Jump to content

Avadi railway station

Coordinates: 13°07′06″N 80°06′01″E / 13.118223°N 80.100313°E / 13.118223; 80.100313
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by John of Reading (talk | contribs) at 07:39, 8 March 2016 (History: Typo fixing, replaced: on on → on using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Avadi

ஆவடி
Station of Chennai Suburban Railway and Southern Railways
General information
LocationTirumalairajapuram, Avadi, Chennai, Tamil Nadu, India
Coordinates13°07′06″N 80°06′01″E / 13.118223°N 80.100313°E / 13.118223; 80.100313
Owned byMinistry of Railways, Indian Railways
Line(s)West, West North and West South lines of Chennai Suburban Railway.
Platforms4
Tracks6
Construction
Structure typeStandard on-ground station
ParkingAvailable
Other information
Station codeAVD[1]
Fare zoneSouthern Railways
History
Electrified29 November 1979[2]
Previous namesSouth Indian Railway
Passengers
201340,000/day[3]

Avadi railway station is one of the major railway termini of the Chennai Central–Arakkonam section of the Chennai Suburban Railway Network. It serves the neighbourhood of Avadi, a suburb of Chennai located 23 km west of the city centre. It is situated at Tirumalairajapuram in Avadi, with an elevation of 26.85 m above sea level.

According to a railway release in 2008, there are plans to develop Avadi station as a coaching terminal (satellite terminal) for Chennai Central railway station, on the lines of Tambaram station being developed as a terminal for Egmore railway station.[4]

History

The first lines in the station were electrified on 29 November 1979, with the electrification of the Chennai Central–Tiruvallur section. The EMU car shed lines at Avadi were electrified on 1 February 1980. Additional lines at the station were electrified on 2 October 1986, with the electrification of the Villivakkam–Avadi section.[2]

The Electrification preliminaries such as poles, etc., were observed on the Railway Lines passing through Avadi Railway Station as early as 1977.The first B.G Electric EMUs were first introduced on the Madras Central Gummidipoondi section by 1979 and in the next phase on the Madras Central- Tiruvallur section around 1980 as stated above.From around 1971 to 1980, there these beastly WP Steam Locomotives that were doing honours for the Suburban trains going up to Tiruvallur and Gumidipoondi.The WDS category Shuttle Diesel were seen pulling the Pattabiram Military Siding Trains going up to E Depot in the Avadi Air Force Station Cantonment Area.It helped identifying the Trains.As for the Express Trains passing through Avadi,those were Diesel Electrics.In the late sixties and early seventies,it was probably the Baldwin Class WP Steam Locos that were hauling trains such as Dadar Express and Bombay Mail from Kalyan taking over the duties from the mighty WCM DC Electrics operating on the Bombay-Kalyan Route.

Layout

The station has six tracks, including two loop lines, and has four platforms. The first platform is a side platform housing the station's entrance and the ticket counter, and the second and third are part of an island platform. The fourth platform borders the northern end of the station and is the longest of all the platforms. The platforms are connected by means of a footbridge.

As of 2013, the station handles about 40,000 passengers a day.[3]

Developments

Avadi is one of the railway stations in the Chennai Suburban Railway network that are being developed as Adarsh stations.[5]

See also

References

  1. ^ "Railway Station Codes". stationcodes.com. Retrieved 26 August 2012. {{cite web}}: Cite has empty unknown parameter: |coauthors= (help)
  2. ^ a b "IR Electrification Chronology up to 31.03.2004". History of Electrification. IRFCA.org. Retrieved 17 November 2012. {{cite web}}: Cite has empty unknown parameter: |coauthors= (help)
  3. ^ a b "Go northwest, but don't take a train". The Times of India. Chennai: The Times Group. 27 April 2013. Retrieved 28 April 2013. {{cite news}}: Cite has empty unknown parameter: |coauthors= (help)
  4. ^ "Plans to develop Avadi or Ambattur railway station". The Times of India. Chennai: The Times Group. 16 November 2008. Retrieved 23 August 2012. {{cite news}}: Cite has empty unknown parameter: |coauthors= (help)
  5. ^ "Nemilichery station to be ready in three months". The Times of India. Chennai: The Times Group. 4 August 2009. Retrieved 4 October 2012. {{cite news}}: Cite has empty unknown parameter: |coauthors= (help)

Template:Chennai - Suburban Railway,West