Jump to content

Line 7 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
(Redirected from Dark Blue Line (Shenzhen))
Line 7
Overview
Native name七号线; 七號線; Qī hào xiàn
StatusOperational
LocaleShenzhen, China
Termini
Stations27
Color on map     Blue (#0035ad)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Shenyun depot
Antuo Hill stabling yard
Rolling stockCRRC Changchun (701-741/742)(6A/3A+3A)
Daily ridership619,000 (2018 Peak)[1]
History
Opened28 October 2016; 8 years ago (2016-10-28)
Technical
Line length30.173 km (18.75 mi)[2]
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (overhead line)
Operating speed80 km/h (50 mph)
SignallingCBTC Moving block
Route map

Xuefu Hospital
Peking University
Xili Lake
Xili
connection to Line 5
Chaguang
Zhuguang
Longjing
Taoyuancun
Shenyun
Antuo Hill Stabling Yard
Shenyun Depot
connection to Line 2
Antuo Hill
Nonglin
9 to Wenjin Right arrow
Chegongmiao
Shangsha
Shawei
Shixia
Huanggangcun
Fumin
Huanggang Checkpoint
Fulin
Chiwei
Huaqiang South
Huaqiang North
Huaxin
Huangmugang
Bagualing
Hongling North
Sungang
Honghu
Tianbei
Tai'an

Shenzhen Metro Line 7 is a line with a length of 30.173 km (18.749 mi)[2] and a total of 27 stations. It connects Xili Lake to Tai'an, travelling East–West across Shenzhen in a "V" shape. Construction started on 23 October 2012, with track laying complete in April 2016.[3] The line started service on 28 October 2016. Line 7's color is dark blue.[4]

History

[edit]
Segment Commencement Length Station(s) Name
Xili Lake — Tai'an 28 October 2016 30.173 km (18.75 mi)[2] 27 (initial phase)

