Jump to content

Fremantle line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by DePiep (talk | contribs) at 17:19, 20 April 2016 (Template:Infobox rail line: fix bad parameters, use alt parameters (via AWB script)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Fremantle railway line
Overview
OwnerPublic Transport Authority: Perth-South Beach
Brookfield Rail: South Beach-Cockburn Junction
Termini
Continues fromMidland line
Continues asSpearwood-Armadale line
Stations17
Service
Operator(s)Transperth
Ridership8.2 million (year to June 2015)
History
Opened1 March 1881
Technical
Track gauge1,067 mm (3 ft 6 in)
1,435 mm (4 ft 8+12 in)
ElectrificationOverhead 25 kv AC
Route map
Fremantle line
km
continues to Midland line
0.0
Perth Bus transfer Transwa Free Transit Zone
00.0
00.0
 
00.0
James Street bus bridge
West Perth
West Perth Subway
1.6
City West Free Transit Zone
Leederville Cutting
Hamilton Street bridge
2.7
West Leederville
West Leederville football platform
00.0
00.0
Haydn Bunton Drive
Subi Centro tunnel
3.7
Subiaco Bus transfer
5.0
Daglish
Daglish turnback
Nicholson Road
5.9
Shenton Park Bus transfer CircleRoute
Shenton Park Busway
Nagal Pass
7.4
Karrakatta
8.0
Loch Street
Old Showgrounds station
Ashton Avenue
8.6
Showgrounds Special event station
00.0
Shenton Road subway
9.3
Claremont Bus transfer CircleRoute
Butlers Siding
Claremont turnback 1
Stirling Road subway
Claremont turnback 2
10.4
Swanbourne
Congdon Bridge
11.1
Grant Street
Eric Street
12.4
Cottesloe Bus transfer
Jarrad Street
Salvado Street
13.5
Mosman Park
Victoria Street
14.2
Victoria Street
00.0
Leighton freight siding
00.0
Leighton freight siding
Leighton
Rocky Bay line
16.2
North Fremantle
00.0
North Fremantle
(original)
Tydeman Road Bridge
North Quay rail loop
00.0
Freight diversion
Peter Hughes Drive
East Fremantle
18.7
Fremantle Bus transfer CircleRoute
00.0
continues to Kwinana railway
00.0
Fremantle
(original)
Warden Lane
19.8
The Esplanade
Mews Road
Capo d'Orlando Drive
20.9
Success Harbour
Success Harbour crossing
Ocean Road
22.0
South Beach
Rollinson Road
24.0
Robbs Jetty
McTaggart Cove
Hamilton Road
25.5
Spearwood
Stock Road
Spearwood Avenue
Beeliar Drive
Russell Road
Wattleup Road
Hope Valley Road
Australian national route 1.svg
National Route 1
Rockingham Road
00.0
Alcoa spur
26.6
Coogee
Clarence
Alcoa spur
Hogg Road
Weston Street
Beard Street
Kwinana Industrial Sidings
Australian national route 1.svg
National Route 1
Rockingham Road
37.7
Kwinana
Railways in Perth
Airport
Armadale
Fremantle
Mandurah
Midland
Thornlie
Yanchep
List of Transperth stations

The Fremantle railway line is a suburban railway line in Western Australia that connects the state capital of Perth with the port city of Fremantle.

History

The line opened on 1 March 1881 as the first suburban railway line in Perth by William C. F. Robinson.[1] It originally operated as the Eastern Railway and ran between Fremantle and Guildford, via central Perth. In March 1884, the line was extended via Midland Junction to Bellevue[2][3] and later to Clackline, York and Northam. The line opened as a single track with a passing loop at Claremont, it was duplicated in 1896/97. A dedicated freight line was later added on the western side between Cottesloe and the Leighton Marshalling Yard.[4]

On 22 October 1898, the line was extended south to Robbs Jetty, on 1 July 1903 via Cockburn to Coogee and on 19 December 1955 via Woodman Point to Kwinana[5][6] The Coogee to Woodman Point section closed on 16 September 1973, followed by Robbs Jetty to Coogee in February 1986.[3][7]

In July 1926, the Fremantle Railway Bridge over the Swan River was partly washed away in a flood, with one line restored in October 1926 and the second in April 1928.[4]

In the 1960s, as part of the standard gauge project, the section south of Cockburn was replaced by the Kwinana line on a different alignment.[8] One of the lines north of Cockburn to the container terminal at North Quay and Leighton Marshalling Yard was converted to standard gauge. The Fremantle Railway Bridge was converted to dual gauge.[4][9] A marshalling yard was built at Robbs Jetty.

In 1966, the eastern railway metropolitan passenger services were curtailed to terminate at Midland.

