Bhanga–Kuakata line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mehedi Abedin (talk | contribs) at 05:40, 24 August 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bhanga–Kuakata line
Overview
StatusPlanned
OwnerBangladesh Railway
LocaleBangladesh
Termini
Stations19
Service
TypeRailway line in Bangladesh
Operator(s)West Zone
History
Planned opening2030
Technical
Line length213.3 km (132.5 mi)
Track gaugeBroad-gauge 1,676 mm (5 ft 6 in)
Operating speed80 km/h
Route map
Bhanga–Kuakata line
Bhanga Junction
Baraitala
Tekerhat
Madaripur
Kalkini­
Gaurnadi­
Wazirpur­
Barisal Airport
Barisal
Dapdapia
Bakerganj
Badarpur
Patuakhali
Kukua
Amtali
Payra Port
Lemupara
Kuakata

The Bhanga–Kuakata line is a planned railway line Bangladesh to connect Bhanga with Beach City Kuakata in Patuakhali.[1] It is planned to build by 2030.[2] It also connects Barisal Division to the rest of Bangladesh.[3]

History

The Padma Bridge Rail Link Project brings South and South Western regions of Bangladesh under the railway network.[4] In the first phase, an initiative was taken to construct a broad gauge railway spanning 172 km from Dhaka's Kamalapur to Jessore in the southwestern district.[5]

On October 9, 2016, permission was given to build a railway from Faridpur's Bhanga Junction railway station to Port of Payra. Later, the project was extended from Payra to Kuakata. Construction was to start in 2022 with completion in 2030.[2]

The feasibility study proposal along with detailed design was approved by the Planning Minister on 9 October 2016. A consulting contract was signed on June 19, 2018. Project implementation progress is 40%.[6]

References

  1. ^ "Bhanga-Payra Rail Link project: Railway asks Providus about investment process". The Business Standard. 2021-10-24. Retrieved 2022-12-28.
  2. ^ a b Adhikary, Tuhin Shubhra (2021-06-02). "Payra rail link to cost Tk 40,000cr". The Daily Star. Retrieved 2022-12-28.
  3. ^ আলম, নাছিম উল. "ফরিদপুর-বরিশাল-পায়রা-কুয়াকাটা রেল লাইন নির্মাণ প্রকল্প সম্ভাব্যতা সমীক্ষা ও সহ ডিপিপি ফেব্রুয়ারির মধ্যে প্রস্তুত হচ্ছে". DailyInqilabOnline. Retrieved 2022-12-28.
  4. ^ "Installation of rail tracks on Padma Bridge begins". The Business Standard. 2022-12-02. Retrieved 2022-12-28.
  5. ^ "পদ্মা সেতুর রেল সংযোগ নির্মাণের উদ্বোধন রবিবার". Bangla Tribune (in Bengali). Retrieved 2022-12-28.
  6. ^ "ঢাকা-বরিশাল রেল সংযোগ হবে ২০২৫ সালে". www.jugantor.com. Retrieved 2022-12-28.