Warszawska Kolej Dojazdowa

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Schematic of the WKD line, the grey area marks Warsaw.

Warszawska Kolej Dojazdowa (Warsaw Commuter Railway, WKD) is a suburban light rail line in Poland's capital city of Warsaw. The line, together with its two branches, links Warsaw with the municipalities of Michałowice, Pruszków, Brwinów, Podkowa Leśna, Milanówek and Grodzisk Mazowiecki to the south-west of Warsaw.

Contents

[edit] History

File:EKD marszalkowska.jpeg
Final station of EKD in Warsaw at Marszałkowska Street
File:EKD z tramwajem.jpeg
Intersection between EKD and city trams
A preserved original railcar from the 1920s (later designated PKP class EN80)
PKP class EN94 EMU at Warszawa Śródmieście WKD
PKP class EN94 EMU at Grodzisk Mazowiecki Radońska
PKP class EN95 EMU

The line was constructed and operated under the original name Elektryczna Kolej Dojazowa (Electric Commuter Rail) by a privately owned electrical power industry consortium Siła i Światło (Power and Light) established established with the participation of British capital shortly after Poland regained independence after World War I in 1918. The consortium sought to build an electric railway in order to accelerate economic development and increase the demand for its services. To achieve this goal it created in 1922 the company Elektryczne Koleje Dojazdowa S.A., owned in 40% by Siła i Światło, 25% by one of the financing banks and the remaining 35% held by small shareholders.

In 1924 the company received a concession from the ministry of transport to build a private railroad from Warsaw through Grodzisk Mazowiecki to Żyrardów, under the condition that it would be run least 2 kilometers from the existing line of the former Warsaw-Vienna Railway owned by the Polish State Railways (PKP). The work began in Komorów and proceeded simultaneously in two directions. In 1927 a 32.4 kilometers long standard gauge line electrified at 650 V DC with overhead wire was opened, linking Grodzisk Mazowiecki with the center of Warsaw. The line was connected with a 3 kilometer long non-electrified technical line with national rail system in Komorów, 24 kilometers of the line between Podkowa Leśna and Warsaw consisted of double track, the four kilometers long segment of the line leading to railroads final station in Warsaw at Marszałkowska Street was embedded in the city streets. The railroad operated 20 four-axle electric railcars produced by the English Electric Company at Preston, capable of traveling with a speed of up to 70 km/h, along with 20 unpowered passenger cars.

In 1932 the line was extended in Grodzisk Mazowiecki to reach Grodzisk Mazowiecki PKP station and a short branch line was built in Włochy just outside Warsaw, likewise linking with the Włochy PKP station. In 1936 a branch line was opened from Podkowa Leśna to Milanówek with PKP station there. Before the outbreak of World War II work was initiated on the construction of second line from Komorów to Nadarzyn and Mszczonów.

The Elektryczna Kolej Dojazowa in 1939 carried 4000 passengers a day and run trains every 10 minutes during rush hours. Its core business has not yet reached profitability, however the company made money reselling real estate which gained in value significantly due to the railroad.

During World War II the railroad remained operational during most of the German occupation albeit only on part of the line. In 1947 the company was nationalized by the Soviet installed communist government and in 1951 placed under the administration of the Polish State Railways and renamed to Warszawska Kolej Dojazdowa (Warsaw Commuter Rail), however the line retained a narrower loading gauge and its specific electrification system while the national rail network uses 3 kV DC. During the 1960s the line was gradually trimmed at its and ends and in Warsaw moved to newly built tracks in the cutting of western part of the Warsaw Cross-City Line. In 1972 the almost half-a-century old English Electric railcars were replaced by new PKP class EN94 EMUs produced by Pafawag in Wrocław designed specially for the line.

In 2001 with the restructuring of the Polish State Railways a separate company called PKP Warszawska Kolej Dojazdowa Sp. z o.o. was created within the PKP Group and in 2007 taken over by a consortium formed by the Masovian Voivodeship and the municipalities through which the line runs, dropping the letters PKP from its name.

Several proposal have been made for the modernization of line, proposing alternately either switching the line to standard tram rolling stock and eventually integrating with the Warsaw Tramway system or rebuilding the line to standard rail loading gauge and converting to 3 kV electrification system in order to integrate it with the national rail network. Additionally plans have been prepared for moving the final station of the line in Warsaw to Rondo Dmowskiego at Marszałkowska Street in order to facilitate easier transfers to the Centrum station on the city's first metro line and to build the line between Komorów and Nadarzyn, however as of 2011 no funds have been allocated towards any of those.

In 2004 Warszawska Kolej Dojazdowa received a single prototype of a new EMU designated PKP class EN95 built by PESA in Bydgoszcz which remains in service today, however no further units of this type have been ordered. Instead in 2010 the company ordered also from PESA 14 EMUs class EN97 (a.k.a. 33WE) of a completely new design, requiring in the specification the possibility to convert them to the voltage used on the national rail network.

