which could well affect its future.

The main problems arose from finances, as the design was originally planned to be cost-saving; however, the BLLM turned out to be more expensive than conventional Metro lines.[3] Passenger discomfort arose from shorter trains and larger intervals, but in particular from the transfer at Ulitsa Starokachalovskaya/Bulvar Dmitriya Donskogo, where the Light Metro station consists of two separated platforms on either side of the main line with no reversal sidings behind it. As a result passengers must queue for lengthier times at a platform and also deal with exiting traffic before boarding their train. Additional problems arose from the landscape damage done by the flyover bridge.

Furthermore, costly and embarrassing improvements had to be made just a few months after opening. First, improvements had to be made to the faulty new trains, as they required immediate and unforeseen refits; in addition, despite the sound barriers, further noise reduction works had to be carried out on the tracks themselves by repairing their joints.

Despite the criticism, the Moscow Metro continues to put forward several expansion programs for the BLLM, the first one of which is to place proper reversal sidings north of the station thus separating the terminus platforms into northbound and southbound roles; at present this is announced for 2010. After the completion of that there was initially a planned northwestwards underground extension towards the terminus of the Kaluzhsko-Rizhskaya Line, Novoyasenevskaya scheduled for 2013. Since then Moscow Metro has postponed the project and even taken it off its list of primarily projects to be completed by 2015.[4]

A further three-station expansion to the southeast, as Butovo continues to grow, is proposed: Ulitsa Staropotapovskaya, Ulitsa Ostafyevskaya and Novokuryanovo, along with a new depot. The latter's construction might prove pivotal as it would allow for the line to become more independent in operation. On the map of new plans, the extension to Milizeysky poselok (or East Sherbinka) is planned with at least two stations.

The problems with the Butovo Line have also affected the prospect of other Light Metro lines in general as the second planned line, the Solntsevskaya Light Metro Line, has now been canceled. Its construction was planned to begin in 2004, with the line expected to open in 2006, but after repeated postponements, Moscow Metro decided that it would be more practical to revert to an older project — a conventional, Solntsevskaya Line. After the SL's cancellation, there have been concerns that BL's fate could be much worse, as there are arguments that it would be more practical to disassemble the line and replace it with two-three station extension of the STL.

Despite the shortcomings, one positive aspect of the BL is that the 81-740/741 trains, serial production of the rolling stock, have gained wider usage and are now dominant on the Filyovskaya Line, having replaced all of the older trains and is now growing its share of the Arbatsko-Pokrovskaya Line.

[edit] See also

[edit] References

[edit] External links

Personal tools
Namespaces

Variants
Actions
Navigation
Interaction
Toolbox
Print/export
Languages