Jump to content

A5 motorway (Serbia)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Frank b26 (talk | contribs) at 20:39, 31 January 2021 (→‎List of exits: Fixes, removed random italics). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Autoput A 5 shield}}
Autoput A 5
Serbian: Autoput A5
Serbian Cyrillic: Аутопут А5
Route information
Part of E761
Length0 km (0 mi; 0 ft)
1,123 km (698 mi) planned
Major junctions
FromPojate
ToPreljina (Čačak)
Location
CountrySerbia
Major citiesKruševac, Kraljevo, Čačak
Highway system
A4 A1

The A5 motorway (Serbian: Аутопут А5, romanizedAutoput A5), called the Morava Corridor (Serbian: Моравски коридор, romanizedMoravski koridor) is a motorway in Serbia under construction and when finished it will span for approximately 112 kilometers (70 mi). It begins in Pojate, north of Kruševac, at the junction with A1 motorway and runs westward to Preljina near Čačak, where it will intersect with A2 motorway. The construction started in December 2019 with the main contractor Bechtel.[1]

Route

The highway will mostly go through The West Morava Valley and will connect the Rasina District, Raška District and Moravica District, with combined population of about 760,000 inhabitants. There will be no tunnels, but some 78 bridges are planned on the route.

List of exits

Nr km Name Route Places Note
1 0 Pojate A1 / E75 Belgrade, Novi Sad, Subotica, Sremska Mitrovica, Kragujevac, Niš Currently an exit from A1, planned to be upgraded to interchange.
2 3 Ćićevac 190 Ćićevac, Varvarin This exit is planned to be constructed
3 20 Kruševac East 38 Kruševac This exit is planned to be constructed
4 21 Kruševac West 38 Kruševac This exit is planned to be constructed
5 36 Velika Drenova 187 Rekovac This exit is planned to be constructed
6 47 Trstenik 23 Trstenik This exit is planned to be constructed
7 58 Vrnjačka Banja 23 Vrnjačka Banja This exit is planned to be constructed
8 69 Vrba 23
24
Kraljevo This exit is planned to be constructed
9 75 Kamidžora 23 Kraljevo This exit is planned to be constructed
10 82 Adrani 22

23

Kraljevo, Mataruška Banja, Novi Pazar This exit is planned to be constructed
11 97 Mrčajevci 46 Knić, Kragujevac This exit is planned to be constructed
12 108 Preljina 22
23
179
Čačak This exit is planned to be constructed
13 109 Preljina A2 / E763 Belgrade, Valjevo, Požega, Užice, Sarajevo (Bosnia and Herzegovina), Podgorica (Montenegro) Currently an exit from A2, planned to be upgraded to interchange.

References

  1. ^ "Works on Morava Corridor to begin on December 15". ekapija.com. Retrieved 10 December 2019.