Energy in Jordan describes energy and electricity production, consumption and import in Jordan. Jordan is among the highest in the world in dependency on foreign energy sources, with 96% of the country's energy needs coming from imported oil and natural gas from neighboring Arab countries. This complete reliance on foreign oil imports consumes a significant amount of Jordan's GDP. This led the country to plan investments of $15 billion in renewable and nuclear energy. To further address these problems, the National Energy Strategy for 2007-2020 was created which projects within the next decade to boost reliance on domestic energy sources from 4 per cent to 40 per cent by the end of the decade.

Moreover, multiple attacks on the Arab Gas Pipeline between February and September - which supplies 88% of the country's electricity generation needs - forced the country’s power plants onto diesel and heavy fuel oil, costing the treasury millions of dinars and pushing the national energy bill to record highs, over JD4 billion.

Primary energy use in Jordan was in 2009 87 TWh and 15 TWh per million persons and in 2008 82 TWh and 14 TWh/million persons.[1]

Overview[edit]

Energy in Jordan[2]
Capita Prim. energy Production Import Electricity CO2-emission
Million TWh TWh TWh TWh Mt
2004 5.44 76 3 74 8.57 16.70
2007 5.72 84 3 85 11.18 19.17
2008 5.91 82 3 83 12.13 18.42
2009 5.95 87 3 87 12.5 19.20
Change 2004-2009 9.4% 14.3% 0% 17.7% 46% 15.0%
Mtoe = 11.63 TWh, Prim. energy includes energy losses.

Natural gas[edit]

Natural gas is increasingly being used to fulfill the country’s domestic energy needs, especially with regard to electricity generation. Jordan was estimated to have only modest natural gas reserves (about 6 billion cubic meters in 2002), but new estimates suggest a much higher total. In 2003 the country produced and consumed an estimated 390 million cubic meters of natural gas. The primary source is located in the eastern portion of the country at the Risha gas field. The country imports the bulk of its natural gas via the recently completed Arab Gas Pipeline that stretches from the Al Arish terminal in Egypt underwater to Al Aqabah and then to northern Jordan, where it links to two major power stations. This Egypt–Jordan pipeline supplies Jordan with approximately 1 billion cubic meters of natural gas per year.[3] The ministry is also moving forward with plans to construct a liquid gas terminal in the Port of Aqaba by 2013.

Jordan has developed one gas field, at Risha in the eastern desert near the border with Iraq. The current output of around 30 million cubic feet per day (Mmcf/d) from the Risha field is used to fuel one nearby power plant, which generates about 10% of Jordan's electricity.[4]

In May 2001, a 30-year agreement had been concluded with Egypt for gas sales to begin at a rate of 100 Mmcf/d beginning in 2003. Construction of the section of the pipeline in Egypt began in late 2001, starting from the existing pipeline terminus at El-Arish in Sinai. This section was completed in mid-2003, allowing deliveries to begin to one power plant at Aqaba.

In August 2003, Jordan began imports of natural gas from Egypt.[4] The second phase of the project, which connected to the Rihab power plant approximately 70 km north of the capital Amman, was completed in early 2006. The plant site is approximately 835 meters above sea level and located within a rural area surrounded by extensive agricultural land. The Rihab power plant comprises 2 simple cycle gas turbines which are nominally rated at 30 MW gross and a 297 MW combined-cycle gas turbine which comprises 2 gas turbines with 100 MW and 1 steam turbine with 97 MW.[5]

Oil shale[edit]

Main article: Oil shale in Jordan

Oil shale represents a significant potential resource in Jordan. Oil shale deposits underlie more than 60% of Jordanian territory, and are estimated at 40 to 70 billion tonnes of oil shale.[6] The deposits include a high quality marinite oil shale of Late Cretaceous to early Tertiary age.[7] The most important and investigated deposits are located in west-central Jordan, where they occur at the surface and close to developed infrastructure.[6][8]

Although oil shale was utilized in northern Jordan prior to and during World War I, intensive exploration and studies of Jordan's oil shale resource potential started in the 1970s and 1980s, being motivated by higher oil prices, modern technology and better economic potential. As of 2011, no oil shale industry exists in Jordan, but several companies are considering both shale oil extraction and oil shale combustion for thermal power generation.[9]

A series of projects is set to make available 37,000 tonnes of shale oil in the central region of Attarat by 2015, 15,000 tonnes in Karak by 2017, and develop thousands of tonnes in potential shale reserves along the Jordanian-Iraqi border.

