List of wind farms in Romania

From Wikipedia, the free encyclopedia
Jump to: navigation, search
A wind turbine standing on a field next to a small hut
The Tihuţa Pass is situated at an altitude of 1,200 m (3,900 ft).

As of 2008, there is an installed capacity of 76 megawatts (MW) of wind power in Romania, up from the seven MW installed capacity in 2007.[1][2] Until December 2010, Romania will add around 440 MW to its installed wind capacity from two wind farms: Fântânele-Cogealac and the EDP Peştera.[3] A total number of 170 wind turbines will be installed in 2010 enough to power over 500,000 homes.[4]

The Fântânele Wind Farm will become operational in stages. First, 139 General Electric 2.5xl turbines will be built; they stand 100 metres (330 ft) tall and have a blade diameter of 99 m (325 ft).[5] The wind turbines will have a 2.5 MW capacity and will be operational by December 2009.[6] The second stage will be operational by 2010 and will have an installed capacity of 252.5 MW.[7] When completed, it will be the largest onshore wind farm in Europe, surpassing the Maranchon Wind Farm, the largest wind farm as of August 2009.[5]

Romania has a wind-power potential of around 14,000 MW,[8] and a energy-generating capacity of 23 terawatt-hours.[8] The country's wind power capacity that can be assimilated by the national transport grid is between 3,000 MW and 9,000 MW,[9] while only in the last two years the total power of the requests for connecting to it was about 22.800 MW.[10] The Dobruja region, which consists of Constanţa and Tulcea counties, has the second-highest wind potential in Europe.[11]

The Romanian company Blue Investment will invest US$84 million in a 35 MW wind farm in Baia, Tulcea County that will have 14 Nordex N90 turbines with a capacity of 2.5 MW each.[12] Several companies are interested in investing in wind farms in Romania. The Italian company Enel Green Power, a subsidiary of Enel, plans to build several wind farms with a total capacity of 350 MW.[13] The Swiss conglomerate Cofra Group will build two wind farms, one that will have a capacity of 700 MW in Dobrogea and one that will have a capacity of 400 MW in Neamţ and Suceava counties; the total investment will amount to $1.65 billion.[14] In 2008, Iberdrola bought 50 wind farm projects, with a combined installed capacity 1,600 MW, from two companies for $450 million.[15] Romanian companies interested in building wind farms include Electrica and Green Energy, which have plans to build wind farms that will have a installed capacity of 310 MW with total investments of $420 million.[16][17] The Hungarian company Sinus Holding will build five wind farms in the Northern Moldavia region, having an installed capacity of 700 MW and totaling $800 million in capital investment, that will be built by December 2009.[18]

The first offshore wind-power project in Romania will be constructed by the United States–based Blackstone Group, which will invest $1.4 billion in a 500 MW wind farm located in the Constanţa County sector of the Black Sea on a 40 km2 (15 sq mi) area situated 6 km (3.7 mi) from the shoreline.[19][20] The project will consist of 100 wind turbines producing five MW each; they will be installed in water up to 50 m (160 ft) deep. The project is expected to be commissioned in 2011. - Correction: the named project will be developed into the North Sea, not Black Sea as Blackstone Group L.P. haven't mentioned anything in such respect.

Contents

[edit] Largest projects

These are the most important wind farm projects in Romania (larger than 10 MW):