[edit] Route

Warszawska Kolej Dojazdowa
If display breaks up,
clicking hide/show buttons may cure it.
Abbreviated in this map Abbreviated in this map
to Warszawa Wschodnia
Enter tunnel Enter tunnel
Unknown BSicon "utHSTq" Unknown BSicon "mtKRZt" Unknown BSicon "mtKRZt" Unknown BSicon "utSTRq"
Warsaw Metro Centrum
Unknown BSicon "tSTR" + Hub
Unknown BSicon "tHST" + Hub
Warszawa Śródmieście PKP
Unknown BSicon "tBHF" + Unknown BSicon "HUB26"
Unknown BSicon "tSTR"
Warszawa Centralna
Unknown BSicon "tSTR" + Hub
Unknown BSicon "tSTR" + Hub
Urban head station in tunnel + Hub
0.00 Warszawa Śródmieście WKD
Exit tunnel Exit tunnel Exit urban tunnel
Straight track
Stop on track + Hub
Urban stop on track + Hub
1.71 Warszawa Ochota Polish State Railways
Unknown BSicon "vLUECKE-" Straight track Straight track Urban straight track
to Warszawa Gdańska
Unknown BSicon "STRel" + Hub
Unknown BSicon "BHFm" + Hub
Unknown BSicon "BHFm" + Hub
Urban stop on track + Hub
2.61 Warszawa Zachodnia Polish State Railways
Stop on track + Hub
Straight track Straight track Urban straight track
Warszawa Wola
Abbreviated in this map Abbreviated in this map Abbreviated in this map Urban straight track
Urban stop on track
4.06 Warszawa Reduta Ordona
Stop on track + Hub
Urban stop on track + Hub
5.54 Warszawa Aleje Jerozolimskie
Track turning left Unknown BSicon "umKRZo" Transverse abbreviated in this map
Polish State Railways PKP line to Radom
Urban stop on track
6.97 Warszawa Raków
Urban stop on track
8.13 Warszawa Salomea
Urban stop on track
9.64 Opacz
Urban stop on track
11.38 Michałowice
Urban stop on track
12.96 Reguły
Urban stop on track
14.24 Malichy
Urban stop on track
15.48 Tworki
Urban stop on track
16.56 Pruszków WKD
Unknown BSicon "exLUECKEq" Unknown BSicon "muABZlg"
technical line to Pruszków PKP
Urban station on track
3.05/18.13 Komorów
Urban stop on track
19.60 Nowa Wieś Warszawska
Urban stop on track
21.36 Kanie Helenowskie
Urban stop on track
22.43 Otrębusy
Urban stop on track
24.04 Podkowa Leśna Wschodnia
Urban station on track
24.96 Podkowa Leśna Główna
Waterway turning from left Unknown BSicon "uABZrf"
Urban stop on track + Hub
Urban stop on track + Hub
0.48/25.86 Podkowa Leśna Zachodnia
Urban stop on track Urban straight track
1.53/-------- Polesie
Urban straight track Urban stop on track
27.39 Kazimierówka
Unknown BSicon "uKHSTe" Urban straight track
2.68/-------- Milanówek Grudów
Urban stop on track
28.89 Brzózki
Urban stop on track
30.23 Grodzisk Mazowiecki Okrężna
Urban stop on track
30.87 Grodzisk Mazowiecki Piaskowa
Urban stop on track
31.94 Grodzisk Mazowiecki Jordanowice
Urban End station
32.61 Grodzisk Mazowiecki Radońska

Starting as double-track from the Warszawa Śródmieście WKD terminus adjacent to the mainline Warszawa Centralna station, the line initially runs to the west alongside Warsaw's main east-west railway line before turning to the south-west on its own right of way. The length of the Warszawa Śródmieście WKD to Grodzisk Mazowiecki Radońska line is 33 km, and of the Milanówek branch 3 km. The stations are:[1]

Here the line splits into two single-track branches. The stations on the Milanówek branch (line 48) are:

The stations on the Grodzisk Mazowiecki branch (line 47) are:

There is a single-track non-electrified link between the Komorów station and the PKP rail network (Pruszków station), carrying no scheduled traffic.

[edit] Operation

The company's headquarters and the main technical depot are in Grodzisk Mazowiecki. The WKD is standard gauge and electrified at 600[2] Volts DC on the overhead system. Train service is provided by two classes of train sets:

  • Forty type EN94 six-axle articulated electric units, built from 1969-1972 in Wrocław and normally operated in pairs.
  • A single type EN95 ten-axle low-floor articulated electric units, built from 2004–present in Bydgoszcz and normally operated singly.

The company has on order, 14 new units which are scheduled to arrive in 2011.

The line also possesses a vintage type EN80 four-axle electric unit, built by English Electric at Preston in 1927, and a small diesel shunter, obtained second hand from PKP.[3][4]

On the main line, trains operate every 15 minutes at peak hours and every 30 minutes off-peak, with a service gap between midnight and 05:00. For most of the day, one train an hour runs through to Milanówek Grudów, with most of the other trains running through to Grodzisk Mazowiecki Radońska. All trains stop at all stations on their route, and a journey from Warszawa Śródmieście to Grodzisk Mazowiecki Radońska takes just under one hour.[5]

Within Warsaw's borders, WKD honours day tickets and transit passes issued by the Warsaw Transit Authority. [6]

[edit] References

  1. ^ "WKD - Route Map". Warszawska Kolej Dojazdowa. http://www.wkd.com.pl/index.php/pl/article_constant/114. Retrieved September 18, 2006. 
  2. ^ As the one and only public line in Poland. Any other electrified lines use 3kV DC overhead system.
  3. ^ "Rail Operators in Poland". railfaneurope.net. http://www.railfaneurope.net/list/poland.html. Retrieved September 19, 2006. 
  4. ^ "WKD shunters and trainsets". railfaneurope.net. http://www.railfaneurope.net/list/poland/poland_wkd.html. Retrieved September 19, 2006. 
  5. ^ "Rozkład jazdy kolejki WKD Warszawa - Grodzisk Mazowiecki". Warszawska Kolej Dojazdowa. http://www.wkd.com.pl/schedule_tables/schedule_from_warsaw.htm. Retrieved September 19, 2006. 
  6. ^ "ZTM Warszawa - tickets and charges". Zarzad Tranportu Miejskiego. http://www.ztm.waw.pl/index.php?c=145&l=2. Retrieved January 10, 2010. 

[edit] External links

Personal tools
Namespaces
Variants
Actions
Navigation
Interaction
Toolbox
Print/export
Languages