Stations

[edit]
Service
routes
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
SZU Lihu Campus 深大丽湖  27  Nanshan
Peking University 北大
Xili Lake 西丽湖 36 49 66 101 104 226 B736 B796 B797 M369 M460 M492 0.00 0.00
Xili 西丽 5  27  19 36 54 66 67 74 81 101 104 122 226 233 235 237 316 325 325B 326 332 382 392 392区间 797 B604 B708 B796 B797 E19 M203 M243 M299 M343 M345 M369 M385 M393 M429 M459 M492 N8 Peak-time 75(高峰75) Peak-time 93(高峰93) Peak-time 94(高峰94) Peak-time 104(高峰104) 2.20 2.20
Chaguang 茶光 19 36 54 66 67 74 81 101 226 233 237 316 325 332 392 392区间 B604 B708 M203 M243 M299 M343 M345 M429 M492 N8 Peak-time 69(高峰69) Peak-time 93(高峰93) Peak-time 94(高峰94) Peak-time 104(高峰104) 0.75 2.95
Zhuguang 珠光  29  19 72 104 201 235 316 325 326 334 B707 M203 M369 M474 N8 Peak-time 26(高峰26) Peak-time 69(高峰69) 1.10 4.05
Longjing 龙井 19 26 58 67 72 201 235 316 325 326 334 B707 M203 M369 M474 N8 Peak-time 62(高峰62) Peak-time 69(高峰69) 1.60 5.65
Taoyuancun 桃源村 19 26 41 58 67 72 104 201 235 316 325 326 334 B706 B707 M203 M369 M474 N8 Peak-time 49(高峰49) Peak-time 62(高峰62) Peak-time 69(高峰69) 0.80 6.45
Shenyun 深云 41 201 235 B729 M240 M358 M364 1.30 7.75
Antuo Hill 安托山 2 8 374 B733 1.60 9.35 Futian
Nonglin 农林 70 73 107 108 326 328 374 B611 B697 M312 M500 1.90 11.25
Chegongmiao 车公庙 1 9 11 21 26 28 79 101 113 121 123 202 204 209 213 222 223 234 303 324 326 338 365 372 M372 M391 M392 M413 M414 M435 M447 M448 M500 N4 N6 Peak-time 18(高峰18) Peak-time 62(高峰62) Peak-time 119(高峰119) 1.55 12.80
Shangsha 上沙  22  26 28 44 71 80 103 121 202 215 303 317 322 339 362 372 374 377 B689 M347 M362 M370 M433 M453 M500 Futian-FTZ 1(福田保税区1) 1.60 14.40
Shawei 沙尾 26 44 71 80 103 121 202 303 317 322 339 372 377 B685 B689 M347 M362 M370 M433 M453 M500 0.80 15.20
Shixia 石厦 3 28 34 73 202 303 372 B689 K113 M370 M389 M390 Peak-time 14(高峰14) 1.40 16.60
Huanggangcun 皇岗村 28 34 63 73 202 303 372 385 B689 B858 K113 M370 N10 0.65 17.25
Fumin 福民 4 10 4 26 28 52 60 62 73 103 202 203 225 235 303 339 362 372 377 385 B689 B858 M204 M362 M370 M389 M441 M476 N9 Peak-time 21(高峰21) 0.60 17.85
Huanggang Checkpoint 皇岗口岸 9 23 26 121 235 313 325 326 338 357 362 366 M433 N25 Airport 9(机场9) 1.00 18.85
Fulin 福邻 0.75 19.60
Chiwei 赤尾 23 28 52 73 214 229 337 366 369 372 382 J1 M362 M463 0.80 20.40
Huaqiang South 华强南  11  9 13 14 23 32 38 62 63 214 216 225 317 377 385 391 B622 B812 M370 M374 N10 N14 Peak-time 106(高峰106) 0.70 21.10
Huaqiang North 华强北 2 8 65 67 80 302区间 M202 M389 M476 0.70 21.80
Huaxin 华新 3 10 13 41 59 64 67 108 123 225 236 303 311 383 385 K105 N6 Peak-express 4(高快4) Peak-time 119(高峰119) 0.60 22.40
Huangmugang 黄木岗 14 9 11 12 46 58 59 79 102 107 111 207 209 213 216 234 302 302区间 317 317区间 320 322 323 333 357 365 371 379 398 B615 B622 E2 E5 E11 E12 E20 M201 M202 M203 M369 M401 M405 M414 M460 M481 N6 N12 N25 U1 Peak-time 95(高峰95) Sightseeing 2(观光2) 0.65 23.05
Bagualing 八卦岭 6 323 M152 M156 1.30 24.35
Hongling North 红岭北 9 5 8 Peak-time 29(Original 9) 23 57 69 79 85 222 321 323 385 E8 E25 M105 M193 M360 M389 M463 N6 N16 N17 N25 1.00 25.35 Luohu
Sungang 笋岗  17  18 57 63 69 80 225 303 322 323 333 366 371 381 323区间 366区间 M132 M482 M406 N10 0.70 26.05
Honghu 洪湖 1 27 80 82 213 303 307 312 320 322 323 357 363 366 369 371 377 977 M183 M192 M203 M239 M402 M403 M404 M406 M408 M414 M437 M526 M555 N7 N19 Holiday 12、Peak-time 32(高峰32) Peak-express 20 (高快20) 1.30 27.35
Tianbei 田贝 3 1 2 40 57 59 62 83 107 203 242 320 333 376 977 M482 N2 N6 N7 0.70 28.05
Tai'an 太安 5 2 23 308 363 376 B840 M364 M437 Dameisha-holiday 2(大梅沙假日2) 1.10 29.15
Wenti Park[a] 文体公园 Nanshan
  1. ^ The station is staff-only. Not open to public.

Staff-only branch

[edit]

A branch to Wenti Park station is operating. Wenti Park station is a staff-only station.

Extension

[edit]
Phase 2

The Phase 2 of Line 7 is 2.67 km (1.66 mi) in length with 2 new stations. It is expected to open before 2025. The extension will be fully underground.[5]

Rolling stock

[edit]

In 2014, Shenzhen Metro Group purchased 70 trains (420 carriages) from CNR Changchun Railway Vehicles for the future Line 7 and Line 9, in which Line 7 will use 41 while Line 9 will use 29.[6] The first train arrived in mid-March 2016.

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2015–2016 A-size stock 41 0701-0741 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles

References

[edit]
  1. ^ "创历史新高!21日深圳地铁总客流量达646.9万人次". stnn.cc. 2018-07-21.
  2. ^ a b c "深圳地铁7、9号线试运营 轨道网络规模居国内第三". 2016-10-28.
  3. ^ 记录施工中的深圳地铁7号线 (in Chinese). Shenzhen News. 2012-11-12. Archived from the original on 2013-12-14. Retrieved 2014-01-21.
  4. ^ 深圳地铁7号线和9号线10月底通车 比计划提前两个月. Archived from the original on 14 May 2017. Retrieved 27 August 2016.
  5. ^ "深圳地铁四期调整路线五个项目开工 预计2025年陆续通车".
  6. ^ "中国北车揽30亿元深圳地铁大单 将装备7号线和9号线_深圳新闻_最全最迅速的深圳资讯—深圳新闻网". www.sznews.com (in Chinese). Archived from the original on 2015-09-27. Retrieved 2016-06-11.