Project name Sponsoring company Installed capacity (MW) County Status Notes
Activ Business Casimcea Activ Business 45 Tulcea Approved [21]
Blackstone[citation needed] Blackstone Group[citation needed] cca. 500 Constanţa Approved [22]
Eco Power Eco Power 80 Buzău Approved [23]
EDP Dobrogea Energias de Portugal 225 Tulcea Approved [24]
EDP Medgidia Energias de Portugal 90 Constanţa Under construction [25]
Enel Agichiol Enel Green Power 210 Tulcea Approved [26]
Babadag[citation needed] Martifer 48 Tulcea Approved [27]
Blue Investment Baia[citation needed] Blue Investment 35 Tulcea Under construction [12]
Blue Planet Baia[citation needed] Blue Planet Investments 35 Tulcea Under construction [28]
Fălciu-Berezeni E.ON 30 Vaslui Under construction [29]
Călimani West Wind 27 Suceava Approved [30]
Clisura Dunării[citation needed] Local authorities 10 Caraş-Severin Under construction [31]
Enel Corugea Enel Green Power 70 Tulcea Approved [26]
Eolgen Racoviţeni Eolgen 45 Buzău Proposed [32]
Roşieşti E.ON 46 Vaslui Approved [29]
EOL Săcele Electrica and Holrom 50 Constanţa Approved [33]
Eolica Baia Eolica Dobrogea 126 Tulcea Approved [34]
Eolica Beidaud Eolica Dobrogea 128 Tulcea Approved [34]
Eolica Casimcea Eolica Dobrogea 244 Tulcea Approved [34]
Eolica Ceamurlia South Eolica Dobrogea 28 Tulcea Approved [34]
Eolica Cogealac Eolica Dobrogea 448 Constanţa Approved [34]
Corbiţa Energycum 50 Vrancea Approved [35]
Eolica Corbu Eolica Dobrogea 68 Constanţa Approved [34]
Fântânele[citation needed] CEZ Group 600 Constanţa Under construction [3]
Eolica Grǎdina Eolica Dobrogea 62 Constanţa Approved [34]
Eolica Istria Eolica Dobrogea 74 Constanţa Approved [34]
Eolica Kogălniceanu Eolica Dobrogea 32 Constanţa Approved [34]
Eolica Mihai Viteazu Eolica Dobrogea 174 Constanţa Approved [34]
Eolica Pantelimon Eolica Dobrogea 66 Constanţa Approved [34]
Eolica Sǎcele Eolica Dobrogea 252 Constanţa Approved [34]
Eolica Sarichioi Eolica Dobrogea 102 Tulcea Approved [34]
Eolica Târguşor Eolica Dobrogea 36 Constanţa Approved [34]
Vetrişoaia E.ON 36 Vaslui Approved [29]
Eolus Vind Eolus Vind 30 Constanţa Approved [36]
Europp Galaţi Europp Energocons 33 Galaţi Approved [21]
Eximprod Galaţi Eximprod Buzău 70 Galaţi Approved [21]
Green Energy Green Energy 200 Tulcea Approved [37]
Liteni-Dolhasca Ulli Rowing 34 Suceava Under construction [38]
Market Expert Tulcea Market Expert 33 Tulcea Approved [21]
Mărişelu Local authorities 300 Cluj Approved [39]
New Energy Constanţa New Energy Group 30 Constanţa Under construction [40]
New Energy Tulcea New Energy Group 20 Tulcea Approved [40]
Orşova Toplet Energy 35 Mehedinţi Under construction [41][42]
Romwind Constanţa Romwind 30 Constanţa Approved [21]
Sibioara Sibioara Wind Farm 42 Vaslui Approved [21]
Sinus Holding Sinus Holding 700 Vaslui/Suceava/Neamţ Approved [18]
Tarcău Eolo Energy 24 Neamţ Approved [43]
Tomis Team Dobrogea Tomis Team 600 Tulcea/Constanţa Under construction [44]
Valea Nucarilor Green Energy, Blue Line, Electrogroup 60 Tulcea Under construction [45]
Văcăreni Energie Investments Group 240 Tulcea Proposed [46]
Verbund Casimcea Verbund 150 Tulcea Approved [47]
Scobinti Iasi ACK srl Romania 40 Scobinti-Iasi Approved [48]
Ruginoasa Iasi Moldova-Eolian srl Romania 100 Ruginoasa-Iasi Proposed [49]

[edit] Totals

Category status Total capacity
Under construction 1559 MW
Approved 5006 MW
Proposed 285 MW
All Stages 6800 MW

