Jump to content

PATH400

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Keizers (talk | contribs) at 04:52, 21 August 2014 (Created page with 'The '''PATH400''' Greenway Trail is a multi-use trail under construction<ref>[http://patch.com/georgia/buckhead/first-phase-of-path400-to-break-ground-feb-17#.U_...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

The PATH400 Greenway Trail is a multi-use trail under construction[1] along the Georgia 400 tollway in Buckhead, Atlanta.

PATH400 will be ca. 5 miles (8.0 km) long, extending from Loridans Drive south to the Atlanta BeltLine’s Peachtree Creek spur trail. The trail will be 10 feet (3.0 m) to 14 feet (4.3 m) wide and traverse the neighborhoods of North Buckhead, Peachtree Park and Lindmont LaVista. It is intended to be the "spine of Buckhead’s Trails and Greenways Subsystem, part of the Buckhead Collection, connecting parks, trails, schools and neighborhoods to the urban core of Buckhead and ultimately to the Atlanta BeltLine." The PATH400 Trail is a partnership between Buckhead CID, Livable Buckhead and the PATH Foundation, and is estimated to cost $10 million.[2][3]

References