Seremban Line

From Wikipedia, the free encyclopedia
  (Redirected from Rawang-Seremban Line)
Jump to: navigation, search
1 Seremban Line
KTMB Class 92 SCS 18 KL Sentral Junction.jpg
A KTM Class 92 SCS 18 commuter train
Overview
Type Commuter Rail
Status Operational
Locale Negeri Sembilan, Perak, Selangor and Kuala Lumpur
Termini Tanjung Malim
Rembau
Stations 30
Services

Main Line: Rawang to Rembau

Shuttle Service: Rawang to Tanjung Malim
Website www.ktmkomuter.com.my
Operation
Opening August 14, 1995 (1995-08-14)
Owner Keretapi Tanah Melayu
Operator(s) Keretapi Tanah Melayu
Depot(s) Sentul
Technical
Line length 105.15 km (65.34 mi)
Track gauge 1,000 mm (3 ft 3 38 in) metre gauge
Electrification Overhead
Operating speed Up to 120 km/h (75 mph)
Route map
KA15 Tanjung Malim ETS Line
KA14 Kuala Kubu Bharu
KA13 Rasa
KA12 Batang Kali
KA11 Serendah
KA10 Rawang
KA09 Kuang
KA08 Sungai Buloh 9
KA07 Kepong Sentral
KA06 Kepong
KA05 Segambut 2
PWTC 3 4
KA04 Putra
Sultan Ismail
Bandaraya
KA03 Bank Negara
5
Pasar Seni
KA02 Kuala Lumpur ETS Line KTM Intercity
8
KA01 KL Sentral KLIA ETS Line KTM Intercity klia2
6 7
KB01 Mid Valley 2
KB02 Seputeh
KB03 Salak Selatan 4
KB04 Bdr Tasik Selatan KLIA Terminal Bersepadu Selatan
KB05 Serdang 7
KB06 Kajang 9
KB07 UKM
KB08 Bangi
KB09 Batang Benar
KB10 Nilai klia2
KB11 Labu
KB12 Tiroi
KB13 Seremban
KB14 Senawang
KB15 Sungai Gadut
KB16 Rembau

The Seremban Line is one of the two KTM Komuter services provided by Keretapi Tanah Melayu. KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.

Route[edit]

Name Type Notes
Tanjung Malim Island & Side Terminus of the Rawang-Tanjung Malim shuttle.
Kuala Kubu Bharu Side
Rasa Side
Batang Kali Side
Serendah Side
Rawang Island & Side Terminus of the commuter and shuttle route.
Kuang Side
Sungai Buloh Side
Kepong Sentral Side
Kepong Side
Segambut Side
Putra Side Walking distance to RapidKL LRT
Bank Negara Side Walking distance to RapidKL LRT
Kuala Lumpur Island & Side Connection to KTM Batu Caves-Port Klang Route, walking distance to RapidKL LRT.
KL Sentral Island connection to KTM Batu Caves-Port Klang Route, RapidKL LRT, KLIA Ekspres and KLIA Transit, walking distance to KL Monorail and RapidKL and Metrobus hubs.
Mid Valley Side
Seputeh Side
Salak Selatan Side Walking distance to RapidKL LRT
Bandar Tasik Selatan Side Connection to RapidKL LRT and KLIA Transit.
Serdang Side
Kajang Island & Side
UKM Side
Bangi Island & Side
Batang Benar Side
Nilai Side
Labu Side
Tiroi Side
Seremban Island & Side
Senawang Side
Sungai Gadut Island The only elevated station in KTM Komuter Line.
Rembau Island Terminus of the Rawang-Seremban line.

Rawang-Tanjung Malim Shuttle Service[edit]

The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007 under what was formerly known as the Rawang-Rasa shuttle service. The stations are Serendah, Batang Kali, and Rasa. This 22 km stretch is the first portion of the Rawang-Ipoh double tracking and electrification project to become operational. The service was extended to Kuala Kubu Bharu on January 5, 2008. It was further extended to Tanjung Malim on June 1, 2009, and the service is thus renamed as the Rawang-Tanjung Malim shuttle service.

Passengers have to disembark at Rawang and take the Rawang-Tanjung Malim shuttle service for these stations. Service runs at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 25 minutes.

Route Maps[edit]

External links[edit]

See also[edit]

Gallery[edit]