[edit] See also

[edit] References

  1. ^ "Avalansa portugheza: Martifer pregateste o achizitie de 7 mil. euro pe eolian si un parc propriu, EDP primeste deja turbinele" (in Romanian). Business Standard. 2009-04-01. http://www.standard.money.ro/articol_87410_12/avalansa_portugheza__martifer_pregateste_o_achizitie_de_7_mil__euro_pe_eolian_si_un_parc_propriu__edp_primeste_deja_turbinele.html. Retrieved 2009-04-02. 
  2. ^ Cristian Matache (2008-08-21). "Prima centrală energetică eoliană din România va fi operaţională din 2009" (in Romanian). Gandul. http://209.85.129.132/search?q=cache:SBH5doIwYiYJ:www.gandul.info/economia/prima-centrala-energetica-eoliana-din-romania-va-fi-operationala-din-2009.html%3F3936%3B2942672+prima+centrala+eoliana+2009&cd=4&hl=ro&ct=clnk&gl=ro. Retrieved 2009-02-04. 
  3. ^ a b Catalin Lupoaie (2008-08-27). "CEZ face energie eoliana cat un reactor de la Cernavoda" (in Romanian). Ziarul Financiar. http://www.zf.ro/eveniment/cez-face-energie-eoliana-cat-un-reactor-de-la-cernavoda-3180153/. Retrieved 2009-02-03. 
  4. ^ "2010, anul zero al proiectelor eoliene: Peste 500.000 de case vor putea fi luminate doar cu energia verde produsa de 170 de turbine" (in Romanian). Ziarul Financiar. 2009-10-26. http://www.zf.ro/companii/2010-anul-zero-al-proiectelor-eoliene-peste-500-000-de-case-vor-putea-fi-luminate-doar-cu-energia-verde-produsa-de-170-de-turbine-5043099/. Retrieved 2009-10-26. 
  5. ^ a b "Cel mai mare parc eolian terestru din Europa se construieste in Dobrogea" (in Romanian). www.euractiv.ro. 2008-08-28. http://www.euractiv.ro/uniunea-europeana/articles. Retrieved 2009-08-14. 
  6. ^ Roxana Petrescu (2009-08-14). "CEZ a investit 140 mil. euro in turbinele de la Fantanele" (in Romanian). Ziarul Financiar. http://www.zf.ro/companii/cez-a-investit-140-mil-euro-in-turbinele-de-la-fantanele-4752205/. Retrieved 2009-08-14. 
  7. ^ "CEZ takes out 260m-euro loan for Europe's largest wind farm in Dobrogea". Ziarul Financiar. 2009-07-06. http://www.zf.ro/zf-english/cez-takes-out-260m-euro-loan-for-europe-s-largest-wind-farm-in-dobrogea-4617746/. Retrieved 2009-08-01. 
  8. ^ a b "Investiţiile în energia eoliană rămân deocamdată la nivel de intenţie" (in Romanian). Mediafax. 2007-12-17. http://www.mediafax.ro/economic/investitiile-in-energia-eoliana-raman-deocamdata-la-nivel-de-intentie-2307782. Retrieved 2009-08-18. 
  9. ^ "Energia eoliana in Europa, de cinci ori puterea instalata a Romaniei" (in Romanian). www.ziare.com. 2007-09-07. http://www.ziare.com/Energia_eoliana_in_Europa_de_cinci_ori_puterea_instalata_a_Romaniei-126745.html. Retrieved 2009-07-28. 
  10. ^ http://www.adevarul.ro/financiar/Turbinele_eoliene_din_Romania_pot_functiona_la_30-_din_puterea_instalata_0_194380904.html
  11. ^ Mirona Hriţcu (2009-04-29). "Numai pentru milionarii în euro: afaceri cu energie eoliană" (in Romanian). Capital. http://www.capital.ro/articol/numai-pentru-milionarii-in-euro-afaceri-cu-energie-eoliana-119010.html. Retrieved 2009-07-28. 
