Newport, Abergavenny and Hereford Railway

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Newport, Abergavenny and Hereford Railway
Including Taff Vale Extension
Continuation backward
To Shrewsbury
Junction from left Transverse track Continuation to left
To Worcester
To Hay-on-Wye
Unused continuation to right Unknown BSicon "exABZq+lr" Unknown BSicon "xABZqlxr" Track turning from right
Hereford Barton
Unknown BSicon "exBHF" Station on track
Hereford (Barrs Court)
Transverse water Unknown BSicon "exWBRÜCKE" Transverse water Bridge over water Transverse water
River Wye
Redhill Junction
Unknown BSicon "exSTRlf" Unknown BSicon "ABZ+lxr" Unknown BSicon "ABZrxl" Unused continuation to left
To Grange Court
Tram Inn
Stop on track
St Devereux
Stop on track
To Three Cocks Junction
Unused continuation to right Unknown BSicon "exSTRq" Unknown BSicon "eABZlg"
Pontrilas
Unknown BSicon "eHST"
Pandy
Unknown BSicon "eHST"
Llanvihangel
Unknown BSicon "eHST"
Abergavenny Junction
Unknown BSicon "eBHF"
To Merthyr
Unused continuation to right Unknown BSicon "exSTRq" Unknown BSicon "eABZgr+r"
Station on track
Abergavenny
Penpergwm
Unknown BSicon "eHST"
(Monmouth Road)
Nantyderry
Unknown BSicon "eHST"
Unknown BSicon "eABZrg" Unknown BSicon "exSTRq" Unused continuation to left
To Monmouth (Troy)
Little Mill Junction
Unknown BSicon "eHST"
Pontypool Road
Station on track
Unknown BSicon "xABZgl+xl" Transverse track Continuation to left
To Newport
Unknown BSicon "exABZgl+l" Unknown BSicon "exABZq+l" Unused continuation to left
GWR to Newport
Pontypool Clarence Street
Unknown BSicon "exBHF" Unknown BSicon "exSTR"
GWR to Blaenavon
Unused continuation to right Unknown BSicon "exSTRq" Unknown BSicon "exKRZo" Unknown BSicon "exSTRrf"
Crumlin Valley Colliery
Unknown BSicon "exHST"
Hafodyrynys
Unknown BSicon "exHST"
Unknown BSicon "exTUNNEL1"
Glyn Tunnel (280 yards)
Unknown BSicon "exSTRrg" Unknown BSicon "exABZrf"
Unknown BSicon "exSTR" Unknown BSicon "exELEVa"
Ebbw Valley Line
Continuation to right Unknown BSicon "eABZ3rf" Unknown BSicon "xhKRZ" Transverse track Continuation to left
Transverse water Transverse water Unknown BSicon "exhWSTR" Transverse water Transverse water
Ebbw River
Crumlin Viaduct
Unknown BSicon "exELEVe"
Crumlin High Level
Unknown BSicon "exBHF"
Treowen
Unknown BSicon "exHST"
Pennar Junction
Unknown BSicon "exABZrg" Unknown BSicon "exSTRq" Unused continuation to left
Pennar Branch to Risca
Pennar Branch to
Unused continuation to right Unknown BSicon "exSTRq" Unknown BSicon "exABZrf"
Markham Colliery
Unknown BSicon "exHST"
Pentwynmawr
Unknown BSicon "exHST"
Pontllanfraith Low Level
L&NWR Sirhowy
Unused continuation to right Unknown BSicon "exSTRq" Unknown BSicon "exKRZo" Unknown BSicon "exABZq+lr" Unused continuation to left
Valley Branch
Unknown BSicon "exABZgl+l" Unknown BSicon "exSTRrf"
Unknown BSicon "exTUNNEL1"
Bryn Tunnel (398 yards)
Maesycymmer Junction
Unknown BSicon "exSTRrg" Unknown BSicon "exABZrf"
Unknown BSicon "exSTR" Unknown BSicon "exELEVa"
B&MJR to Bargoed
Unused continuation to right Unknown BSicon "exABZqr" Unknown BSicon "exhKRZ" Unknown BSicon "exSTRq" Unused continuation to left
B&MJR to Maesycymmer
Transverse water Transverse water Unknown BSicon "exhWSTR" Transverse water Transverse water
Rhymney River
Unknown BSicon "exELEVe"
Hengoed Viaduct
Hengoed High Level
Unknown BSicon "exHST"
Unknown BSicon "exÜWc2" Unknown BSicon "exÜWor"
Unknown BSicon "exÜWo+l" Unknown BSicon "exÜWc4"
RVR to Bargoed
Continuation to right Unknown BSicon "xKRZo" Unknown BSicon "eABZ3rg" Unknown BSicon "ABZ3rg" Continuation to left
RVR to Ystrad Mynach
Penallta Colliery Branch
Unused continuation to right Unknown BSicon "exKRZo" Unknown BSicon "exSTRrf" Straight track
Unknown BSicon "xABZrg" Transverse track Track turning right
Penallta Junction
Nelson Branch to Pontypridd
Unknown BSicon "eABZgl+l" Unused continuation to left
Unknown BSicon "eHST"
Nelson and Llancaiach
RVR to Taff Bargoed
Continuation to right Unknown BSicon "xABZrf"
Treharris
Unknown BSicon "exHST" Track turning from left Transverse track Continuation to left
TVR extension to Pontypridd
Unknown BSicon "exABZrg" Unknown BSicon "eABZrf"
Quakers Yard Branch Junctionn
Quakers Yard High Level
Unknown BSicon "exBHF" Station on track
Quakers Yard Low Level
Unknown BSicon "exABZlf" Unknown BSicon "eKRZu" Unknown BSicon "exSTRlg"
Quakers Yard Viaduct
Quakers Yard No.2 Viaduct
Track turning from left Unknown BSicon "xKRZo" Track turning right Unknown BSicon "exSTR"
TVR to Merthyr Tydfil
Continuation forward Unknown BSicon "exSTR" Unknown BSicon "exTUNNEL1"
Cefn Glas Tunnel (703 yards)
RVR Taff Branch to Merthyr
Unused continuation forward Unused continuation forward
Vale of Neath Railway

The Newport, Abergavenny and Hereford Railway was a railway line connecting the Welsh port city of Newport via Abergavenny, to the major English market town of Hereford.

