Sahaspur Road railway station
Appearance
Sahaspur Road railway station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Indian Railway | |||||||||||
General information | |||||||||||
Location | Kharra, Gopalpur, Bankura district, West Bengal India | ||||||||||
Coordinates | 23°07′57″N 87°40′34″E / 23.132514°N 87.676204°E | ||||||||||
Elevation | 40 metres (130 ft) | ||||||||||
Owned by | Indian Railways | ||||||||||
Operated by | South Eastern Railway | ||||||||||
Line(s) | Bankura–Masagram line | ||||||||||
Platforms | 1 | ||||||||||
Tracks | 1 | ||||||||||
Construction | |||||||||||
Structure type | Standard (on-ground station) | ||||||||||
Parking | No | ||||||||||
Other information | |||||||||||
Status | Functioning | ||||||||||
Station code | SHJ | ||||||||||
Division(s) | Adra | ||||||||||
History | |||||||||||
Opened | 1916 | ||||||||||
Closed | 1995 | ||||||||||
Rebuilt | 2005 | ||||||||||
Electrified | 2018–19 | ||||||||||
Previous names | Bankura Damodar Railway | ||||||||||
Services | |||||||||||
|
Sahaspur Road railway station is a railway station of Bankura–Masagram line under the Adra railway division of South Eastern Railway zone. It is situated at Kharra, Gopalpur in Bankura district in the Indian state of West Bengal.[1][2]
History
Old narrow-gauge Bankura–Damodar Railway (also called as Bankura Damodar River Railway) connecting Bankura and Rainagar in Bankura and Bardhaman districts was opened to traffic in sections between 1916 and 1917.[3] In 2005, the 118 kilometre-long railway section known as Bankura–Masagram line was converted to 1,676 mm (5 ft 6 in) broad gauge.[4] The whole track including Sahaspur Road railway station was electrified in 2018–19.[5][6]
References
- ^ roy, Joydeep. "Sahaspur Road Railway Station Map/Atlas SER/South Eastern Zone – Railway Enquiry". India Rail Info. Retrieved 2019-06-21.
- ^ "Sahaspur Road Railway Station (SHJ) : Station Code, Time Table, Map, Enquiry". NDTV. Retrieved 2019-06-21.
- ^ "Bankura's Iron Horses". Retrieved June 21, 2019.
- ^ "Indian Railway History Time line". Archived from the original on July 14, 2012. Retrieved June 21, 2019.
- ^ "Electrification of Masagram–Bankura stretch to cut travel time". business-standard.com. Retrieved June 21, 2019.
- ^ "Electrification of Railway Track". railnews.in. Retrieved June 20, 2019.