Integrated test facility
From Wikipedia, the free encyclopedia
| This article is an orphan, as few or no other articles link to it. Please introduce links to this page from related articles; suggestions may be available. (July 2011) |
|
|
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. (August 2008) |
An integrated test facility (ITF) creates a fictitious entity in a database to process test transactions simultaneously with live input. It can be used to incorporate test transactions into a normal production run of a system. Its advantage is that periodic testing does not require separate test processes. However, careful planning is necessary, and test data must be isolated from production data. Integrated test facility is considered a useful audit tool during an IT audit because it uses the same programs to compare processing using independently calculated data. This involves setting up dummy entities on an application system and processing test or production data against the entity as a means of verifying processing accuracy.[1]
[edit] References
- ^ Contemporary Auditing. Tata McGraw-Hill. p. 208. ISBN 0070585849.