Sponsored by the LNWR, it opened on 6 December 1853. But in 1860 it merged with other railways to form the West Midland railway which was in turn taken over by the Great Western Railway in 1863.

On nationalisation post-World War II became part of the Western Region of British Railways. Surviving the Beeching Axe, it now forms the southern section of Network Rails Welsh Marches Line.

[edit] History

Incorporated on 3 August 1846, in 1847, the Act was passed for the Taff Vale Extension, from Coedygric North Junction, Pontypool westwards to the Taff Vale Railway at Quakers Yard. The railway company was formed by the amalgamation of the Hereford Railway, the Llanfihangel Railway and the Grosmont Railway.

Surveyed and designed by Chief Engineer Charles Liddell, he noted that at its northern end, the terminus at Hereford Barton was not big enough to take the five railways converging on the major market town. So it was agreed by the joint GWR/LNWR Shrewsbury and Hereford Railway and the broad gauge GWR sponsored Hereford, Ross and Gloucester Railway, the construction of Hereford Barrs Court. A joint opening of both stations took place on 6 December 1853.

Liddell faced the problem of bridging two key natural geographic barriers to connect with the Taff Vale Railway at Quakers Yard, the Ebbw Valley and the Rhymney Valley. After agreeing a tendering process with the board, the winner was agreed to be Thomas W. Kennard. While Liddell was the key architect of both the Crumlin Viaduct (built from wrought iron due to its projected height), and the Hengoed Viaduct (built from stone, on a curve), Kennard acted as designer and engineer for both projects, and supplier for the Crumlin, where his father Robert Kennard's company Falkirk Iron Co supplied the innovative Warren trusses.

On 2 January 1854, the line opened from Hereford to Coedygric, Pontypool on the Monmouthshire Railway and Canal Company line. The station at Abergavenny was opened.

In 1860, the Newport, Abergavenny and Hereford Railway merged with the Oxford, Worcester and Wolverhampton Railway and Worcester and Hereford Railway to form the West Midland Railway.

On 1 October 1862, Abergavenny Junction was opened to the Merthyr, Tredegar and Abergavenny Railway. Abergavenny Junction closed in 1958.

On 9 June 1958, the majority of stations on the line were closed to goods traffic.

[edit] Chronology

  • 1846 - Tramroads the Llanvihangel Railway, Grosmont Railway and Hereford Railway purchased.
  • 1847 - Act for Taff Vale Extension passed from Coedygric North Junction to the Taff Vale Railway at Quakers Yard.
  • 1852 - Construction work commences on Crumlin Viaduct.
  • 1853 - Construction on Hengoed Viaduct (Maesycwmmer Viaduct) begins.
  • 1854 - Line to Abergavenny opened.
  • 1854 - Section opened from Hereford (Barton) to Coedygric on the Monmouthshire Railway and Canal Company. Line is operated by the London and North Western Railway.
  • 1854 - Railway becomes fully independent.
  • 1860 - Newport Abergavenny and Hereford Railway, Oxford Worcester and Wolverhampton Railway and Worcester and Hereford Railway merged to form the West Midland Railway.
  • 1862 - Abergavenny Junction station opened.
  • 1863 - West Midland Railway builds platforms north of the south facing junction with the Merthyr, Tredegar and Abergavenny Railway.
  • 1864 - Traffic serves the newer Abergavenny railway station.
  • 1870 - Abergavenny Junction station re-built further north from original site.
  • 1871 - Abergavenny Junction station re-built at London and North Western Railway expense.
  • 1884 - Private coal and stores siding laid to Abergavenny from south junction at triangle. London and North Western Railway acquire running powers.
  • 1928 - Double-track across Crumlin Viaduct downscaled to a single track.
  • 1950 - Abergavenny renamed "Abergavenny Monmouth Road".
  • 1958 - Abergavenny Junction station closes, and all stations between Pontypool Road and Hereford (excluding Abergavenny Monmouth Road) all close to goods traffic.
  • 1964 - Passenger services between Pontypool Road and Neath withdrawn and the line over Crumlin viaduct closes to all traffic.
  • 1965 - Pontypool Road engine shed closes.
  • 1965 - Crumlin Viaduct demolished.
  • 1967 - Pontypool Road engine shed is demolished. Sidings in Pontypool and at Coedygric are largely removed during Beeching Axe.
  • 1968 - "Abergavenny Monmouth Road" station is renamed Abergavenny again.
  • 1972 - With the closures of Crane Street and Pontypool Clarence Street, Pontypool Road station is renamed "Pontypool".
  • 2000 - The disused Hengoed Viaduct is opened for public access.
  • 2004 - The Heritage Lottery Fund provides refurbishment grant for Hengoed Viaduct and remains of Hengoed High Level railway station which becomes part of the Celtic cycle trail.