Cemetery Road Metrolink station

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Manchester metrolink logo.PNG Cemetery Road
Manchester Metrolink
Location
Place Droylsden
Local authority Metropolitan Borough of Tameside
Platforms 2
Fare zone information
Metrolink Zone
Present status Under construction
History
Opening Summer 2012
Tramway template.pngUK Trams portal


Cemetery Road Metrolink Station is a future station proposed in Phase 3b of the Manchester Metrolink. The station is scheduled to open in the summer of 2012[1] and will be located on the East Manchester line on Manchester at the junction of Cemetery Road[2].

[edit] Services

Trams are scheduled along the East Manchester line westbound towards Manchester Piccadilly station before continuing through the city centre towards other destinations, whilst eastbound trams will head towards Ashton-under-Lyne. Trams will run every 12 minutes Monday-Saturday daytime, increasing to every 6 minutes at peak times. On Sundays and Bank Holidays, there will be a 15 minute service[1].

Preceding station   Manchester Metrolink Manchester Metrolink   Following station
    Under Construction    
East Manchester Line

[edit] References

[edit] External links

Coordinates: 53°28′48″N 2°09′18″W / 53.4799°N 2.1549°W / 53.4799; -2.1549


Personal tools
Namespaces

Variants
Actions
Navigation
Interaction
Toolbox
Print/export