Tseung Kwan O line
Tseung Kwan O line 將軍澳綫 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | MTR Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Districts: Sai Kung, Kwun Tong, Eastern | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connecting lines | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 8 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Color on map | Purple (#7D499D) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | MTR | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | MTR Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Kowloon Bay (2002-2009) Tseung Kwan O | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 333,300 daily average (weekdays, September 2014)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 4 August 2002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Last extension | 26 July 2009LOHAS Park) | (|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 12.3 km (7.6 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | Double-track | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,432 mm (4 ft 8+3⁄8 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 1,500 V DC (Overhead lines) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | Advanced SelTrac CBTC (2028/2029) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train protection system | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Tseung Kwan O line | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 將軍澳綫 | ||||||||||||
Simplified Chinese | 将军澳线 | ||||||||||||
|
The Tseung Kwan O line (Chinese: 將軍澳綫) is one of the ten lines of the MTR system in Hong Kong, indicated by the colour purple. It is currently 12.3 kilometres (7.6 mi) long, taking 15 minutes to travel throughout the entire line.
The line runs from North Point on the Hong Kong Island to the new town of Tseung Kwan O. It bifurcates east of Tseung Kwan O station into two branches, one northward to Po Lam and one southward to LOHAS Park. The Tseung Kwan O Depot at LOHAS Park is responsible for the maintenance of the line's rolling stock.
During the morning peak period, the Tseung Kwan O line uses 15 trains to maintain a frequency of 2.5 minutes between Tseung Kwan O and North Point.
Route map
Route description
The Tseung Kwan O line is the first MTR line with no tracks on viaducts. It was the only line with tracks completely in tunnels until the completion of LOHAS Park station, which there are two short sections nearby that are not in tunnels. The stations of Yau Tong, Po Lam and LOHAS Park are at ground level, but are completely shielded to minimise noise to the surrounding development. The rest of the line has its tracks located underground.
The western terminus of the line is North Point, providing cross-platform interchange together with the neighbouring station of Quarry Bay. East of Quarry Bay, the line passes under Victoria Harbour to Yau Tong station, a station serving the East Kowloon neighbourhood of the same name, using the rail tunnel of the Eastern Harbour Crossing. From Yau Tong, the line passes through the Black Hill Tunnels to enter Tseung Kwan O New Town at Tiu Keng Leng.
Within Tseung Kwan O new town, the line splits into two branches east of Tseung Kwan O station. One branch reaches Hang Hau and Po Lam stations in the northern part of the new town, whereas the southward branch connects LOHAS Park station in Area 86. LOHAS Park is a large residential development built above the Tseung Kwan O Depot, where the trains of the line are maintained.
Train operations
Operation of the line is relatively complex because of the split into two branches at Tseung Kwan O.
The majority of trains on the line run through from Po Lam to North Point and vice versa. Through service between LOHAS Park and North Point is only provided during rush hour; during non-peak periods, LOHAS Park is only served by "shuttle trains" that terminate at Tiu Keng Leng, operating at 12-minute intervals. Passengers travelling to and from LOHAS Park during non-peak hours are required to change trains at Tiu Keng Leng or Tseung Kwan O in order to continue their journey.
Train headways are as follows:
- Rush hour: One through train to/from LOHAS Park after two trains to/from Po Lam
- North Point - Po Lam trains: every 2.5 or 4 minutes
- North Point - LOHAS Park trains: every 7–8 minutes
- combined headway between North Point and Tseung Kwan O is 2.5 minutes.
- Non-peak period:
- Mon-Fri, Sat (10:00-20:00) and Sun (09:00-20:00)
- North Point - Po Lam trains: every 4 minutes
- Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
- No through service from LOHAS Park to North Point, vice versa
- Every day between 20:00 and 00:00
- North Point - Po Lam trains: every 5 minutes
- Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
- No through service from LOHAS Park to North Point, vice versa
- Every day after 00:00
- North Point to Po Lam trains: every 6 minutes
- Po Lam to North Point trains: every 8–9 minutes
- Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
- Mon-Fri, Sat (10:00-20:00) and Sun (09:00-20:00)
History
The Tseung Kwan O line was planned to serve the new town of Tseung Kwan O and was first proposed in 1981 as part of the Junk Bay New Town Transport Study.[4] The report proposed four corridors, all of which called for the Kwun Tong line to be extended to Lam Tin station and placed the terminus of the Tseung Kwan O line at the vicinity of Tsui Ping Estate.[5] The construction cost was estimated at HK$3 billion.[6] The construction of the Tseung Kwan O line was approved by the Hong Kong Government in 1985 and under the 1985 plan, a 7 km (4.3 mi) branch line from Lam Tin station to Tseung Kwan O station, consisting of 5 or 6 stations, was to be built beginning in 1992 and to open by the end of 1996.[7] This plan was cancelled by the MTR Corporation in August 1990.[8]
MTR re-proposed the line in 1993, and the plan was approved by the Hong Kong Executive Council on 20 October 1998. Construction commenced on 24 April 1999 and the line opened on 18 August 2002, at a cost of HK$18 billion.[9] The new line took over the cross-harbour segment, via the Eastern Harbour Crossing to North Point station, from the Kwun Tong line. The Kwun Tong line was extended to Yau Tong and Tiu Keng Leng stations to interchange with the new line.