Nuclear[edit]

Jordan has signed memorandums of understanding with the United States, United Kingdom, Canada, France, Japan, China, Russia, Spain, South Korea, Argentina, Romania, and Turkey.[10][11][12]

Plans are in place to construct two 1,000MW reactors, nearly doubling the Kingdom's electricity generation capacity, by 2022. Jordan plans to get 60% of its energy needs from nuclear energy by 2035. According to the JAEC, all evaluations took into account the highest safety requirements, including lessons from the Fukushima incident. The plants will be used for electricity generation and desalination.[13]

The government first chose a site 25 kilometers south of the Red Sea port of Aqaba[10][11] but shifted the tentative location to the Mafraq area, 40 kilometers northeast of Amman, citing the proximity to the Khirbet Al Samra power plant for using its wastewater to cool the reactor. The decision to relocate the site was taken by the Belgian contractor, Tractabel, which has concluded that the seismic padding required to build on the original site near Aqaba would have led to additional costs of about 15 percent according to JAEC officials.[12]

In December 2009, Jordan Atomic Energy Commission (JAEC) in cooperation with a consortium headed by the Korean Atomic Energy Research Institute signed an agreement with Daewoo Heavy Industries to build a its first 5 MW research reactor by 2015 at the Jordan University of Science and Technology.[14]

Renewable[edit]

The National Energy Strategy includes ambitious targets to increase the contribution of renewable energy sources to the national energy supply. The share of renewable energy in the total energy mix is anticipated to reach 7% by 2015 and 10% by 2020. Plans are in place for up to 2,000MW in solar and wind energy projects by the end of the decade, with 64 international firms expressing interest in various projects across the country. The government is looking to generate 30-50MW of biomass by 2020.[15] The passage of the Renewable Energy and Energy Efficiency Law, which aims to streamline investment procedures and paves the way for citizens to sell electricity back to the national grid, would go a long way into breathing life into the alternative energy sector.[16]

Solar[edit]

Jordan lies within the solar belt of the world with average solar radiation ranging between 5 and 7 KWh/m2. Decentralized photovoltaic units in rural and remote villages are currently used for lighting, water pumping and other social services (1000KW of peak capacity). In addition, about 15% of all households are equipped with solar water heating systems.[17] In May 2012, a 280 kilo watt solar electricity system was inaugurated to be used at El Hassan Science City.[18]

As per the Energy Master Plan, 30 percent of all households are expected to be equipped with solar water heating system by the year 2020.[17] The government is hoping to construct the first Concentrated Solar Power (CSP) demonstration project in the short to medium term and is considering Aqaba and the south-eastern region for this purpose. It is also planning to have solar desalination plant. According to the national strategy the planned installed capacity will amount to 300MW – 600MW (CSP, PV and hybrid power plants) by 2020.[17]

Kawar Energy in partnership with Ma'an Development Area (MDA) has announced the launch of its $400 million Shams Ma’an Project, a 100MW photovoltaic (PV) power plant project to come up at the MDA industrial park in Jordan. The project on completion, expected to be ready in 2012, will be the largest PV plant in the world, and will position Jordan on the global renewable energy map. It aims to utilize approximately 360,000 to 2 million PV/CPV panels and produce around 168 GWh per year.[17]

California-based company Ausra has been chosen to supply solar steam boilers to the 100MW JOAN1 concentrated solar thermal power (CSP) project in development in Ma’an. The JOAN1 project is expected to enter operation in 2013 and will be the largest CSP project in the world using direct solar steam generation. JOAN1 will use dry cooling to conserve water.[17]

Jordan inaugurated its first solar-powered charging station for electric cars in February 2012. Located at El Hassan Science City (EHSC), the station is considered the first step towards promoting solar-powered vehicles and building more solar-charging facilities on the streets of Jordan.[19]

The Sahara Forest Project, a Norwegian endeavour to create oases in hot, arid and uninhabited lands, is currently being implemented in the southern city of Aqaba, with the cooperation of the Aqaba Special Economic Zone Authority, to address its food, water and energy challenges. The objective of the project is to enable restorative growth, revegetation, and creation of green jobs through the profitable production of food, freshwater, bio fuels and electricity. The three core components of the Sahara Forest Project are saltwater-cooled greenhouses, concentrated solar power (CSP) for electricity and heat generation, and technologies for desert revegetation.[20]

Wind[edit]

320 kW Ibrahimyah Wind Power Plant.