Plaque commemorating the closure of the Fremantle line at Perth station in 1979

Passenger services on the Fremantle line were suspended on 1 September 1979. The decision was based on three one day counts in 1971, 1975 and 1977. Despite a petition signed by 110,000 people the government was not persuaded to change its mind. The service was reinstated on 29 July 1983 following a change of government.[1][4][10][11]

For the staging of the 1987 America's Cup, stations south of Fremantle were erected for use by special trains at The Esplanade, Success Harbour and South Beach. The Hotham Valley Railway operated a daily service on this section of the line with a W class steam locomotive as the Spinnaker Run between October 1986 and February 1987.[12] None have been used since. The narrow and standard gauge lines were rebuilt as a single dual gauge line at the same time.

During 1990, work commenced on building a new North Fremantle station, 800 metres north of its original location, which opened for service on 28 July 1991. Leighton station, which was 700 metres further north, was demolished during the electrification of the line. Regular electric services started in September 1991.[1][13] Today there are 17 stations on the line.[14]

As part of the Subi Centro project, 900 metres of the line and Subiaco station were sunk in 1998.[15] Between 2011 and 2014, the Fremantle line was sunk between Lake Street and the Horseshoe Bridge in the Perth CBD to allow for the redevelopment of the area.[16] Perth station's former Fremantle to Midland platform became an island platform, with an additional platform and track built on the north side. Platforms west of the Horseshoe Bridge were demolished.[16] In June 2011 a $237 million cost blow-out was revealed, added to a 2009 project estimate of $500 million.[17][18]

The new tunnel is the first in Western Australia to use a rigid overhead conductor rail instead of overhead wires, the same system as used on the Madrid Metro. With overhead wires, the clearance between the new tunnel and the existing Joondalup line tunnel is only 75 cm. By using a conductor rail, the new tunnel could be built to a smaller diameter, allowing for an increased clearance between the two.[19] The new tunnel opened on 18 July 2013.[20]

With the privatisation of Westrail in 2000, responsibility for the Perth to South Beach section has passed to the Public Transport Authority and the South Beach to Cockburn Junction section to Brookfield Rail, although operational responsibility for the standard gauge line is with Brookfield.[21][22][23]

Services

Dual gauge track at South Beach station in February 2006

Transperth operate services on the line from Fremantle through the Perth CBD to Midland on the Midland line.[24][25] Freight services operate from Kewdale and Forrestfield to North Quay. Until July 2015 these were operated by Aurizon when SCT Logistics took over.[26][27]

Rolling stock

Until the ADG class railcars entered service in 1953, services on the Fremantle line were operated by steam locomotives. Some peak-hour services continued to be steam hauled until the arrival of the ADK/ADB class diesel multiple units in 1968 resulted in the end of steam haulage. When the line was electrified in 1991, A-series electric multiple units took over.

Patronage

Below is the annual patronage of Fremantle railway line from 2010–2011 financial year. Figures are provided as total boardings, which includes all fare-paying boardings and free travel on stations within the free transit zones as well as transfers between stations. The figures for rail replacement and special events services are not included in the total.[28]

Fremantle line annual patronage
Year Patronage ±%
2010–11 8,198,224
2011–12 8,679,139 +5.87%
2012–13 8,866,211 +2.16%
2013–14 8,284,716 −6.56%
2014–15 8,228,255 −0.68%
2015–16 {{{2015}}} NA
2016–17 {{{2016}}} NA
2017–18 {{{2017}}} NA
2018–19 {{{2018}}} NA
2019–20 {{{2019}}} NA
2020–21 {{{2020}}} NA
2021–22 {{{2021}}} NA
2022–23 {{{2022}}} NA
2023–24 {{{2023}}} NA

The Fremantle line featured in the 2006 film Last Train to Freo.

Stations

During peak periods, trains omit some stops.

