Red Line (Lucknow Metro)
Appearance
North-South Corridor | |
---|---|
Overview | |
Locale | Lucknow |
Termini | |
Stations | 22 |
Service | |
Type | Rapid transit |
System | Lucknow Metro |
Operator(s) | Lucknow Metro Rail Corporation |
Technical | |
Line length | 22.878 km |
Character | Underground, Elevated |
Track gauge | Indian gauge |
The North-South Corridor of the Lucknow Metro is an under construction metro route of mass rapid transit system in Lucknow. It consists of 22 metro stations from CCS International Airport to Munshi Pulia with a total distance of 25.15 km. Most of the line is elevated.[1][2][3]
List of stations
Following is a list of stations on this route[4][5]
colspan="7" style="background:#Template:Lucknow Metro color;"| North-South Corridor Line | ||||||
---|---|---|---|---|---|---|
# | Station Name | Opening | Connections | Layout | ||
English | Hindi | Urdu | ||||
1 | Chaudhary Charan Singh International Airport | चौधरी चरण सिंह अंतरराष्ट्रीय हवाई अड्डा | چودھری چران سینگھ بین الاقوامی ہوائی اڈے | Under Construction | None | Elevated |
2 | Amausi | अमौसी | اموسی | Under Construction | None | Elevated |
3 | Transport Nagar | ट्रांसपोर्ट नगर | ٹرانسپورٹ نگار | Under Construction | None | Elevated |
4 | Krishna Nagar | कृष्णा नगर | کرشنا نگار | Under Construction | None | Elevated |
5 | Shringar Nagar | श्रृंगार नगर | شرینگار نگار | Under Construction | None | Elevated |
6 | Alam bagh | आलम बाग़ | الم باغ | Under Construction | None | Elevated |
7 | Alambagh ISBT | आलम बाग अंतरराज्यीय बस टर्मिनल | الامبغ انٹر اسٹیٹ بس ٹرمنل | Under Construction | None | Elevated |
8 | Mawaiya | मवईया | مویا | Under Construction | None | Elevated |
9 | Durga puri | दुर्गा पुरी | درگا پوری | Under Construction | None | Elevated |
10 | Charbagh Railway Station | चारबाग़ रेलवे स्टेशन | چارباغ ریلوے سٹیشن | Under Construction | East-West Corridor | Elevated |
11 | Hussain ganj | हुसैन गंज | حسین گنج | Under Construction | None | Underground |
12 | State Secretariat | सचिवालय | سیکرٹریٹ | Under Construction | None | Underground |
13 | Hazratganj | हज़रत गंज | حضرتگنج | Under Construction | None | Underground |
14 | KD Singh Babu Stadium | केडी सिंह बाबू स्टेडियम | کے دی سنگھ بابو اسٹیڈیم | Under Construction | None | Underground |
15 | Lucknow University | लखनऊ विश्वविद्यालय | لکھنؤ یونیورسٹی | Under Construction | None | Elevated |
16 | IT College Junction | आईटी कॉलेज जंक्शन | ای ٹی کالج جنکشن | Under Construction | None | Elevated |
17 | Mahanagar | महा नगर | مہانگر | Under Construction | None | Elevated |
18 | Badshahnagar | बादशाह नगर | بادشاہنگر | Under Construction | None | Elevated |
19 | Lekhraj | लेखराज | لیخراج | Under Construction | None | Elevated |
20 | Ramsagar Mishra Nagar | राम सागर मिश्रा नगर | رامساگر میشرا نگر | Under Construction | None | Elevated |
21 | Indira Nagar | इंदिरा नगर | اندرا نگر | Under Construction | None | Elevated |
22 | Munshi Pulia | मुंशी पुलिया | منشی پلہ | Under Construction | None | Elevated |
References
- ^ http://awas.up.nic.in/Lucknow%20DPR%20Oct%202013_Final.pdf
- ^ http://timesofindia.indiatimes.com/City/Lucknow/Metro-construction-first-leg-from-September/articleshow/35691533.cms
- ^ http://articles.timesofindia.indiatimes.com/2009-02-06/lucknow/28015488_1_project-report-civic-amenities-delhi-metro-rail-corporation
- ^ http://awas.up.nic.in/Lucknow%20DPR%20Oct%202013_Final.pdf
- ^ http://www.indianexpress.com/news/Lucknow-Metro-gets-a-blueprint-from-Delhi/611040