Lize Shangwuqu station
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Lize Road and Xiquxueyuan Road (戏曲学院路) Taipingqiao Subdistrict, Fengtai District, Beijing China | |||||||||||||||
Coordinates | 39°52′05″N 116°20′10″E / 39.867957°N 116.336174°E | |||||||||||||||
Operated by | Beijing MTR Corporation Limited | |||||||||||||||
Line(s) | Line 14 | |||||||||||||||
Platforms | 2 (1 island platform) | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 31, 2021 (Line 14) TBD (Line 16) 2025 (Daxing Airport Express)[1] | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Lize Shangwuqu station[2] (simplified Chinese: 丽泽商务区站; traditional Chinese: 麗澤商務區站; pinyin: Lìzé Shāngwùqū zhàn; lit. 'Lize Business District station') is a station on Lines 14, 16 and Daxing Airport Express of the Beijing Subway in Fengtai District.
Opening time
Line 14 (middle section): December 31, 2021
Line 16 (southern section): To be determined[3]
Daxing Airport Express (northern extension): expected to open in 2025[1]
Location
The station, located outside the Southwest 2nd Ring Road, is being built at the intersection of the east-west Lize Road (丽泽路), which Line 14 will run parallel to, and the north-south Xiquxueyuan Road (戏曲学院路), which Line 16 will run parallel to.[4] Both roads are under construction in the station's vicinity.
Station layout
Both the line 14 and line 16 stations have underground island platforms. The Daxing Airport Express station features a city terminal which provides in-town check-in and baggage drop services.
Gallery
-
Lifts to line 14 platform from concourse
-
Reserved escalators to line 16 from line 14 concourse
-
Reserved interchange interface between lines 14 and 16
-
line 14 west bottleneck
References
- ^ a b ""轨道上的京津冀"建设再提速". 2023-06-05.
- ^ "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
- ^ "北京地铁16号线南段开通时间". Archived from the original on 2021-01-07. Retrieved 2021-01-21.
南段(甘家口站(不含)至宛平城站)计划力争2022年底开通运营
- ^ 丽泽商务区站. Beijing Municipal Planning Committee. Archived from the original on 2016-04-05. Retrieved 2016-11-21.