Jump to content

King Mountain Wind Farm

Coordinates: 31°14′16″N 102°14′17″W / 31.2378°N 102.238°W / 31.2378; -102.238
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Rehman (talk | contribs) at 10:35, 17 April 2016 (suffix). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

King Mountain Wind Farm
Map
CountryUnited States
LocationUpton County, Texas
Coordinates31°14′16″N 102°14′17″W / 31.2378°N 102.238°W / 31.2378; -102.238
OwnerFPL Energy
Wind farm
TypeOnshore
Power generation
Units operational214
Make and modelSiemens Wind Power
Nameplate capacity278.2 MW
Annual net output750 GWh

The King Mountain Wind Farm is a 278.2  megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 750 GW·h.[1] The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).

Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.[1]

See also

References