Melton railway line

From Wikipedia, the free encyclopedia
  (Redirected from Melton railway line, Melbourne)
Jump to: navigation, search
Melton railway line, Melbourne
Melton line map
Line details
Tracks Double track to Deer Park station, single track with loops beyond
Used by V/Line, freight
Service pattern Peak hour local trains to Melton and Bacchus Marsh, off peak Ballarat services
Connections Sydenham and Ballarat lines
Railways in Melbourne

The Melton line is a greater-metropolitan subsection of the Ballarat line in Victoria, Australia. It is incorporated into Melbourne's suburban railway network and is in Metlink ticketing Zone 2. The line branches from the Sydenham line at Sunshine, with all services departing from Southern Cross Station in the CBD.

The line consists of dual track until just west of Deer Park station where it becomes a single bi-directional track. There is another stretch of double track close to Rockbank station to facilitate the passing of trains. Despite the Regional Fast Rail project, there are no plans to duplicate this line.

There are a variety of trains on the line including VLocity & Sprinter type DMU's, as well as older locomotive-hauled carriages. All trains continue onto Bacchus Marsh, Ballarat or Ararat.

Ardeer railway station, with a train stopped in the platform

[edit] Line guide

Bold stations are termini, where some train services terminate; italic stations are staffed. Metcards are not valid past Melton station.

Branches from the Sydenham line at Sunshine.

Head station
1.2 km Southern Cross Station (SSS) Zone 1
Abbreviated in this map
Sydenham line
Station on track
13.5 km Sunshine (SUN) Zones 1 & 2
Transverse abbreviated in this map Junction to right
Sydenham line
Bridge over water
Kororoit Creek
Stop on track
17.0 km Ardeer (ARR) Zone 2
Unknown BSicon "AKRZu"
Western Ring Road
Stop on track
19.0 km Deer Park (DEK) Zone 2
Unknown BSicon "eHST"
 ? km Caroline Springs (Proposed) Zone 2
Stop on track
32.2 km Rockbank (RBK) Zone 2
Station on track
42.5 km Melton (MVT) Zone 2
Abbreviated in this map
Ararat and Ballarat lines

[edit] Future Upgrade

The Victorian State Government, as part of its Victorian Transport Plan (released in 2008), announced the progressive upgrade of the Melton Line to support future urban development in the corridor. This will begin with the construction of a new station at Caroline Springs (Ravenhall) beginning in 2010. Another additional station is planned at Toolern, between the existing Melton and Rockbank Stations, as part of the Toolern urban development, however no date for this has yet been determined. It is expected that the number of services will double following the electrification of the Sunbury Line (and re-allocation of the diesel rolling stock to Melton) in 2012. The line will also be progressively duplicated to support urban development and improved service frequency, before ultimate electrification.


[edit] External links, maps, and timetables

Personal tools
Namespaces

Variants
Actions
Navigation
Interaction
Toolbox
Print/export