Trains
The line is served by the K-Stock and M-Trains. The K-Stock trains were manufactured by a consortium of Hyundai Rotem and Mitsubishi Corporation, and were expected to be quieter and to use energy generated from deceleration.
Although tailor-made for the line, the K-Stock trains actually ran on the Kwun Tong line from launch through April 2010, and the original M-Trains ran on this line instead. The K-Stock trains were finally transferred to this line in April 2010.
Stations
This is a list of the stations on the Tseung Kwan O line.
List
Service | Livery | Station Name | Images | Interchange; Adjacent transportation |
Opening | District | ||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
Tseung Kwan O Line (TKL) | ||||||||
● | ● | Tamar | 添馬 | Tung Chung line | TBA | Central and Western | ||
● | ● | Exhibition Centre | 會展 | East Rail line | Wan Chai | |||
● | ● | Causeway Bay North | 銅鑼灣北 | — | ||||
● | ● | North Point | 北角 | Island line | 27 September 2001; 23 years ago[a] |
Eastern | ||
● | ● | Quarry Bay | 鰂魚涌 | 6 August 1989; 35 years ago[a] | ||||
● | ● | Yau Tong | 油塘 | Kwun Tong line | 4 August 2002; 22 years ago |
Kwun Tong | ||
● | ● | Tiu Keng Leng | 調景嶺 | 18 August 2002; 22 years ago |
Sai Kung | |||
● | ● | Tseung Kwan O | 將軍澳 | — | ||||
● | | | Hang Hau | 坑口 | |||||
● | | | Po Lam | 寶琳 | |||||
LOHAS Park Branch Line | ||||||||
● | LOHAS Park | 康城 | — | 26 July 2009; 15 years ago |
Sai Kung | |||
Notes
- ^ a b Originally opened as part of the Kwun Tong line.
Future development
The Tseung Kwan O line will probably be extended to Tamar station and interchange with an extended Tung Chung line there. This is according to the "interchange scheme" devised for the North Island line, which would also see the line serve stations at Fortress Hill, Causeway Bay North and Exhibition Centre, the latter of which would provide a connection with the Sha Tin to Central Link extension of the North South Corridor (East Rail Line to Admiralty). Construction is not expected to begin before 2021.
Under an earlier proposal, called the "swap scheme", the line would have taken over the section of the Island line from Fortress Hill to Kennedy Town; with the remaining section east of Tin Hau being transferred to the Tung Chung line. This was rejected as the existing Island line would be interrupted and require an interchange.
See also
References
- ^ "Weekday patronage of MTR heavy rail network from September 1 to 27 and September 28 to October 25, 2014" (PDF). Legislative Council. 29 October 2014. Archived (PDF) from the original on 15 May 2021. Retrieved 15 April 2015.
- ^ "Business Overview" (PDF). MTR. July 2021. p. 6. Archived (PDF) from the original on 30 December 2019. Retrieved 8 August 2022.
- ^ "Annual Report 2021" (PDF). MTR Corporation. 10 March 2022. p. 22. Archived (PDF) from the original on 10 October 2022. Retrieved 6 August 2022.
In 2021, we continued with the project to replace the existing signalling system ("SACEM System") on our four urban lines (Island, Tseung Kwan O, Kwun Tong and Tsuen Wan lines).
- ^ 《Junk Bay New Town Transport Study·RAIL TRANSPORT - ALTERNATIVE ALIGNMENTS》
- ^ 《Junk Bay New Town Transport Study· POSSIBLE MASS TRANSPORT ACCESS ROUTES》
- ^ "支線全長約七公里 將有五至六個車站 經藍田調景嶺填海區直達將軍澳 近三十三萬人口保證乘客量足夠". Page 5 of Ta Kung Pao. 25 December 1987.(in Chinese)
- ^ "李敦接受記者訪問表示 地鐵建將軍澳支線 財政安排正待批准 如獲港府批准將於九二年動工". Page 5 of Ta Kung Pao. 25 December 1987.(in Chinese)
- ^ "地鐵已明確表態不興建將軍澳支線". Page 1 of Wah Kiu Yat Po (華僑日報). 27 August 1990.(in Chinese)
- ^ "地鐵支線通車 市民「趁熱鬧」 爭搭頭班車千人大混亂". Apple Daily. 19 August 2002. Archived from the original on 1 May 2015. Retrieved 15 May 2014.(in Chinese)
External links
- Success Story - Tseung Kwan O Extension Project, MTRCL, 2005 Archived 13 November 2007 at the Wayback Machine