Network Rail Control Periods are the 5-year timespans into which Network Rail, the owner and operator of most of the rail infrastructure in Great Britain, works for financial and other planning purposes. Each Control Period begins on 1 April and ends on 31 March to coincide with the financial year. These periods were inherited from Railtrack, so that the earlier ones are retrospective, and not necessarily of 5 years duration.

As Network Rail is responsible for developing and maintaining railway infrastructure, the Control Periods are used to decide priorities for investment. Infrastructure developments have taken place or are planned as follows:

Control Period 1 (CP1): 1996-2001

Control Period 2 (CP2): 2001-2004

Control Period 3 (CP3): 2004–2009

CP3 included the following work:[1]

  • Additional express services from Edinburgh to Aberdeen
  • Improved interchange at Gourock

Control Period 4 (CP4): 2009–2014

CP4 included the following work as part of the Enhancements Programme:

Control Period 5 (CP5): 2014-2019

CP5 includes:[2]

CP5 is running over budget and some projects are to be delayed. In July 2015, Sir Peter Hendy was appointed Chairman of Network Rail "and asked by the Secretary of State to conduct a thorough review of the enhancement programme in England & Wales to see what can be delivered in an affordable and timely way within the funding period to 2019".[4] (Table 37 of the report lists the revised work programme for CP5). Additionally, Dame Colette Bowe will investigate how future investment programmes could be implemented better.[5]

Control Period 6 (CP6): 2019-2024

No plans for the Control Period 6 have yet[when?] been made, other than those works that were originally slated for CP5 that the Hendy Review (p37) announced are to be slipped to CP6.[4] The Periodic Review 2018 (PR18) will establish outputs and funding for Control Period 6.[6]

In June 2017, the DfT will publish the High Level Output Specification (HLOS), an overview of the improvements they want to be delivered in CP6 and the funds available to carry out those improvements. In October 2018, the ORR will make the final determination of the funding arrangements available.[7]

The HLOS for Control Period 6 was published on 20 July 2017.[8] [9]

Control Period 7 (CP7): 2024-2029

No plans for the Control Period 7 have yet[when?] been made.

Control Period 8 (CP8): 2029-2034

No plans for the Control Period 8 have yet[when?] been made.

References

  1. ^ "Scottish Ministers' High Level Output Specification" (PDF). Transport Scotland. July 2007. Retrieved 5 December 2012.
  2. ^ "PR13 Initial Industry Plan Supporting Document: Definition of proposed CP5 enhancements" (PDF). Network Rail. September 2011. Retrieved 5 December 2012.
  3. ^ "Bromsgrove Railway Station". Worcestershire County Council.
  4. ^ a b "Report from Sir Peter Hendy to the Secretary of State for Transport on the replanning of Network Rail's Investment Programme" (PDF). Network Rail. 25 November 2015.
  5. ^ Briginshaw, David (25 June 2015). "New Network Rail chairman to review troubled investment plan". International Railway Journal.
  6. ^ "Periodic Review 2018 (PR18)". Network Rail. Archived from the original on 2015-09-12. {{cite web}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  7. ^ "A Short Guide to Network Rail" (PDF).
  8. ^ http://www.railwaygazette.com/news/infrastructure/single-view/view/high-level-output-specification-for-control-period-6-published.html
  9. ^ https://www.gov.uk/government/publications/high-level-output-specification-2017