Jump to content

Orange Line (Namma Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 217.165.244.93 (talk) at 06:02, 4 October 2023 (Hosahalli-Kadabagere Line). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Orange Line
Overview
Other name(s)ORR-West Line
StatusPlanned
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
  • JP Nagar IV Phase (JD Mall)
  • Kempapura
Stations22 (Corridor-I) + 11 (Corridor-II)
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)TBD
History
Planned opening2028; 4 years' time (2028)
Technical
Line length42 km (26 mi)
Number of tracks2
CharacterTBD
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Orange Line Map (TBC)

JP Nagar Phase 4
Pink Line
Under construction
JP Nagar Phase 5
Green Line Jaya Prakash Nagar
Kadirenahalli Cross
Kamakya Bus Depot
Hosakerahalli Cross
PES Institute of Technology
Purple Line Mysuru Road
Indian Railways
Nagarbhavi Circle
Vinayaka Layout
Hosahalli
Dr. Ambedkar Institute of Technology
KHB Colony
BDA Complex
Vinayaka Nagar
Sumanahalli Cross
Sunkadakatte
Chowdeshwari Nagar
Herohalli
Freedom Fighters Cross
Byadarahalli
Kanteerava Studio
Forest Gate
Peenya
Indian Railways
Kadabagere
Bahubhali Nagar
BEL Circle
Indian Railways
Patelappa Layout
Hebbala
(proposed)
Kempapura
Blue Line
Under construction
Legend:
JP Nagar Phase 4 ⇔ Kempapura (Corridor-1)
Sri Balagangadharanatha Swamiji Stn., Hosahalli ⇔ Kadabagere (Corridor-2)

The ORR-West Line (provisionally Orange Line) is a proposed line that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3A of Namma Metro consists of two lines that are planned to be opened sometime in 2028-29.[1][2][3][4] Both lines will have a common depot at Sumanahalli where the new lines will intersect.

Stations

ORR-West Line (Orange Line)

The ORR-West Line is planned to have 22 stations.[1]

ORR-West Line (Orange Line)
# Station Name Connections
English Kannada
1 Jayaprakash Nagara Phase 4 ಜಯಪ್ರಕಾಶ ನಗರ ೪ನೇ ಹಂತ  Pink 
2 Jayaprakash Nagara Phase 5 ಜಯಪ್ರಕಾಶ ನಗರ ೫ನೇ ಹಂತ
3 Jayaprakash Nagara ಜಯಪ್ರಕಾಶ ನಗರ  Green 
4 Kadirenahalli Cross ಕದಿರೇನಹಳ್ಳಿ ಅಡ್ಡ
5 Kamakya Bus Depot ಕಾಮಾಕ್ಯ ಬಸ್‌ ಘಟಕ Bus interchange Kamakya Bus Depot
6 Hosakerahalli Cross ಹೊಸಕೆರೆಹಳ್ಳಿ ಅಡ್ಡ
7 PES Institute of Technology ಪಿ ಇ ಎಸ್ ತಂತ್ರಜ್ಞಾನ ಸಂಸ್ಥೆ
8 Mysuru Road ಮೈಸೂರು ರಸ್ತೆ  Purple 
9 Nagarabhavi Circle ನಾಗರಬಾವಿ ವೃತ್ತ
10 Vinayaka Layout ವಿನಾಯಕ ಬಡಾವಣೆ
11 Dr. Ambedkar Institute of Technology ಡಾ|| ಅಂಬೇಡ್ಕರ್‌ ತಂತ್ರಜ್ಞಾನ ಸಂಸ್ಥೆ
12 Nagarbhavi B D A Complex ನಾಗರಬಾವಿ ಬಿ ಡಿ ಎ ಸಂಕೀರ್ಣ
13 Sumanahalli Cross ಸುಮನಹಳ್ಳಿ ಅಡ್ಡ Hoshalli-Kadabagere Line
14 Chowdeshwari Nagara ಚೌಡೇಶ್ವರಿ ನಗರ
15 Freedom Fighters Cross ಸ್ವಾತಂತ್ರ್ಯ ಹೋರಾಟಗಾರರ ಅಡ್ಡ
16 Kanteerava Studio ಕಂಠೀರವ ಕಲಾಮಂದಿರ
17 Peenya ಪೀಣ್ಯ  Green 
18 Bahubhali Nagara ಬಾಹುಬಲಿ ನಗರ
19 B E L Circle ಬಿ ಇ ಎಲ್ ವೃತ್ತ
20 Patelappa Layout ಪಟೇಲಪ್ಪ ಬಡಾವಣೆ
21 Hebbala ಹೆಬ್ಬಾಳ Mainline rail interchange Hebbala Suburban Railway

Bus interchange BMTC Bus Depot

22 Kempapura ಕೆಂಪಾಪುರ  Blue 

Hosahalli-Kadabagere Line (Grey Line)

This line is planned to have 9 stations.[1] and is yet to be announced.

Hosahalli-Kadabagere Line
# Station Name Connections
English Kannada
1 Hosahalli ಹೊಸಹಳ್ಳಿ  Purple 
2 K H B Colony ಕೆ ಎಚ್ ಬಿ ಕಾಲೋನಿ
3 Vinayaka Nagara ವಿನಾಯಕ ನಗರ
4 Sumanahalli Cross ಸುಮನಹಳ್ಳಿ ಅಡ್ಡ  Orange 
5 Sunkadakatte ಸುಂಕದಕಟ್ಟೆ
6 Herohalli ಹೇರೋಹಳ್ಳಿ
7 Byadarahalli ಬ್ಯಾಡರಹಳ್ಳಿ
8 Forest Gate ಅರಣ್ಯ ದ್ವಾರ
9 Kadabagere ಕಡಬಗೆರೆ

See also

References

  1. ^ a b c "Bangalore Metro Phase 3 to cover 42 km, have 31 stations". New indian Express. 27 October 2021.
  2. ^ "42 KMs Bangalore Metro Phase-3 Project will start its operation by 2027-28". Metro Rail News. 27 October 2021.
  3. ^ "Bengaluru Metro: Rs 16328 cr Phase III gets state govt nod; check stations, timeline, other details". TimesNow. Retrieved 20 November 2022.
  4. ^ "Bengaluru metro's third phase to cost Rs 16,328 cr, to be ready in 2028". Deccan Herald. 19 November 2022. Retrieved 20 November 2022.