Alpha Wind Casimcea Wind Farm

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Wind Farm Casimcea
Country Romania
Location Casimcea
Status U
Commission date 2012 (100 MW), 2013 (100 MW), 2014 (80 MW)
Construction cost €300 million
Owner(s) Alpha Wind
CAS Regenerabile
Power generation
Units operational 77 x 2,3-3 MW

The Wind Farm Casimcea is an under construction wind power project in Tulcea County, Romania. It will consist of an individual wind farm with 77 individual wind turbines with a nominal output of around 2,3-3  MW which will deliver up to 688 000 000 kWh of power, enough to power over 445,000 homes, with a capital investment required of approximately €300 million.[1]

References[edit]

  1. ^ "Parc eolian de 200 MW la Casimcea" (in Romanian). green-report.ro. 2010-07-30. Retrieved 2010-12-17.