Fremantle Line
Name of station Code Zone Serving suburbs Pattern stops at this station Connections
All A B D↓ D↑ S
Perth MPH 1 / Free Transit Zone Perth, Northbridge Template:TP stop Template:TP stop Template:TP stop Template:TP stop Template:TP stop Template:TP stop Through to Midland line
Platform transfer to Armadale, Thornlie,
Joondalup & Mandurah lines
Australind service to Bunbury
Bus transfers at Roe Street bus station
City West FCW 1 / Free Transit Zone West Perth Template:TP stop Template:TP stop Template:TP stop Template:TP stop Template:TP stop Template:TP stop
West Leederville FWL 1 West Leederville, Subiaco Template:TP stop | Template:TP stop Template:TP stop Template:TP stop | |
Subiaco FSO 1 Subiaco, Wembley Template:TP stop Template:TP stop Template:TP stop Template:TP stop Template:TP stop Template:TP stop Bus transfers
Daglish FDH 1 Daglish, Jolimont Template:TP stop | Template:TP stop Template:TP stop Template:TP stop | |
Shenton Park FSP 1 Shenton Park Template:TP stop | Template:TP stop Template:TP stop Template:TP stop Template:TP stop CircleRoute
Karrakatta FKA 1 Karrakatta, Mount Claremont Template:TP stop | Template:TP stop Template:TP stop |
Loch Street FLS 1 Karrakatta Template:TP stop | Template:TP stop Template:TP stop |
Showgrounds FSG 1 Claremont Showgrounds Special events only
Claremont FCT 1 Claremont Template:TP stop Template:TP stop Template:TP stop Template:TP stop Bus transfers
Swanbourne FSE 2 Swanbourne, Claremont Template:TP stop Template:TP stop | Template:TP stop
Grant Street FGS 2 Cottesloe, Swanbourne Template:TP stop Template:TP stop | Template:TP stop
Cottesloe FCE 2 Cottesloe, Peppermint Grove Template:TP stop Template:TP stop | Template:TP stop Bus transfers
Mosman Park FMP 2 Mosman Park, Cottesloe Template:TP stop Template:TP stop | Template:TP stop
Victoria Street FVS 2 Mosman Park, Cottesloe Template:TP stop Template:TP stop | Template:TP stop
North Fremantle FNF 2 North Fremantle Template:TP stop Template:TP stop | Template:TP stop
Fremantle FFE 2 Fremantle Template:TP stop Template:TP stop Template:TP stop Template:TP stop Bus transfers, CircleRoute

Old stopping patterns

School special services

References

  1. ^ a b c Our History Public Transport Authority
  2. ^ Legislative Council - The Governor's Speech The West Australian 12 July 1884 page 3
  3. ^ a b Quinlan, Howard; Newland, John (2000). Australian Railway Routes 1854 - 2000. Redfern: Australian Railway Historical Society. p. 64. ISBN 0 909650 49 7.
  4. ^ a b c d Minchin, RS; Higham, GJ (1981). Robb's Railway Fremantle to Guildford Railway Centenary. Bassendean: Australian Railway Historical Society. pp. 11, 19, 24, 37, 38, 48. ISBN 0 9599690 2 0.
  5. ^ Robb's Jetty-Woodman's Point Railway Act 1902 Parliament of Western Australia
  6. ^ Coogee-Kwinana Railway Act 1952 Parliament of Western Australia
  7. ^ Railway (Coogee-Kwinana Railway) Discontinuance Act 1973 Parliament of Western Australia
  8. ^ Kwinana-Mundijong-Jarrahdale Railway Act 1961 Parliament of Western Australia
  9. ^ Nomination of Western Australian Standard Gauge Railway for an Engineering Heritage Australia Heritage Recognition Award Engineers Australia September 2011 pages 10, 15
  10. ^ A History of the Town of Cottesloe Town of Cottesloe
  11. ^ A Guide to the 1983 State Cabinet Records State Records Office of Western Australia page 13
  12. ^ A Desciptive History of Hotham Valley Tourist Railway Hotham Valley Railway
  13. ^ "Occasional Notes". The West Australian. 21 October 1881. p. 2. Retrieved 10 March 2014.
  14. ^ History of Stations on the Fremantle Line Right Track
  15. ^ Official opening of the Subiaco rail tunnel and station Government of Western Australia 12 December 1998
  16. ^ a b "Perth City Link Rail Master Plan - Lowering of the Fremantle Railway in Perth". Public Transport Authority of Western Australia. 30 March 2010. Retrieved 26 April 2011.
  17. ^ Prior, Neale (2 June 2011). "City Link in $237m cost blowout". The West Australian. Retrieved 22 June 2011.
  18. ^ "1ha town square to be built on land when Perth rail goes underground". PerthNow (Sunday Times). 29 November 2011. Retrieved 22 June 2011.
  19. ^ "WA rail technology first". Public Transport Authority of Western Australia. 6 August 2012. Retrieved 31 August 2012.
  20. ^ Federal Transport Minister Anthony Albanese highlights urban rail as key election issue ABC News 18 July 2013
  21. ^ Network Map Brookfield Rail
  22. ^ Scope of the Network Rules Public Transport Authority
  23. ^ Trackwork resleepering Public Transport Authority
  24. ^ Fremantle Line Timetable Transperth 18 July 2013
  25. ^ Midland Line Timetable Transperth 18 July 2013
  26. ^ Trainline 2 Statistical Report Bureau of Infrastructure Transport & Regional Economics 2014 page 39
  27. ^ SCT WA picks up new business with Fremantle Port Rail Service SCT Logistics August 2015
  28. ^ "Transperth patronage". Public Transport Authority. Retrieved 27 September 2014.