Serpukhovsko-Timiryazevskaya Line

From Wikipedia, the free encyclopedia
Jump to: navigation, search
#9 Serpukhovsko-Timiryazevskaya Line Serpukhovsko-Timiryazevskaya Line
Overview
Type Rapid transit
System Moscow Metro
Locale Moscow
Termini Altufyevo (north)
Bulvar Dmitriya Donskogo (south)
Stations 25
Daily ridership 1,108,800[1]
Operation
Opened November 8, 1983
Operator(s) Moskovsky Metropoliten
Character Underground
Rolling stock 81-717.5M/714.5M
Technical
Line length 41.2 kilometres (25.6 mi)
Track gauge 1,520 mm (4 ft 11 56 in)
Electrification Third rail


Serpukhovsko-Timiryazevskaya Line
Urban head station in tunnel
Altufyevo
Urban tunnel station on track
Bibirevo ↑ north-bound
Urban tunnel station on track
Otradnoye ↓ south-bound
Urban tunnel junction to left Urban track end left
Vladykino Yard
Urban tunnel station on track
Vladykino
Urban tunnel station on track Unknown BSicon "BAHN"
Petrovsko-Razumovskaya
Urban tunnel station on track Unknown BSicon "BAHN"
Timiryazevskaya
Urban tunnel station on track Unknown BSicon "BAHN"
Dmitrovskaya
Urban tunnel station on track Unknown BSicon "BAHN"
Savyolovskaya
Unknown BSicon "utINT"
Mendeleyevskaya Transfer to #5 Koltsevaya Line at Novoslobodskaya.
Unknown BSicon "utINT"
Tsvetnoy Bulvar Transfer to #10 Lyublinsko-Dmitrovskaya Line at Trubnaya.
Unknown BSicon "utINT"
Chekhovskaya Transfer to #2 Zamoskvoretskaya Line at Tverskaya. Transfer to #7 Tagansko-Krasnopresnenskaya Line at Pushkinskaya.
Unknown BSicon "utINT"
Borovitskaya Transfer to #1 Sokolnicheskaya Line at Biblioteka Imeni Lenina. Transfer to #3 Arbatsko-Pokrovskaya Line at Arbatskaya.
Urban tunnel station on track
Polyanka
Unknown BSicon "utINT"
Serpukhovskaya Transfer to #5 Koltsevaya Line at Dobryninskaya.
Urban tunnel station on track
Tulskaya
Urban tunnel station on track Unknown BSicon "BAHN"
Nagatinskaya
Urban tunnel station on track
Nagornaya
Urban tunnel station on track
Nakhimovsky Prospekt
Unknown BSicon "utINT"
Sevastopolskaya Transfer to #11 Kakhovskaya Line at Kakhovskaya.
Urban tunnel station on track
Chertanovskaya
Urban tunnel junction to left Urban track end left
Varshavskoye Yard
Urban tunnel station on track
Yuzhnaya
Urban tunnel station on track
Prazhskaya
Urban tunnel station on track
Ulitsa Akademika Yangelya
Urban tunnel station on track
Annino
Unknown BSicon "utKINTe"
Bulvar Dmitriya Donskogo Transfer to #L1 Butovskaya Line at Ulitsa Starokachalovskaya.

Serpukhovsko–Timiryazevskaya Line (Russian: Серпухо́вско-Тимиря́зевская ли́ния, Line 9), sometimes colloquially referred to as Grey Line (Russian: серая линия), is a line of the Moscow Metro. Originally opened in 1983, it was extended throughout the 1980s and early 90s and again in the early 2000s. With its current length of 41.5 km, it is the second longest line in the Moscow Metro (all underground making it the world's 2nd longest rapid transit tunnel). It has 25 stations.

Contents

[edit] History

The project of a north-south diameter was finalised in the 1971 Moscow General Development Plan, and construction began in the mid 1970s. The first stage, the southern Serpukhovsky radius, was opened in 1983 which brought the Metro to the southern districts of Danilovsky, Nagorny, Ziuzino and Chertanovo. Starting at Serpukhovskaya square the radius follows the Varshavskoye avenue, twice contacts the Moscow-Pavelets Line, afterwards it deviates slightly westwards passing Azovskaya street, where it meets the then terminus of the Gorkovsko-Zamoskvoretskaya Line, Kakhovskaya station. Afterwards the line crosses back across northern Chertanovo's main intersection (Balaklavsky avenue and Sevastopolsky Bulvar).

