Outer Harbor railway line
Outer Harbor Line
|
|
| Railway Line Overview | |
| Route | |
| Starting Point | Adelaide |
| Major Stations | Woodville Port Adelaide Glanville |
| Terminus | Outer Harbor |
| Line Length | 21.9 km |
| Track | Double track to Midlunga Single track to Outer Harbor |
| Frequency | |
|---|---|
| Peak Frequency | Every 20-30 Mins |
| Weekday Frequency | Every 30 Mins |
| Weekend Frequency | Every 60 Mins |
| Night Frequency | Every 60 Mins |
|
|
|
| 2000/2100 class | Yes |
| 3000/3100 class | Yes |
| History | |
| Opened | 1856 (To Port Adelaide) 1908 (To Outer Harbor) |
| Re-sleepered (Concrete) | 2002 |
| Electrified | 2013 |
| Adelaide Railway Lines | |
| Belair Line | |
| Gawler Central Line | |
| Glenelg Tram | |
| Grange Line | |
| Noarlunga Centre Line | |
| Outer Harbor Line | |
| Showground Central Line | |
| Tonsley Line | |
The Outer Harbor Railway Line in Adelaide, South Australia runs from Adelaide Railway Station. It includes many suburban railway stations, and shares part of its run with the Grange line.
Contents |
[edit] History
The section between Adelaide and Port Adelaide Junction is the oldest railway in Adelaide and was the first government-owned railway in the British Empire[citation needed], opening in 1856.
[edit] Electrification
When delivering the 2008 South Australian State Budget, Treasurer Kevin Foley announced a $83 million plan to electrify the Outer Harbor line as part of the Government's 10-year $2 billion plan to revitalise Adelaide's public transport network.[1]
An additional plan would see the current Outer Harbor line become the centrepiece of Adelaide's new rail system. With plans to extend the Glenelg tramline to the Adelaide Entertainment Centre and converting the line to standard gauge, it would become a heavy/light rail line, with trams sharing the rails with heavy electric trains. Trams would serve AAMI Stadium at West Lakes, Port Adelaide and Semaphore, with heavy rail serving most of the current route. The time frame for electrification is for a 2016/18 completion, while further upgrades are due to be completed within the 10-year target of the Budget. [2]
This was in addition to the electrification of the Noarlunga and Gawler rail corridors.
[edit] Route
The line is double track from Adelaide station to Midlunga station, then single for the final 3 km to Outer Harbor. The northern section of the line runs along the middle of the narrow Lefevre Peninsula with stations at regular intervals. The line is broad gauge (1600 mm), the same as the rest of the Adelaide network. The line between Port Adelaide Junction and Glanville was dual gauge until early December 2009. The standard gauge was removed during the temporary closure of the Outer Harbor line as the Port Adelaide Viaduct upgrade.
[edit] Timetables
Unlike the Gawler Central and Noarlunga Centre lines, the timetable on the Outer Harbor line are relatively simple. Weekday off-peak services run every 30 minutes, with most trains running express between Adelaide and Woodville. Weekday peak services run every 20-30 min, with the majority also running express between Adelaide and Woodville. Two services in the morning and one in the evening run express between Adelaide and Ethelton. There are also three services that terminate at Glanville during peak times to supplement these expresses. Weekend and evening/night services run every hour, calling at all stations, and because there is no railcar depot on the line the last two railcars at night run express back to Adelaide from Outer Harbor. Some Saturday services are every 30 minutes during some sort of weekend peak hour.
Services are similar on the Grange line, which use the same track between Adelaide and Woodville, where the Grange line diverges south west. Grange trains stop at all stations.
Services are operated by 3100/3000 class railcars and 2100/2000 class railcars ("Jumbos"). Jumbos run on peak hour services, usually as three-car sets. Some off-peak services are two-three car Jumbos.
[edit] Line guide
| Outer Harbor Line suburban service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-
Port Adelaide Rebuilt 2010
[edit] References
- Rails Through Swamp and Sand – A History of the Port Adelaide Railway. M. Thompson pub. Port Dock Station Railway Museum (1988) ISBN 0-9595073-6-1
- ^ "2008 State Budget". South Australian Department of Treasury and Finance. 2008-06-05. http://www.treasury.sa.gov.au/dtf/budget/publications_and_downloads/current_budget.jsp?. Retrieved 2008-06-06.
- ^ Martin, Sarah (2011-06-10). "SA State Budget 11 - $200m in rail revitalisation work delayed". The Advertiser. http://www.adelaidenow.com.au/news/in-depth/rail-project-stopped-in-its-tracks/story-fn8x9piw-1226072473185. Retrieved 2011-06-10.
|
|||||