Lianggang Express line

From Wikipedia, the free encyclopedia
Lianggang Express Line (两港快线)
Overview
Other name(s)Nanhui Branch Line (南汇支线) and Free Trade Zone Express Line
StatusUnder construction
LocalePudong, Shanghai, China
Termini
Connecting lines 2   21   Maglev   Airport Link 
Stations6
Service
TypeRegional Rail
SystemShanghai Suburban Railway
Operator(s)Shentong Metro Group
Depot(s)Xiayan Road Depot
Rolling stock4 car/8 car Class C (Express train) trains
History
CommencedJanuary 4, 2022; 2 years ago (2022-01-04)
Planned openingDecember 31, 2025; 21 months' time (2025-12-31)
Technical
Line lengthMain line: 26.3 km (16 mi)
Branch line: 8.8 km (5 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (AC 25 kV)
Operating speed160 km/h (99 mph)

Lianggang Express Line (Chinese: 两港快线; pinyin: Liǎng gǎng kuài xiàn) is a commuter rail line currently under planning on the Shanghai Suburban Railway, and will be run by Shentong Metro Group. The Lianggang Express Line is an express suburban railway between the Lingang New Area and Pudong Hub, Hongqiao Hub and Shanghai's main urban area.[1] The plan published public review between April 29th to May 28th by the Shanghai Transportation Commission. The special plan (draft) was for the selection of the Lianggang Express Line (Pudong Hub-Lingang Industrial Park Station).

It runs from Lingang Industrial Park in Pudong to Shanghai East railway station (mainline) or Pudong International Airport T3 Terminal (branch) in Pudong. The 26.3-kilometer (16.3 mi) express line with 8.8 km (5.5 mi) branch is expected to shorten the travel time between Lingang and Pudong International Airport to under 15 minutes upon completion in 2025. Construction is started in 2022. The line is expected to open at the end of 2025. It will achieve one-hour access to important external transportation hubs for Lingang.

Urban transit operation is adopted with operations similar rapid transit, and passengers can use the Shanghai public transport card to enter and exit the station.[2] The line will use Class C (Express train) stocks with a maximum operating speed of 160 km/h (99 mph). The route from Pudong International Airport T3 terminal heads south along Lianggang Avenue, turns east at Dongda Highway, turns south at Qiaojiang Road, and enters the central activity area of Lingang New Area; the other line leads from Shanghai East Railway Station, and connect to Xiayan Road Station along the south side of Shenjiahu Expressway. Most of the route will be elevated.[3]

History[edit]

In 2016, the Nanhui branch line was included in the plan in the Shanghai 2035 general plan. In November 2019, Zhu Zhisong, Deputy Secretary-General of the Shanghai Municipal Government and Executive Deputy Director of the Management Committee of the Lingang New Area of the Pilot Free Trade Zone, revealed that the Lingang New Area is to be connected to urban Shanghai via Pudong International Airport, Hongqiao International Airport, Shanghai South railway station, as part of a express railway network. The "Pudong Comprehensive Transportation Hub Special Plan" announced in February 2020 mentioned the Lianggang Express Line. The "Three-year Action Plan for Traffic Improvement in the Lingang New Area of China (Shanghai) Pilot Free Trade Zone (2020-2022)" published in March 2020 proposes to accelerate the implementation of the Lianggang Express Line before 2022. In April 2020, the "Higher Quality Integrated Development Plan for Transportation in the Yangtze River Delta" proposed "Planning and Construction of Shanghai Nanhui Branch Line". The development plan will last until 2025 and look forward to 2035. In June 2020, the China Railway Design Corporation began to conduct a feasibility study. The preliminary acceptance test will be completed in September 2020. From April 29th to May 28th, 2021, the Municipal Transportation Commission publicized the special plan (draft) for the selection of the Shanghai Lianggang Express Line (Pudong Hub ~ Lingang Industrial Park Station).

Proposed stations[edit]

Service routes[edit]

Routes Station name Connections Distance
km
Location
M B English Chinese
Mainline
Lingang Industrial Park 临港开放区 0 0 Pudong
Lingang Mix-used Area 临港综合区 3.470 3.470
Dongda Highway 东大公路 4.430 7.900
Xiayan Road 下盐路 15.783 23.683
| Shanghai East railway station 上海东站  21  (planned)  Airport Link   East West Link  (planned) Shanghai East railway station (u/c) 6.967 30.650
Branchline
| Pudong International Airport T3 浦东国际机场T3  2   21  (planned)  Maglev  (planned) Shanghai Pudong Airport APM  Airport Link  3.653 27.336
↓ Through-service to/from Hongqiao Railway Station via the  Airport Link 

Future extensions[edit]

Future extension to Situan is under further planning.[4]

References[edit]

  1. ^ 上海市市域线两港快线(浦东枢纽-临港开放区站)选线专项规划(草案公示) (PDF) (in Simplified Chinese). Archived from the original on 2021-04-29. Retrieved 2021-04-29.
  2. ^ "The underground high-speed railway from Pudong Airport to Hongqiao Airport starts". Seetao. 2020-11-20.
  3. ^ "上海两港快线选线专项规划发布:浦东枢纽至临港设6座车站" (in Chinese). Sina. 2021-04-30.
  4. ^ "今年将启动两港快线建设,未来临港新片区抵达浦东机场仅需15分钟!" (in Chinese). Thoughtful Shanghai. 2021-01-25.

Notes[edit]