Howrah–Delhi main line

From Wikipedia, the free encyclopedia
  (Redirected from Howrah-Delhi main line)
Jump to: navigation, search
Howrah–Delhi main line
Overview
System Electrified
Status Operational
Locale West Bengal, Jharkhand, Bihar,
Uttar Pradesh, Delhi
Termini Howrah Station
Delhi Junction
Operation
Opened 1866
Owner Indian Railway
Operator(s) Eastern Railway, East Central Railway, Northern Railway
Technical
Line length 1,532 km (952 mi)
No. of tracks 2/4
Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Operating speed up to 160 km/h

The Howrah–Delhi main line is a railway line connecting Delhi and Kolkata cutting across northern India. The 1,532 kilometres (952 mi) railway line was opened to traffic in 1866 with the introduction of the "1 Dn / 2 Up Mail" train.[1] The first Rajdhani Express, the most prestigious train of the country, had its maiden run on this line in 1969 via Grand Chord.[1] The broad gauge track was electrified in 1976–1977 via Grand Chord.[1]

Howrah–Delhi main line
Track gauge: Broad gauge 1,676 mm (5 ft 6 in)
Delhi
Yamuna
DelhiUP border
to New Delhi
Ghaziabad
to Moradabad
to Chandausi
Aligarh
Hathras
to Badaun
to Agra
Tundla
Etawah
to Jhansi
Govindpuri
to Banda and Jhansi
Kanpur Central
to Lucknow
Fatehpur
Allahabad
Yamuna
Mirzapur
to Jabalpur
to Varanasi
Mughalsarai
to Sitarampur via Grand Chord
Karmanasa River
BiharUP border
Buxar
to Sasaram
Arrah
Koilwar Bridge across Son River
to Gaya1
Patna
Bakhtiyarpur
to Bihar Sharif, Rajgir
Mokama
to Rajendra Setu across Ganges
to Nawada ,Gaya1
Lakhisarai
Kiul
to Sahibganj Loop
BiharJharkhand border
Jasidih
to Jasidih Dumka Rampurhat Rail line
to Deoghar
Madhupur
to Madhupur-Giridih Rail line
Chittaranjan2
JharkhandWest Bengal border
to Mughalsarai via Grand Chord
Sitarampur
Asansol
to Sahibganj Loop
Khana
Bardhaman
Main Line. Chord
Howrah


1. For more information on the
Branch Lines to Gaya
see Asansol-Gaya section.

2. The town is in West Bengal
but the station is in Jharkhand.


Contents

History [edit]

The first 1 Dn / 2 Up Mail train [edit]

Railway transportation was introduced in India within 30 years of its maiden run in England. The Governor General Lord Dalhousie foresaw a tremendous potential for the speedy means of transport in securing British control over a vast country, not only in moving goods and people but also in the movement of the armed forces.[1]

The East Indian Railway Company which was formed on 1 June 1845, completed its survey for a railway line from Kolkata, then called Calcutta, to Delhi via Mirzapur in 1846. The company initially became defunct on refusal of government guarantee, which was given in 1849. Thereafter, an agreement was signed between East Indian Railway Company and the East India Company, for the construction and operation of an “experimental” line between Kolkata and Rajmahal, which would later be extended to Delhi via Mirzapur. Construction began in 1851.[1]

First train of the East Indian Railway, 1854

Howrah station was a tin shed and to reach it from Kolkata one had to cross the Hooghly in a ferry. On 15 August 1854, the first passenger train in the eastern section was operated up to Hooghly, 39 kilometres (24 mi) away. On 1 February 1855 the first train ran from Hooghly to Raniganj, 195 kilometres (121 mi) from Howrah.[1]

The line was extended up to Rajmahal in October 1859, crossing Ajay River on the way. From Rajmahal, construction progressed rapidly, moving westward along the banks of the Ganges, reaching Bhagalpur in 1861, Munger in February 1862, and opposite Varanasi (across the Ganges) in December 1862 and then on to Naini on the bank of the Yamuna. The work included EIR’s first tunnel at Jamalpur and first major bridge across the Son River at Arrah.[1]

During 1863–64, work progressed rapidly on the AllahabadKanpurTundla and AligarhGhaziabad sections. The Yamuna bridge near Delhi was completed in 1864 and EIR established the Delhi terminus. On 1 August 1864, coaches were ferried across the Yamuna at Allahabad to allow the first through train to travel from Kolkata to Delhi. The Yamuna bridge at Allahabad opened on 15 August 1865 and in 1866 Kolkata and Delhi were directly linked. The 1 Dn / 2 Up Mail train, predecessor of the Kalka Mail, started running.[1]