  12. ^ a b "Blue Investments va aloca 60 milioane de euro pentru un parc eolian in judetul Tulcea" (in Romanian). Financiarul. 2008-11-21. http://www.financiarul.com/articol_17532/blue-investments-va-aloca-60-milioane-de-euro-pentru-un-parc-eolian-in-judetul-tulcea.html. Retrieved 2009-02-03. 
  13. ^ "Enel: 280 MW din vant, in Tulcea" (in Romanian). Business Standard. 2008-09-24. http://standard.money.ro/articol_60543/enel__280_mw_din_vant__in_tulcea.html. Retrieved 2009-08-14. 
  14. ^ "Cofra investeste 1,1 miliarde euro in centrale eoliene" (in Romanian). Business Standard. 2007-08-31. http://standard.money.ro/articol_11049/cofra_investeste_1_1_miliarde_euro_in_centrale_eoliene.html. Retrieved 2009-02-03. 
  15. ^ Roxana Petrescu (2008-02-13). "Dupa incercarea de preluare a Electrica Muntenia Sud, Iberdrola investeste 300 mil. euro in centrale eoliene" (in Romanian). Ziarul Financiar. http://www.zf.ro/companii/dupa-incercarea-de-preluare-a-electrica-muntenia-sud-iberdrola-investeste-300-mil-euro-in-centrale-eoliene-3104656/. Retrieved 2009-08-18. 
  16. ^ "Green Energy Grup, 300 milioane de euro pentru parcuri eoliene" (in Romanian). Business Standard. 2007-11-016. http://standard.money.ro/articol_17769/green_energy_grup__300_milioane_de_euro_pentru_parcuri_eoliene.html. Retrieved 2009-08-18. 
  17. ^ "Electrica vrea parteneri chinezi pentru investitii in eolian si hidro" (in Romanian). Business Standard. http://standard.money.ro/articol_87993/electrica_vrea_parteneri_chinezi_pentru_investitii_in_eolian_si_hidro.html. Retrieved 2009-08-18. 
  18. ^ a b "Sinus Holding va construi parcuri de turbine eoliene de 700 MW in Moldova" (in Romanian). Business Standard. 2008-07-03. http://www.standard.money.ro/articol_50987/sinus_holding_va_construi_parcuri_de_turbine_eoliene_de_700_mw_in_moldova.html. Retrieved 2009-02-03. 
  19. ^ "Peste 1 miliard de euro vor fi investiti de Blackstone intr-un parc eolian marin" (in Romanian). www.ziare.com. 2009-07-15. http://www.ziare.com/Peste_1_miliard_de_euro_vor_fi_investiti_de_Blackstone_intr_un_parc_eoli-358852.html. Retrieved 2009-07-30. 
  20. ^ "Blackstone va investi peste 1 miliard de euro într-un parc eolian marin" (in Romanian). realitatea.net. 2008-07-15. http://www.realitatea.net/blackstone-va-investi-peste-1-miliard-de-euro-intr-un-parc-eolian-marin_315181.html. Retrieved 2009-08-18. 
  21. ^ a b c d e f "Cine sunt si cum rezista in criza micii jucatori din piata eolienelor" (in Romanian). Business Standard. 2009-02-10. http://www.standard.money.ro/articol_80098/cine_sunt_si_cum_rezista_in_criza_micii_jucatori_din_piata_eolienelor.html. Retrieved 2009-03-05. 
  22. ^ Lavinia Rădulescu (2009-07-23). "Ne facem parc eolian în Marea Neagră" (in Romanian). Ziarul Ring. http://www.ziarulring.ro/stiri/ne_facem_parc_eolian_in_marea_neagra.html. Retrieved 2009-07-30. [dead link]
