Line 5, Guangzhou Metro

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Line 5, Guangzhou Metro
GZM Line 5 icon.svg
獵德站.jpg
Platform of Liede Station
Overview
Type Rapid transit
System Guangzhou Metro
Status Operational
Locale Guangzhou, China
Termini Jiaokou
Wenchong
Stations 24
Services 1
Daily ridership 1.335 million (2015 Peak)[1]
Operation
Opened 28 December 2009
Owner City of Guangzhou
Operator(s) Guangzhou Metro Corporation
Character Underground and Elevated
Technical
Line length 31.9 km (19.82 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 1,500 V DC
Route map
GZM Line 5.png
Huangniubu
Huangjiang North
Shidi Park
Dalang
Dalang West
Shongshan Lake Dongguan Rail Transit  3 
Dalingshan East
Dalingshan
Dalingshan North
Shuidushan
Dongcheng South
Xinyuan South
Hongfu Road Dongguan Rail Transit  2 
Guantai Road
Binjiang Sports Center
Dongguan Waterway
Coach Terminal Station
Renmin Hospital
Daojiao East
Daojiao
Daojiao Depot
Chijiaokou River
Wanghong
Mayong East
Mayong West
Dong River
Huangpu Ferry Terminal
Lujiao Stream
Huangpu Industrial Zone
Xiayuan  13 
Xiangjingling
Longtoushan
Shuanggang
Wenchong
Dashadong  7 
 Guangzhou S 
Dashadi
Huangpu Railway
Yuzhu  13 
Huanggang
Yuzhu Depot
Sanxi
Dongpu
Connection with Line 4
Chebeinan  4 
 Huangcun – Jinzhou 
Keyun Lu
Yuancun
Tancun
Liede
Zhujiang New Town  3 
 Tianhe Coach Terminal – Panyu Square 
Wuyangcun
Yangji Stream
Yangji  1 
 Guangzhou E – Xilang 
Zoo
Ouzhuang  6 
 Changban – Xunfenggang 
Taojin
 Guangshen Railway 
Xiaobei
Guangzhou Railway Station  2 
 Jiahewanggang – Guangzhou S 
 11 
 Jingguang Railway 
Xicun  8 
 Baiyun Lake – Wanshengwei 
Xichang
Sima Stream
Zhongshanba  11 
Pearl River
Tanwei  6 
 Xunfenggang – Changban 
Connection with Line 6
Pearl River
Jiaokou
 Guangmao Railway 

Line 5 of the Guangzhou Metro (Chinese: 广州地铁5号线; pinyin: Guǎngzhōu Dìtiě Wǔ Hào Xiàn) or Huanshilu Line (Chinese: 环市路线; pinyin: Huánshìlù Xiàn) runs from Liwan District to Huangpu District. It starts at Jiaokou and ends at Wenchong. The total length is 31.9 km. Line 5's color is red. Huangpu Line began operation on December 28, 2009, from Jiaokou to Wenchong.

Stations[edit]

Station Name
English
Station Name
Hanzi
Platform Types
Transfer/Connection
Location
Jiaokou 滘口 island (elev) Liwan
Tanwei 坦尾 island (elev)  6 
Zhongshanba 中山八 island (und)
Xichang 西场 side (und)
Xicun 西村 side (und)
Guangzhou Railway 广州火车站 side (und)  2 
Mainline rail interchange China Railway China Railway High-speed via Guangzhou
Yuexiu
Xiaobei 小北 side (und)
Taojin 淘金 island (und)
Ouzhuang 区庄 side (und)  6 
Zoo 动物园 split (und)
Yangji 杨箕 island (und)  1 
Wuyangcun 五羊邨 island (und)
Zhujiang New Town 珠江新城 side (und)  3   Zhujiang APM  Tianhe
Liede 猎德 island (und)
Tancun 潭村 island (und)
Yuancun 员村 island (und)
Keyun Lu 科韵路 island (und)
Chebeinan 车陂南 island (und)  4 
Dongpu 东圃 island (und)
Sanxi 三溪 island (und)
Yuzhu 鱼珠 island (und) Huangpu
Dashadi 大沙地 island (und)
Dashadong 大沙东 island (und)
Wenchong 文沖 island (und)

References[edit]