Chengdu–Chongqing intercity railway
Chengdu–Chongqing Intercity Railway 成渝客运专线 | |
---|---|
Overview | |
Status | Operating |
Locale | People's Republic of China |
Termini | |
Stations | 12 |
Service | |
Type | High-speed rail |
Train number(s) | G8xxx |
Operator(s) | China Railway High-speed |
Rolling stock | China Railways CRH380D |
History | |
Opened | December 26, 2015 |
Technical | |
Line length | 307 km (191 mi) 307 km (191 mi) (main line) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 300 km/h (186 mph) |
Chengdu–Chongqing Intercity Railway | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 成渝客运专线 | ||||||
Traditional Chinese | 成渝客運專線 | ||||||
|
Template:BS-header Template:BS-table Template:BS Template:BS Template:BS3 Template:BS Template:BS5 Template:BS Template:BS Template:BS3 Template:BS Template:BS Template:BS Template:BS Template:BS Template:BS Template:BS Template:BS Template:BS3 Template:BS5 Template:BS3 Template:BS3 Template:BS3 Template:BS3
Technical | |
---|---|
Line length | 307 km (191 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 300 km/h (186 mph) max. |
|}
The Chengdu–Chongqing Intercity Railway (simplified Chinese: 成渝客运专线; traditional Chinese: 成渝客運專線) is a 307-kilometre (191 mi) long high-speed railway that connects the cities of Chengdu (Sichuan) and Chongqing in southwestern China, with a maximum speed of 350 km/h. The route passes through most of the same cities that the older Chengdu–Chongqing Railway does, but is significantly shorter due to the greater use of elevated sections and tunnels. It reduces travel time between Chengdu and Chongqing to 75 minutes, 45 minutes quicker than the current CRH route via Suining. The line includes four major elevated sections and two tunnels.[1]
Construction on the Chongqing section began on 22 March 2010 while work on the Sichuan section began on 11 November. The final tunnel achieved breakthrough on 16 December 2013 and a single track line was expected to open in first half of 2014. The complete double track configuration was due to be completed by the end of 2014.[2] The line started operation on 26 December 2015, initially to Chongqing North until renovations are complete at Shapingba in 2016.
Railway stations
There are 12 stations along the line:
Sichuan section
- Chengdu East Railway Station
- Jianyang South Railway Station
- Ziyang North Railway Station
- Zizhong North Railway Station
- Neijiang North Railway Station
- Longchang North Railway Station
Chongqing section
- Rongchang North Railway Station
- Dazu Railway Station
- Yongchuan East Railway Station
- Bishan Railway Station
- Shapingba Railway Station
- Chongqing Railway Station
References