Gatwick Airport railway station
| Gatwick Airport |
|
|---|---|
| View across the south side of the platforms | |
| Location | |
| Place | London Gatwick Airport |
| Local authority | Crawley, West Sussex |
| Coordinates | 51°09′23″N 0°09′39″W / 51.1565°N 0.1609°WCoordinates: 51°09′23″N 0°09′39″W / 51.1565°N 0.1609°W |
| Operations | |
| Station code | GTW |
| Managed by | Southern[1] |
| Number of platforms | 6 |
| Live arrivals/departures and station information from National Rail Enquiries |
|
| Annual rail passenger usage | |
| 2004/05 * | |
| 2005/06 * | |
| 2006/07 * | |
| 2007/08 * | |
| 2008/09 * | |
| 1891 | Opened (Gatwick) |
| 1946 | Renamed (Gatwick Racecourse) |
| 27 May 1958 | Rebuilt and renamed (Gatwick Airport) |
| National Rail - UK railway stations | |
| A B C D E F G H I J K L M N O P Q R S T U V W X Y Z | |
| * Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Gatwick Airport from Office of Rail Regulation statistics. Please note: methodology may vary year on year. | |
Gatwick Airport station is the railway station at London Gatwick Airport that provides a direct rail connection to London 43 km (26¾ miles) away. The station platforms are located directly below the airport’s South Terminal, and the ticket office is adjacent to that terminal’s concourse. The station was one of 18 in the United Kingdom to be managed by Network Rail[2], but on 29 January 2012 day-to-day management was transferred to Southern.[1] Train services are provided by Gatwick Express, Southern, First Capital Connect and First Great Western. When viewed from air (or in satellite imagery), the present station building's British Rail logo that is etched on the top of the roof is visible.[1]
Contents |
[edit] History
There have been two Gatwick stations approximately sited 0.85 miles (1.37 km) from each other.
[edit] Present station
The station, originally named Gatwick, was built on the present site in September 1891 to serve the Gatwick Racecourse, and which originally operated only on race days. The facilities included passing loops and sidings to hold race trains without impeding the Brighton Main Line.[3] The sidings were extended during the First World War to be able to accommodate munitions trains heading for Newhaven.[4]
From 1946 until 1958 Gatwick station was renamed Gatwick Racecourse, even though racing had been abandoned in 1940 and not been re-instated after the Second World War. In fact the station had fallen out of use following the opening of the nearby Tinsley Green/Gatwick airport station (described below). However, during the early 1950s the airport was expanded and took over the land occupied by the racecourse, and the station was entirely rebuilt and integrated with the new airport terminal. The new buildings opened on 27 May 1958 with a regular train service, and the station took over the name Gatwick Airport.
[edit] Tinsley Green/Gatwick Airport Station
This was opened on 30 September 1935 and was sited 0.85 miles (1.37 km) south of the present station. It was originally named Tinsley Green but within a year became Gatwick Airport following the completion of the Beehive airport terminal which had a direct connection to the station. The airport was requisitioned by the Royal Air Force in 1940, but in 1952 the British government decided that it would form London's second airport. The station continued in operation until 27 May 1958 when the new Gatwick Airport station (above) opened. The station has been demolished and the only visible remains of the old station are sections of the former up slow line platform. Sections of the connecting subway between the station and the original terminal building (The Beehive) also survive.
[edit] Services
The Gatwick Express operates every 15 minutes to London Victoria plus frequent Southern service to London Victoria and a more limited service to London Bridge. Since December 2008 Gatwick Express services have been extended, during peak hours, to and from Brighton. Southern have timetabled their services to London Victoria so that they arrive after a Gatwick Express train has just left, this discourages passengers transferring from stopping services to Gatwick Express services.
There is a First Capital Connect service every 15 minutes to Bedford, via London Bridge and St Pancras. First Great Western operate to Reading via Guildford on the North Downs Line.
| Preceding station | Following station | |||
|---|---|---|---|---|
| Horley | Southern Arun Valley Line |
Three Bridges | ||
| Redhill or Horley |
Southern Mainline West (via Horsham) |
Three Bridges | ||
| East Croydon | Southern Mainline West (via Hove) |
Haywards Heath | ||
| East Croydon | Southern Mainline East |
Haywards Heath | ||
| East Croydon | Southern Brighton Main Line |
Three Bridges or Burgess Hill |
||
| East Croydon or Redhill |
First Capital Connect Thameslink |
Three Bridges | ||
| Redhill | First Great Western North Downs Line |
Terminus | ||
| London Victoria | Southern Gatwick Express |
Terminus or Haywards Heath |
||
[edit] Redevelopment
On 13 October 2010 a £53 million redevelopment of the railway station was announced. With the aim of increasing the number of services passing through and passenger capacity, the project will see a new platform, refurbished concourse, upgraded track and signalling. Construction work is expected to be completed by the end of 2013.[5]
[edit] References
- ^ a b "Management of Gatwick Airport railway station transfers to Southern". http://www.southernrailway.com/southern/news/management-of-gatwick-airport-railway-station-transfers-to-southern/. Retrieved 30 January 2012.
- ^ "Commercial information". Complete National Rail Timetable. London: Network Rail. December 2011. p. 41. http://www.networkrail.co.uk/browse%20documents/eNRT/Dec11/Commercial_Information.pdf. Retrieved 9 January 2012.
- ^ Turner, John Howard (1979). The London Brighton and South Coast Railway 3 Completion and Maturity. Batsford. ISBN 0-7134-13819-1. p.128-9.
- ^ Pratt, Edwin (1921). British railways and the Great War. Selwyn & Blount. p.1038-9.
- ^ "Gatwick Airport unveils £53m station revamp". BBC News. 13 October 2010. http://www.bbc.co.uk/news/uk-england-sussex-11531118.
[edit] External links
- Station information on Gatwick Airport railway station from Network Rail
| Wikimedia Commons has media related to: Gatwick Airport railway station |
|
|||||||||||||||||||||||
|
||||||||
|
|||||||||||||||||||
|
|||||||||||||||||||||||||||||||
- Crawley
- Railway stations in West Sussex
- Former Southern Railway stations
- Railway stations opened in 1935
- Railway stations closed in 1958
- Former London, Brighton and South Coast Railway stations
- Railway stations opened in 1891
- Railway stations opened in 1958
- Railway stations served by CrossCountry
- Railway stations served by First Capital Connect
- Railway stations served by First Great Western
- Railway stations served by Gatwick Express
- Railway stations served by Southern
- DfT Category B stations
- Railway stations serving London airports