Jump to content

Jiujiang Yangtze River Bridge

Coordinates: 29°45′01″N 116°00′49″E / 29.7502°N 116.0136°E / 29.7502; 116.0136
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Naraht (talk | contribs) at 13:21, 9 September 2022 (top: cleanup and begin deleting image parameters no longer used by infobox bridges). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Jiujiang Yangtze River Bridge
Jiujiang Yangtze River Bridge
Coordinates29°45′01″N 116°00′49″E / 29.7502°N 116.0136°E / 29.7502; 116.0136
CarriesChina National Highway 105; Beijing–Kowloon railway
CrossesYangtze River
LocaleJiujiang, Jiangxi / Huangmei County, Hubei
Characteristics
DesignCombined truss-arch
Longest span216 meters (709 ft)
History
Construction start1973
Construction end1991
Opened1993
Location
Map

The Jiujiang Yangtze River Bridge is a combined road-rail bridge over the Yangtze River near the city of Jiujiang, Jiangxi Province in eastern China. It links Xunyang District of Jiujiang, south of the river, with Xiaochi Town in Huangmei County, Hubei Province, to the north. The central section of the bridge uses a combined arch and truss structure and the bridge is one of the longest continuous truss bridges in the world, with a longest span of 216 meters (709 ft) and a total truss length of 1,314 meters (4,311 ft) =3x162+180+216+180+2x126.[1] The double deck bridge carries four vehicular lanes and two sidewalks on the top deck and two railway tracks on the bottom deck.

History

Construction of the Jiujiang Yangtze River Bridge began in 1973 but due to work stoppages, the bridge was not completed until 1993.[2] The bridge was originally designed to carry trucks weighing up to 30 t (33 short tons).[2] In 2008, the tonnage limit was raised to 55 t (61 short tons).[2] In November 2011, a crack was discovered in the bridge's steel structure and forced the authorities to close the bridge to freight traffic.[3] In February 2012, the tonnage limit was lowered to 20 t (22 short tons).[2]

The Jiujiang Fuyin Expressway Bridge, a cable-stayed bridge 10 kilometres (6.2 mi) upstream, opened in 2013.

See also

References

  • Li, Guohao; Xiao, Rucheng (1999). "Design Practice in China". In Chen, Wai-Fah; Duan, Lian (eds.). Bridge Engineering Handbook (Google books). CRC Press. pp. 63–26. ISBN 978-0-8493-7434-0. Retrieved May 18, 2009.