Fugen Nuclear Power Plant
|
|
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. (March 2011) |
| Fugen Nuclear Power Plant | |
|---|---|
The Fugen NPP in 1975, Image: Japan Ministry of Land, Infrastructure and Transport |
|
|
|
|
| Country | Japan |
| Coordinates | 35°45′16″N 136°00′59″E / 35.75444°N 136.01639°ECoordinates: 35°45′16″N 136°00′59″E / 35.75444°N 136.01639°E |
| Construction began | May 10, 1972 |
| Commission date | March 20, 1979 |
| Decommission date | March 29, 2003 |
| Operator(s) | Japan Atomic Energy Agency |
| Reactor information | |
| Reactors decom. | 1 x 165 MW |
| Reactor type(s) | HWLWR |
| Power generation information | |
| Annual generation | 345 GW·h |
| Net generation | 8,448.92 GW·h |
| As of 2003 | |
Fugen ふげん (Fugen) is a prototype Japanese nuclear test reactor that is currently shut down and awaiting decommissioning. It is located in the Myōjin chō in the city of Tsuruga, Fukui. The design is an Advanced Thermal Reactor, which is a product of Japan. The name "Fugen" is derived from the Fugen Bosatsu (Samantabhadra) god in Buddhism.
The reactor was the first in the world to use a full MOX fuel core. It had 772 assemblies, the most in the world. It has received the title of a historic landmark from the American Nuclear Society.
The design boils ordinary water like a boiling water reactor (BWR) but uses heavy water as a moderator as in a CANDU reactor. The electrical output was 165 MW and the thermal output was 557 MW. On March 3, 2005, the reactor stopped operations.
- Core temperature: 300 °C
- Pellet centerline temperature: 2200 °C
- Fuel conversion time: 6 months
The plant is located on a site that spans 267,694 m2 (66 acres), the buildings occupy 7,762 m2 (1.9 acres), and it has 46,488 m2 of floor space. It employs 256 workers.[1]
[edit] Accidents
- 14 - 16 April 1997 a tritium leakage was announced to the responsible authorities 30 hours after the event. During the following investigation it was shown that it already had 11 similar incidents. Five managers of the operator at that time (at the time: Power Reactor and Nuclear Fuel Development Corporation) resigned.
- 8 April 2002 about 200 cubic meters of steam escaped from a defective pipe. The reactor was switched off.
Also with dismantling there were surprises: With controls it was stated that walls at 25 of 34 points did not have the necessary strength.
[edit] References
- ^ JAEA (Japanese). Facilities Quick View.
[edit] External links
- Official website
- Fugen Decommissioning Engineering Center
- Transcript of NHK TV special in Japanese NHK video
|
|||||||||||||||||||||||