  23. ^ "Un parc eolian de 80 MW, investitie de 130 milioane euro, va fi pus in functiune langa Ramnicu Sarat" (in Romanian). Business Standard. 2009-03-17. http://www.standard.money.ro/articol_85157/un_parc_eolian_de_80_mw__investitie_de_130_milioane_euro__va_fi_pus_in_functiune_langa_ramnicu_sarat.html. Retrieved 2009-06-11. 
  24. ^ Simona Dobre (2008-11-04). "EDP face un parc eolian de 225 MW in circa doi ani" (in Romanian). Business Standard. http://standard.money.ro/articol_66924_12/edp_face_un_parc_eolian_de_225_mw_in_circa_doi_ani.html. Retrieved 2009-08-22. 
  25. ^ "EDP va avea un prim parc eolian in functiune in Medgidia dupa o investitie de peste 100 mil. euro" (in Romanian). Ziarul Financiar. 2009-10-21. http://www.zf.ro/companii/edp-va-avea-un-prim-parc-eolian-in-functiune-in-medgidia-dupa-o-investitie-de-peste-100-mil-euro-5017188/. Retrieved 2009-10-21. 
  26. ^ a b "Enel: 280 MW din vant, in Tulcea" (in Romanian). Business Standard. 2008-09-24. http://www.standard.money.ro/articol_60543_12/enel__280_mw_din_vant__in_tulcea.html. Retrieved 2009-02-03. 
  27. ^ "Martifer face parc eolian pe 260 de hectare la Babadag" (in Romanian). Ziarul Financiar. 2007-10-23. http://www.zf.ro/eveniment/martifer-face-parc-eolian-pe-260-de-hectare-la-babadag-3063943/. Retrieved 2009-08-18. 
  28. ^ Dan Odagiu (2008-11-20). "Românii fac un parc eolian gigantic" (in Romanian). Cotidianul. http://www.cotidianul.ro/romanii_fac_un_parc_eolian_gigantic-65104.html. Retrieved 2009-08-19. 
  29. ^ a b c "E.ON investeste in prima transa pana la 170 mil. € in trei parcuri eoliene" (in Romanian). Business Standard. 2008-09-23. http://www.standard.money.ro/articol_60388/e_on_investeste_in_prima_transa_pana_la_170_mil______in_trei_parcuri_eoliene.html. Retrieved 2009-02-03. 
  30. ^ Florin Dochita (2005-10-01). "Vintul de pe Calimani bate pentru buzunarele nemtilor" (in Romanian). Cotidianul. http://www.cotidianul.ro/vintul_de_pe_calimani_bate_pentru_buzunarele_nemtilor-3492.html. Retrieved 2009-08-18. 
  31. ^ "Prima centrala eoliana din Romania, in Caras-Severin" (in Romanian). Bloombiz. 2006-08-25. http://www.bloombiz.ro/business/prima-centrala-eoliana-din-romania-in-caras-severin. Retrieved 2009-02-03. 
  32. ^ Roxana Bucur (2008-09-25). "Un parc eolian de anvergură la Racoviteni" (in Romanian). Sansa Buzoiana. http://www.sansabuzoiana.ro/cotidian.html?aid=22750. Retrieved 2009-08-22. 
  33. ^ Roxana Petrescu (2008-06-18). "Electrica isi continua ofensiva pe regenerabile" (in Romanian). Ziarul Financiar. http://www.zf.ro/eveniment/electrica-isi-continua-ofensiva-pe-regenerabile-3088952/. Retrieved 2009-02-03. 
  34. ^ a b c d e f g h i j k l m n "Short Descriptions of Projects". Eolica Dobrogea (Schweiz) AG, Switzerland. Eolica Dobrogea. 2009-02-03. http://www.edch.ch/projects/descriptions.shtml. Retrieved 2009-02-03. 
  35. ^ Georgian Stoica (2008-08-15). "„Regele asfaltului“ toarnă si un parc eolian" (in Romanian). Saptamana Financiara. http://www.sfin.ro/articol_13716/regele_asfaltului_toarna_si_un_parc_eolian.html. Retrieved 2009-02-03. 
