Jump to content

Mauda Super Thermal Power Station

Coordinates: 21°11′N 79°24′E / 21.18°N 79.4°E / 21.18; 79.4
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Rehman (talk | contribs) at 11:39, 17 April 2016 (MW). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Mauda Super Thermal Power Station
Map
Location of the Mauda Super Thermal Power Station in Maharashtra, India
CountryIndia
LocationNagpur Maharashtra
Coordinates21°11′N 79°24′E / 21.18°N 79.4°E / 21.18; 79.4
StatusOprational
Construction began2009
Commission dateStage 1 on march 2013 and stage 2 is under erection
OwnerNTPC
Thermal power station
Primary fuelCoal
Power generation
Units operational2 X 500. Under construction 2 X 660 MW
Make and modelBHEL
Nameplate capacity2,320 MW

Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on August 21, 2014.[1]

Bharat Heavy Electricals Limited (BHEL) is the EPC contractor (EPCC) for the power project.[2][3]

Capacity

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
1st 1 500 2013 March Running [4]
2 500 2013 April Running [5]
2nd 3 660 2016 March Running [6]
4 660 Under construction
Total Four 2320

References

  1. ^ "PM at Mouda, Maharashtra | Prime Minister of India". Pmindia.gov.in. 2014-08-21. Retrieved 2015-03-30.
  2. ^ "BHEL commissions first super critical thermal unit". Thehindu.com. 2013-12-01. Retrieved 2015-03-30.
  3. ^ "Alstom wins contract with BHEL for 2x660 MW supercritical boilers project in India". Alstom.com. Retrieved 2015-03-30.
  4. ^ "NTPCs unit I of Mauda Super Thermal Power Station with 500 MW capacity starts operation". Moneycontrol.com. Retrieved 2015-03-30.
  5. ^ NTPC commissions Unit-II of 500 MW of Mouda super thermal power project. Moneycontrol.com (April 01, 2013). Retrieved August 21, 2014.
  6. ^ http://www.moneycontrol.com/news/business/ntpc-commissions-unit-3660-mw-at-mouda-stps_6036681.html