Jordan currently operates two wind power plants at Ibrahimyah and Hofa. The Ibrahimyah plant, located approximately 80 km north of Amman, consists of 4 wind turbines with capacity 0.08 MW for each.[21] The Hofa plant, located approximately 92 km north of Amman, consists of 5 wind turbines with capacity 0.225 MW for each.[22]

Plans are in place for an 80-90MW wind plant in Fujeij, near Wadi Musa, and wind turbine stations at Al Harir, Maan and Wadi Araba to produce 300-400MW of electricity.[15] Fujeij, the Kingdom’s first large-scale renewable energy project, is expected to be operational by 2014.[23]

Proposals for the 30-40 megawatt (MW) plant at Kamshah, near Jerash, have been delayed several times over the price of electricity tariffs quoted by the winning bidder.[15] With the advancements in wind power technology, the ministry has previously expressed its intention to meet its goal of 600MW of wind energy by 2015, five years ahead of schedule.[16]

See also[edit]

References[edit]

  1. ^ IEA Key energy statistics 2011 Statistics 2010 Page: Country specific indicator numbers from page 48
  2. ^ IEA Key World Energy Statistics 2011, 2010, 2009, 2006 IEA October, crude oil p.11, coal p. 13 gas p. 15
  3. ^ "Country Profile: Jordan". Library of Congress Federal Research Division (September 2006).  This article incorporates text from this source, which is in the public domain.
  4. ^ a b MBendi: Natural Gas Liquid Extraction in Jordan
  5. ^ CEGCO Rehab Gas Turbine Power Station
  6. ^ a b Dyni, John R. (2006). Geology and resources of some world oil-shale deposits. Scientific Investigations Report 2005–5294 (PDF). U.S. Department of the Interior. U.S. Geological Survey. Retrieved 2008-10-25. 
  7. ^ Alali, Jamal (2006-11-07). "Jordan Oil Shale, Availability, Distribution, And Investment Opportunity" (PDF). Amman, Jordan: International Oil Shale Conference. Retrieved 2008-10-25. 
  8. ^ Hamarneh, Yousef; Alali, Jamal; Sawaged, Suzan (2006). Oil Shale Resources Development In Jordan (PDF). Amman: Natural Resources Authority of Jordan. Retrieved 2008-10-25. 
  9. ^ Luck, Taylor (2008-08-07). "Jordan set to tap oil shale potential". Jordan Times. Retrieved 2008-10-25. 
  10. ^ a b "Japan and Jordan agree to cooperate". World Nuclear News. 2009-04-14. Retrieved 2010-05-01. 
  11. ^ a b "Jordan and China sign nuclear agreement". World Nuclear News. 2008-08-20. Retrieved 2010-05-01. 
  12. ^ a b http://arabnews.com/middleeast/article455480.ece
  13. ^ Yoav Stern (2007-06-12). "Jordan announces plans to build nuclear power plant by 2015". Haaretz. Retrieved 2007-07-15. 
  14. ^ "Jordan: proposed nuclear sites 'suitable'". World Nuclear News. 2010-04-27. Retrieved 2010-05-01. 
  15. ^ a b c Negotiations-stalling-Jordans-first-wind-power-plant
  16. ^ a b 'Unstable’ gas supplies highlight potential energy crisis in Jordan'
  17. ^ a b c d e Solar Energy in Jordan
  18. ^ Princess Sumaya inaugurates 280kw solar electricity system
  19. ^ Kingdom’s first solar-powered electric vehicle charging station opens
  20. ^ Jordan-Green-project-to-produce-food-energy-from-sun-and-seawater
  21. ^ Ibrahimiyah Power Plant
  22. ^ Hofa Wind Power Plant
  23. ^ BIOSITE: Jordan Three Years Away from First Wind Farm