The “shorter main line” [edit]

With the completion of the 406 kilometres (252 mi) long line connecting Raniganj with Kiul in 1871, a “shorter main line” was in position. Initially, it was called the chord line. However, as it attracted more traffic it was designated the main line and the original line became the Sahibganj loop.[1]

On 6 December 1906, the Grand Chord line from Sitarampur to Mughalsarai via Gaya, which shortened further the Kolkata–New Delhi distance, was inaugurated by the Earl of Minto, the Viceroy and Governor-General of India. It was thrown open to traffic in 1907.[1] The total Howrah-New Delhi distance, via Grand Chord is 1,448 kilometres (900 mi), as against 1,532 kilometres (952 mi) of the Main line,[2] and 2,150 kilometres (1,340 mi) via Sahibganj Loop.[3]

New buildings [edit]

A pontoon bridge was built across the Hooghly River in 1874 to provide easy access to Howrah Station.

EIR constructed the Delhi Junction building in 1903. It then had 12 broad gauge and 3 metre gauge platforms. Howrah terminus was rebuilt as the largest railway station in India in 1905.[1]

Reorganisation [edit]

On 1 January 1925 the British Indian Government took over the management of the East Indian Railway[4] and divided it into six divisions: Howrah, Asansol, Danapur, Allahabad, Lucknow and Moradabad.[1]

On 14 April 1952, Jawaharlal Nehru, the Prime Minister of India, inaugurated two new zones of the first six zones of the Indian Railways. One of them, the Northern Railways had the three "up-stream" divisions of East Indian Railway: Allahabad, Lucknow and Moradabad, while the other, the Eastern Railways had the three "down-stream" divisions: Howrah, Asansol and Danapur and the complete Bengal Nagpur Railway.[5] Eastern Railway also had the Sealdah division, which it had acquired from the truncated Assam Bengal Railway at the time of partition.[1]

South Eastern Railway was carved out of Eastern Railway on 1 August 1955. East Central Railway was created on 1 October 2002 with separation of three divisions – Dhanbad, Mughalsarai and Danapur – of Eastern Railway.[1]

Electrification [edit]

In August 1976, the New Delhi–Howrah route (Via.Grand Chord) was the first trunk route in the country to be completely electrified for AC traction.[1]

Rajdhani Express [edit]

On 3 March 1969, Rajdhani Express had its maiden run from Howrah as a bi-weekly. Subsequently it has become a daily.[1]

While Rajdhani Express takes around nineteen hours to travel from Delhi to Howrah and vice versa, some of the other fast trains such as Poorva, Kalka Mail, New Delhi Express and Sampark Kranti Express take around twenty-three hours. Some of the slower trains such as Toofan Express and Lal Quila, with more frequent stoppages, take around thirty hours.[6]

Speed limits [edit]

Most of the Howrah–Delhi main line is classified as ‘A’ class line where trains can run up to 160 km per hour but in certain sections speeds may be limited to 120–130 km per hour. The Howrah Rajdhani (between Howrah and New Delhi) travels at an average speed of 85.8 km per hour and the Sealdah Rajdhani (between Sealdah and New Delhi) travels at an average speed of 84.70 km per hour.[7][8]

External links [edit]

References [edit]

  1. ^ a b c d e f g h i j k l m n o p R.P.Saxena. "Indian Railway History timeline". Retrieved 2011-11-12. 
  2. ^ "Howrah-New Delhi Rajdhani Express". india9. Retrieved 2011-11-12. 
  3. ^ "The Chronology of Railway development in Eastern Indian". railindia. Retrieved 2011-11-17. 
  4. ^ Rao, M.A. (1988). Indian Railways, New Delhi: National Book Trust, p.35
  5. ^ Rao, M.A. (1988). Indian Railways, New Delhi: National Book Trust, pp.42–3
  6. ^ "Train from Delhi to Howrah (Calcutta)". India Mike,com. Retrieved 2011-11-12. 
  7. ^ "Permanent Way". Track Classifications. Retrieved 2012-01-15. 
  8. ^ "Trivia". Highest speed sections of track. Retrieved 2012-01-15.