Seremban Line

From Wikipedia, the free encyclopedia
  (Redirected from Rawang-Seremban Line)
Jump to: navigation, search
Line 1
Seremban Line
Klang Valley Rail Transit Map.pdf
Seremban Line colored blue in the rail map.
Overview
Type Commuter Rail
Status Operational
Locale Negeri Sembilan, Perak,
Selangor and Kuala Lumpur
Termini Tanjung Malim
Rembau
Stations 30
Services

Main Line: Rawang to Sungai Gadut

Shuttle Service: Rawang to Tanjung
Malim

Shuttle Service: Sungai Gadut to
Rembau
Website www.ktmkomuter.com.my
Operation
Opening August 14, 1995 (1995-08-14)
Owner Keretapi Tanah Melayu
Operator(s) Keretapi Tanah Melayu
Depot(s) Sentul
Technical
Line length 105.15 km (65.34 mi)
Track gauge 1,000 mm (3 ft 3 38 in) metre gauge
Electrification Overhead
Operating speed Up to 120 km/h (75 mph)
Route map
KA15 Tanjung Malim KTM ETS
KA14 Kuala Kubu Bharu KTM ETS
KA13 Rasa
KA12 Batang Kali
KA11 Serendah
KA10 Rawang KTM ETS
KA09 Kuang
KA08 Sungai Buloh KTM ETS 9
KA07 Kepong Sentral KTM ETS
KA06 Kepong
KA05 Segambut 2
PWTC 34
KA04 Putra
Sultan Ismail
Bandaraya
KA03 Bank Negara
5
Pasar Seni
KA02 Kuala Lumpur Keretapi Tanah Melayu KTM ETS
8
KA01 KL Sentral Keretapi Tanah Melayu KTM ETS klia2
67
KB01 Mid Valley 2
KB02 Seputeh
KB03 Salak Selatan 4
KB04 Bdr Tasik Selatan KLIA Terminal Bersepadu Selatan
KB05 Serdang 7
KB06 Kajang 9
KB07 UKM
KB08 Bangi
KB09 Batang Benar
KB10 Nilai klia2
KB11 Labu
KB12 Tiroi
KB13 Seremban
KB14 Senawang
KB15 Sungai Gadut
KB16 Rembau

The Seremban Line is one of the two KTM Komuter services provided by Keretapi Tanah Melayu. KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.

The line is one of the components of the Klang Valley Public Transport System.

Stations[edit]

Station Name Platform type Interchange station/Notes
Tanjung Malim Island & Side Terminus of the Tanjung Malim shuttle service.
Kuala Kubu Bharu Side
Rasa Side
Batang Kali Side
Serendah Side
Rawang Island & Side Terminus of the Seremban line. Stairless cross-platform interchange for Tanjung Malim shuttle service.
Kuang Side
Sungai Buloh Side Exit paid area station to 9 Sungai Buloh-Kajang Line
Kepong Sentral Side
Kepong Side
Segambut Side
Putra Side Cross-platform interchange to 2 Port Klang Line, walking distance of 250 meter exit paid area station to PWTC for 3 Ampang Line & 4 Sri Petaling Line.
Bank Negara Side Cross-platform interchange to 2 Port Klang Line, walking distance of 100 meter exit paid area station to Bandaraya for 3 Ampang Line & 4 Sri Petaling Line.
Kuala Lumpur Island & Side Stairless cross-platform interchange to 2 Port Klang Line and 200 meter walking distance exit paid area station to Pasar Seni for 5 Kelana Jaya Line & 9 Sungai Buloh-Kajang Line.
KL Sentral Island Cross-platform interchange to 2 Port Klang Line, exit paid area station to 5 Kelana Jaya Line, 6 KLIA Ekspres, 7 KLIA Transit, 200 meter walking distance to 8 Monorail Line & and 600 meter walking distance exit paid area station to Muzium Negara for 9 Sungai Buloh-Kajang Line.
Mid Valley Side
Seputeh Side
Salak Selatan Side The nearest rail transit station is 550 meter exit paid area station to Salak Selatan for 4 Sri Petaling Line despite their same name.
Bandar Tasik Selatan Side Exit paid area station to 4 Sri Petaling Line, 7 KLIA Transit & walking distance to Terminal Bersepadu Selatan Terminal Bersepadu Selatan.
Serdang Side
Kajang Island & Side Exit paid area station to 9 Sungai Buloh-Kajang Line
UKM Side
Bangi Island & Side
Batang Benar Side
Nilai Side Exit to KLIA & KLIA2 by shuttle bas.
Labu Side
Tiroi Side
Seremban Island & Side
Senawang Side
Sungai Gadut Island Terminus of the Seremban line. The station currently the only elevated station in KTM Komuter service beside Subang Skypark at 2 Port Klang Line which is still under construction. This station provide stairless cross-platform interchange for Rembau shuttle service.
Rembau Island Terminus of the Rembau shuttle service.

Rawang-Tanjung Malim Shuttle Service[edit]

The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007 under what was formerly known as the Rawang-Rasa shuttle service. The stations are Serendah, Batang Kali, and Rasa. This 22 km stretch is the first portion of the Rawang-Ipoh double tracking and electrification project to become operational. The service was extended to Kuala Kubu Bharu on January 5, 2008. It was further extended to Tanjung Malim on June 1, 2009, and the service is thus renamed as the Rawang-Tanjung Malim shuttle service.

Passengers have to disembark at Rawang and take the Rawang-Tanjung Malim shuttle service for these stations. Service runs at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 25 minutes.

Route Maps[edit]

External links[edit]

See also[edit]

Gallery[edit]