Some of the new technical methods employed in the construction of this section, included passing from deep alignment to shallow in water-carrying soils. A new technique of contour freezing was employed, which then used explosives to bore through the unstable region. The stretch between Serpukhovskaya and Tulskaya was further made difficult due gasoline leaks from an above petrol station over the years sufficiently absorbed by the soil such that the high concentration of fumes caused a fire in the unfinished tunnel, this introduced a new practice of adding additional boreholes in areas of difficult ventilation.

In November 1985 the line had its first extension southwards to Prazhskaya. This station was designed by Czechoslovak engineers and specialists from the Prague Metro. Simultaneously the station Moskevská was built in Prague by Soviet engineers.

Beginning in the mid-1980s work began on extending the system northwards through the city centre. This very deep section passed the areas of Yakimanka and Arbat where the first in Moscow 4 station transfer was set up in 1986. In 1987 this was followed by the station Chekhovskaya located near the Pushkin Square. In 1988 the final extension through the centre first deviated eastwards to include Tsvetnoy Boulevard and then crossed the ring at Novoslobodskaya before continuing northwards to Savyolovsky Rail Terminal.

Afterwards construction of the Timiryazevsky radius followed and in 1991 the major 5 station extension brought the line to the northern districts of Timiryazvesky, Butyrsky, Marfino and Otradnoye itself. In addition the line had interchanges with 3 major railway lines. The unique station Timiryazveskaya is the only one in Moscow built to the Deep single-vault (Leningrad) design. The Timiryazevsky radius had two more extensions, Biberevo in 1992 and Altufyevo in 1994 making it the northernmost in the system.

On the opposite Serpukhovsky end, in the early 2000s three extensions were built: Ulitsa Akademika Yangelya (2000), Annino (2001) and Bulvar Dmitriya Donskogo (2002). The latter carried the line into Northern Butovo and was the first to cross MKAD beltway. Today the line is the only one in Moscow for which no extension plans or proposals exist.

[edit] Timeline

Segment Date opened
SerpukhovskayaYuzhnaya November 11, 1983 13.0 km
YuzhnayaPrazhskaya November 6, 1985 1.1 km
SerpukhovskayaBorovitskaya January 23, 1986 2.8 km
BorovitskayaChekhovskaya December 31, 1987 1.6 km
ChekhovskayaSavyolovskaya December 31, 1988 4.2 km
SavyolovskayaOtradnoye March 3, 1991 8.5 km
OtradnoyeBibirevo December 31, 1992 2.6 km
BibirevoAltufyevo July 15, 1994 2.0 km
PrazhskayaUlitsa Akademika Yangelya August 31, 2000 2.0 km
Ulitsa Akademika YangelyaAnnino December 12, 2001 1.4 km
AnninoBulvar Dmitriya Donskogo December 26, 2002 2.0 km
Total: 25 stations 41.5 km

[edit] Transfers

# Transfer to At
1 Sokolnicheskaya Line Borovitskaya
2 Zamoskvoretskaya Line Chekhovskaya
3 Arbatsko-Pokrovskaya Line Borovitskaya
5 Koltsevaya Line Serpukhovskaya, Mendeleyevskaya
7 Tagansko-Krasnopresnenskaya Line Chekhovskaya
10 Lyublinsko-Dmitrovskaya Line Tsvetnoy Bulvar
11 Kakhovskaya Line Sevastopolskaya
L1 Butovskaya Light Metro Line Bulvar Dmitriya Donskogo

[edit] Rolling stock

The line is served by the Varshavskoe (№ 8) and Vladykino (№ 14) depots. In 2005 it began a slow transition to eight carriage trains. As of November 2005, Vladykino completed its transition and presently has 43 eight-carriage trains assigned to them. Varshavskoe began later and completed its transition in March 2006 with 38 eight-carriage trains. The line received new 81-714/717 trains upon its opening in 1983. Due to its recent extensions various trains were added to its ever-growing stock, some surplus from other depots, others factory fresh 81-714.5/717.5 and 81-714.5M/717.5M. When the Butovskaya Light Metro Line opened, the Varshavskoe depot became home to the new three-carriage 81-740/741 "Rusich" trains, 12 of which are currently being used.

[edit] Recent events and future plans

Second exits at Petrovsko-Razumovskaya, Savyolovskaya and Timiryazevskaya stations are planned. However, in terms of extensions, the line is considered to be complete. Although there is some need of connection to the south border parts of Moscow, it was decided that Butovskaya Light Metro Line will fulfil this need.

[edit] References

Personal tools
Namespaces

Variants
Actions
Navigation
Interaction
Toolbox
Print/export
Languages