Sengkang LRT Line

From Wikipedia, the free encyclopedia
  (Redirected from Sengkang LRT)
Jump to: navigation, search
Sengkang LRT Line
Overview
Type Light rail
System Light Rail Transit (Singapore)
Status Operational
Termini Sengkang
Stations 14
Services 2
Operation
Opened 18 January 2003 (East Loop)
29 January 2005 (West Loop)
Owner Land Transport Authority
Operator(s) SBS Transit (ComfortDelGro Corporation)
Rolling stock Crystal Mover
Technical
Line length 10.7 km (6.6 mi)
Electrification Third rail
Route map
  West loop  
SW5Fernvale
Waterway turning from left Unknown BSicon "uBHFq" Urban track turning from right
SW6Layar
Urban station on track Urban station on track
ThanggamSW4
SW7Tongkang
Urban station on track Unknown BSicon "ueBHF"
KupangSW3 (closed)
Sengkang Depot
Unknown BSicon "uKDSTl" Unknown BSicon "uABZrd" Urban station on track
FarmwaySW2
SW8Renjong
Urban station on track Unknown BSicon "ueBHF"
Cheng LimSW1 (closed)
Unknown BSicon "uAKRZo" Unknown BSicon "uAKRZo"
Sengkang East Rd
NE Line to HarbourFront
Transverse abbreviated in this map Unknown BSicon "umKRZt"
Unknown BSicon "tSTRq" + Unknown BSicon "CPICuu" + Interchange
Unknown BSicon "umKRZt" Transverse abbreviated in this map
NE Line to Punggol
STC/NE16Sengkang
Unknown BSicon "uABZfg"
Unknown BSicon "CPICdd" + Unknown BSicon "uINTq"
Unknown BSicon "uABZgf" + Waterway turning to left
Unknown BSicon "uHLUECKE"
Punggol LRT Line
SE5Ranggung
Urban station on track Urban station on track
CompassvaleSE1
Unknown BSicon "uAKRZo" Unknown BSicon "uAKRZo"
Punggol Rd
SE4Kangkar
Urban station on track Urban station on track
RumbiaSE2
Waterway turning to left Unknown BSicon "uBHFq" Waterway turning to right
BakauSE3
  East loop  
A Mitsubishi Heavy Industries Crystal Mover on the East Loop

The Sengkang LRT Line is a 10.7 km light rail line which partly opened on 18 January 2003. It is the second LRT system in Singapore and is fully automated and currently operated by SBS Transit. The line uses the Crystal Mover rolling stock supplied by Mitsubishi Heavy Industries. This line connects the residential districts and suburbs of Sengkang to the Sengkang Town Centre, which is also served by the North East Line and the Sengkang Bus Interchange.

This LRT service was operational even before the North East Line operated.

Contents

[edit] History

  • January 18, 2003: East Loop opened
  • January 29, 2005: West Loop (except SW1-3) opened
  • November 15, 2007: SW2 Farmway opened

[edit] Stations

Station Number Station Name Interchange/Notes
 STC  NE16  Sengkang North East Line
East Loop
 SE1  Compassvale  
 SE2  Rumbia  
 SE3  Bakau  
 SE4  Kangkar  
 SE5  Ranggung  
West Loop
 SW1  Cheng Lim (Not in operation)  
 SW2  Farmway  
 SW3  Kupang (Not in operation)  
 SW4  Thanggam  
 SW5  Fernvale  
 SW6  Layar  
 SW7  Tongkang  
 SW8  Renjong  

[edit] Service

Trains on the Sengkang LRT ply either one of the two loops, the East loop or the West loop. Trains serving the East loop are bi-directional, meaning that passengers can travel either way to get to their destination station on the East Loop. However for the West Loop, trains only ply in one direction. From start of service till 3 p.m., trains will ply the West Loop via Cheng Lim first, to cater to residents who need to transfer to Sengkang MRT Station to get to work. After 3 p.m., trains will go in reverse direction, via Renjong first, so that residents can get home faster. This will be changed after 4 January 2010 where during weekdays on peak hours, West loop will ply on both directions.[1]

  1. ^ http://www.sbstransit.com.sg/download/SK_West_Loop_Peak_Hours.pdf

[edit] External links

Panoramic view showing the Sengkang LRT Line (SKLRT). Renjong LRT Station lies to the left, and the Sengkang Depot for North East MRT Line (NEL) and SKLRT to the right. In the distant background lie Buangkok and Hougang New Town.


Personal tools
Namespaces
Variants
Actions
Navigation
Interaction
Toolbox
Print/export
Languages