Changi Airport MRT station

From Wikipedia, the free encyclopedia
  (Redirected from Changi Airport Station)
Jump to navigation Jump to search

MRT Singapore Destination 3.png
 CG2 
Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport
Rapid transit
Changi Airport MRT Station (EWL - Changi Branch) - Platform A.jpg
Changi Airport station platform level
Location70 Airport Boulevard
Singapore 819661
Coordinates1°21′26.54″N 103°59′19.81″E / 1.3573722°N 103.9888361°E / 1.3573722; 103.9888361
Operated bySMRT Trains (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsChangi Airport Bus Terminal, Taxi
Construction
Structure typeUnderground
Platform levels1
ParkingYes (Changi Airport)
Bicycle facilitiesYes (Changi Airport)
Disabled accessYes
Other information
Station code CG2 
History
Opened8 February 2002; 17 years ago (2002-02-08)
Opening2040; 21 years' time (2040) (Thomson-East Coast Line)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
towards Tanah Merah
East West line
Changi Airport Branch Line
Terminus
Location

Changi Airport MRT station (CG2) is an underground Mass Rapid Transit (MRT) station on the East West Line in Changi, Singapore. The station is located within the Singapore Changi Airport, hence its name.

This station is one of the three stations on the Changi Airport Branch Line of the East West Line; the other two are Tanah Merah MRT station and Expo MRT station. Changi Airport station is the eastern terminus of this branch line. It is also one of the few stations, such as Stevens MRT station, where faregates are on the same level as the platforms.

As the only MRT Station to serve the Changi planning area, it is also the easternmost MRT station in Singapore; however, this title will be taken by the Aviation Park MRT station when it opens in 2029.

Announced on 25 May 2019, the station will be converted to the Thomson–East Coast Line, connecting to Changi Airport Terminal 5 by 2040.[1][2]

History[edit]

Linkway between Changi Airport Terminal 2 and Terminal 3 above the station's platform level
Changi Airport MRT station, featuring flight information box in addition to train route information
Changi Airport is one of the few stations where faregates are on the same level as the platforms.

Before the MRT line, Changi Airport had been operating with no rail link and with full reliance on taxi and bus connections since the airport began operations in 1981. This has proven effective given the short 20 kilometre distance to the city via the East Coast Parkway and affordability of taxis and buses. Public buses instead link commuters to nearby MRT stations at Bedok, Tampines and Pasir Ris. Therefore, there were previously unsuccessful attempts to propose an extension to Changi Airport.[3][4]

The idea of extending the Mass Rapid Transit system to Changi Airport was reconsidered when Terminal 3 was being built.[5] The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah,[6] with some conceptual plans showing a tentative route alignment up to the airport along Airport Boulevard, continuing beyond the airport to Changi Point, before turning southwest back towards the city along the east coast of the island. The plans were finally announced by then Deputy Prime Minister Lee Hsien Loong on 15 November 1996.[7] However, the route alignment showed a deviation from previous plans.[8][9] The final plan involved building only the first two stations, namely Expo, and the Changi Airport station, the underground station built between Terminal 2 and Terminal 3. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.

Since the station's opening, passenger traffic has been moderate, as most bus routes were maintained and continue to be a popular means of cheap, direct transport for local airport/airline employees, as well as travellers not living along the East West Line. Many air travellers also prefer to continue taking taxis or private transport as all of the MRT services do not have luggage racks. Peak hours on the Changi Airport Line are defined according to the flight schedules. Thus primary users of the station are usually confined to airport/airline employees, leisure visitors, well-wishers, and budget air travellers, in particular backpackers. This station receives a huge load of traffic during weekends due to the Jewel Changi Airport.

On 24 July 2002, a glass panel of the atria wall shattered. The area was quickly closed off, but train services were not affected.[10]

The initial numbering of the station was EW29, but was changed on 20 June 2003 to CG2. The original code is now used for Joo Koon station.

The Tanah Merah-Expo route was initially operated as a shuttle service; through services from Boon Lay commenced after the opening of this station.[11] However, due to low ridership, the route reverted to being operated as a shuttle service from 22 July 2003.[12]

On 24 September 2003, a man died at the station, apparently having fallen five stories from the departure hall.[13]

Proposal of line extension[edit]

On 25 May 2019, the Land Transport Authority announced an extension of the Thomson-East Coast Line (TEL) to Changi Airport. Set to be completed by 2040, The TEL will be extended from its current terminus at Sungei Bedok MRT station to serve the future Changi Airport Terminal 5, and the stretch between Tanah Merah and Changi Airport, which is currently part of the East-West Line, will be transferred over to the Thomson-East Coast Line.[14]

See also[edit]

References[edit]

  1. ^ "New MRT stations, line extensions and a possible new rail line: LTA's 2040 blueprint". TODAYonline. Retrieved 25 May 2019.
  2. ^ "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". www.lta.gov.sg. Retrieved 26 May 2019.
  3. ^ "MRT Link to Airport: Not in next 10 years". The Straits Times. 17 May 1991.
  4. ^ "No MRT Line to Changi yet". The Straits Times. 20 March 1992.
  5. ^ "MRT extension to airport reconsidered". The Straits Times. 2 August 1994.
  6. ^ "Next Stop:Changi Airport?". The New Paper. 2 August 1994.
  7. ^ "Singapore Mass Rapid Transit Employees' Union (SMRTEU)'s annual Dinner and Dance" (PDF). NAS. 15 November 1996. Retrieved 10 July 2019.
  8. ^ "MRT Line will not go beyond passenger terminals". The Straits Times. 12 December 1996. Retrieved 17 October 2019.
  9. ^ "Changi Airport MRT line details". The Business Times. 12 December 1996.
  10. ^ "Joint Press Release By Land Transport Authority And Singapore MRT Ltd Atria Wall In Changi Airport MRT Station". Ministry of Transport. 24 July 2002. Archived from the original on 16 January 2018. Retrieved 16 January 2018. At 12.05pm, a piece of tempered glass at the atria wall in the Changi Airport MRT Station shattered into small fragments.
  11. ^ "Boon Lay to Expo: MRT now running". The Straits Times. 20 December 2001.
  12. ^ "Board MRT to airport from Tanah Merah". The Straits Times. 18 July 2003.
  13. ^ "Man Dies at Changi Airport". TODAY. 25 September 2003.
  14. ^ "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". www.lta.gov.sg. Retrieved 26 May 2019.

External links[edit]