Iterative and incremental development

From Wikipedia, the free encyclopedia
  (Redirected from Iterative development)
Jump to: navigation, search

Iterative and Incremental development is at the heart of a cyclic software development process developed in response to the weaknesses of the waterfall model. It starts with an initial planning and ends with deployment with the cyclic interactions in between.

An iterative development model
Software development process
Activities and steps
Requirements · Specification
Architecture · Design
Implementation · Testing
Deployment · Maintenance
Methodologies
Agile · Cleanroom ·
Iterative · RAD  · RUP  · Spiral
Waterfall · Lean
V-Model  · TDD
Supporting disciplines
Configuration management
Documentation
Quality assurance (SQA)
Project management
User experience design
Tools
Compiler  · Debugger  · Profiler
GUI designer  · Integrated development environment

Iterative and incremental development are essential parts of the Rational Unified Process, Extreme Programming and generally the various agile software development frameworks.

Contents

[edit] The Basic idea

A common mistake is to consider "iterative" and "incremental" as synonyms, which they are not. In software/systems development, however, they typically go hand in hand. The basic idea is to develop a system through repeated cycles (iterative) and in smaller portions at a time (incremental), allowing the developer to take advantage of what was learned during the development of earlier portions or versions of the system. Learning comes from both the development and use of the system, where possible key steps in the process start with a simple implementation of a subset of the software requirements and iteratively enhance the evolving versions until the full system is implemented. At each iteration, design modifications are made and new functional capabilities are added.

The procedure itself consists of the initialization step, the iteration step, and the Project Control List. The initialization step creates a base version of the system. The goal for this initial implementation is to create a product to which the user can react. It should offer a sampling of the key aspects of the problem and provide a solution that is simple enough to understand and implement easily. To guide the iteration process, a project control list is created that contains a record of all tasks that need to be performed. It includes such items as new features to be implemented and areas of redesign of the existing solution. The control list is constantly being revised as a result of the analysis phase.

The iteration involves the redesign and implementation of a task from the project control list, and the analysis of the current version of the system. The goal for the design and implementation of any iteration is to be simple, straightforward, and modular, supporting redesign at that stage or as a task added to the project control list. The level of design detail is not dictated by the interactive approach. In a light-weight iterative project the code may represent the major source of documentation of the system; however, in a mission-critical iterative project a formal Software Design Document may be used. The analysis of an iteration is based upon user feedback, and the program analysis facilities available. It involves analysis of the structure, modularity, usability, reliability, efficiency, & achievement of goals. The project control list is modified in light of the analysis results.

Iterative development.

[edit] Iterative/Incremental Development

Incremental development slices the system functionality into increments (portions). In each increment, a slice of functionality is delivered through cross-discipline work, from the requirements to the deployment. The unified process groups increments/iterations into phases: inception, elaboration, construction, and transition.

Each of the phases may be divided into 1 or more iterations, which are usually time-boxed rather than feature-boxed. Architects and analysts work one iteration ahead of developers and testers to keep their work-product backlog full.

The unmodified "waterfall model". Progress flows from the top to the bottom, like a waterfall.

[edit] Waterfall vs Iterative/Incremental Development

Waterfall development completes the project-wide work-products of each discipline in a single step before moving on to the next discipline in the next step. Business value is delivered all at once, and only at the very end of the project. Backtracking is possible in an iterative approach.

[edit] Implementation guidelines

Guidelines that drive the implementation and analysis include:

[edit] See also

[edit] References

[edit] Further reading

This page is extensively based on:

[edit] External links

Personal tools
Namespaces
Variants
Actions
Navigation
Interaction
Toolbox
Print/export
Languages