Jump to content

Chickpete metro station

Coordinates: 12°58′00″N 77°34′29″E / 12.966759°N 77.574782°E / 12.966759; 77.574782
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Sanjeev4125 (talk | contribs) at 11:53, 31 August 2023 (Station layout). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chickpete
Namma Metro station
General information
Other namesChikkapete, Chickpet
LocationBVK Iyengar Rd, Old Tharagupete, Mamulpete, Sultanpete, Bengaluru, Karnataka 560053
Coordinates12°58′00″N 77°34′29″E / 12.966759°N 77.574782°E / 12.966759; 77.574782
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsIsland platform
Platform-1 → Nagasandra
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeUnderground, Double track
Platform levels2
ParkingCar parking Yes[1]
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeCKPE
History
Opened18 June 2017; 7 years ago (2017-06-18)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Majestic
towards Madavara
Green Line Krishna Rajendra Market
Location
Map

Chickpete is an underground metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. It is part of the Phase I of Namma Metro project. It was opened to the public on 18 June 2017.[2]

Station layout

Chickpete track layout
P1
P2
Station with two tracks and one Island platform
G Street Level Exit/ Entrance
M Mezzanine Fare control, station agent, Ticket/token, shops
P Platform 2
Southbound
Towards → Silk Institute next station is Krishna Rajendra Market
Island platform | Doors will open on the right Disabled access
Platform 1
Northbound
Towards ← Nagasandra next station is Nadaprabhu Kempegowda Stn., Majestic Change at the next station for Purple Line

Entry/Exits

There are 4 Entry/Exit points – A, B, C and D. Commuters can use either of the points for their travel.

  • Entry/Exit point A:- Towards Manivartapete (Sultanpete) side
  • Entry/Exit point B:- Towards KR Market side
  • Entry/Exit point C:- Towards Sultanpete side
  • Entry/Exit point D:- Towards Manivartapete side

See also

References

  1. ^ Kaushal, Ravi (17 June 2017). "Namma Metro: Green line of Bengaluru metro to be inaugurated by President Pranab Mukherjee; all you must know". India.com. Retrieved 18 June 2017.
  2. ^ "Inaugural Metro ride to south is a sweep of lovely landscapes". Deccan Herald. Retrieved 18 June 2017.