  36. ^ "Eolus Vind intra cu 15 mil. € pe eolian" (in Romanian). Business Standard. 2008-09-05. http://www.standard.money.ro/articol_58512_12/eolus_vind_intra_cu_15_mil______pe_eolian.html. Retrieved 2009-02-03. 
  37. ^ "Green Energy şi-a amânat proiectul parcului eolian de 200MW din Tulcea, din cauza legislaţiei" (in Romanian). www.realitatea.ne. 2009-07-17. http://www.realitatea.net/green-energy-si-a-amanat-proiectul-parcului-eolian-de-200mw-din-tulcea--din-cauza-legislatiei_564692.html. Retrieved 2009-07-30. 
  38. ^ "Cel mai mare parc eolian din tara, la Suceava" (in Romanian). Financiarul. 2009-03-07. http://www.financiarul.ro/2009/03/07/cel-mai-mare-parc-eolian-din-tara-la-suceava/. Retrieved 2009-08-18. 
  39. ^ Cosmina FERNOAGĂ. "Parc energetic eolian pe 100 ha la Mărişel" (in Romanian). Ziua de Cluj. http://www.ziuadecj.ro/action/article?ID=3758. Retrieved 2009-02-03. 
  40. ^ a b Adrian Stoica (2007-06-11). "Nemtii cred in potentialul eolian al Dobrogei" (in Romanian). Romania Libera. http://www.romanialibera.ro/a97815/nemtii-cred-in-potentialul-eolian-al-dobrogei.html. Retrieved 2009-02-03. 
  41. ^ "Romanian economic highlights" (pdf). Ministry of Foreign Affairs. 2009-05-04. http://ue.mae.ro/pdf/2009.05.04_highlights18.pdf. Retrieved 2009-02-03. 
  42. ^ Iulian Gogonea (2008-09-26). "Vântul aduce investiţii de milioane la Orşova" (in Romanian). Adevarul. http://www.adevarul.ro/articole/vantul-aduce-investitii-de-milioane-la-orsova.html. Retrieved 2009-08-18. 
  43. ^ "Mori de vânt şi hidrocentrale pe Valea Tarcăului" (in Romanian). Financiarul. 2009-02-03. http://www.financiarul.ro/2008/03/26/mori-de-vant-si-hidrocentrale-pe-valea-tarcaului/. Retrieved 2009-02-03. 
  44. ^ "Tomis Team va dezvolta cel mai mare parc eolian din România, de 600 MW" (in Romanian). money.ro. 2008-08-20. http://www.money.ro/temp/tomis-team-va-dezvolta-cel-mai-mare-parc-eolian-din-romania-de-600-mw.html. Retrieved 2009-08-19. 
  45. ^ "Dobrogea, raiul energiei eoliene" (in Romanian). Business Magazin. 2007-12-16. http://www.businessmagazin.ro/analize/energie/dobrogea-raiul-energiei-eoliene-2307910/?p=1. Retrieved 2009-08-24. 
  46. ^ "Gică Popescu intră în afacerile pe eolian" (in Romanian). Business Magazin. http://standard.money.ro/articol_106936/gica_popescu_intra_in_afacerile_pe_eolian.html. Retrieved 2009-09-22. 
  47. ^ "Verbund face parteneriat pentru 150 MW pe eolian in Dobrogea" (in Romanian). Business Standard. 2009-01-07. http://www.standard.money.ro/articol_75134/verbund_face_parteneriat_pentru_150_mw_pe_eolian_in_dobrogea.html. Retrieved 2009-02-03. 
  48. ^ "ACK srl" (in Romanian). http://www.ack.ro. Retrieved 2009-02-03. 
  49. ^ "Moldova Eolian srl" (in Romanian). http://www.moldova-eolian.ro. Retrieved 2010-02-03. 

[edit] External links

Media related to List of wind farms in Romania at Wikimedia Commons

Personal tools
Namespaces
Variants
Actions
Navigation
Interaction
Toolbox
Print/export