Queen Elizabeth Way

Route map:
From Wikipedia, the free encyclopedia
(Redirected from QEW)

Queen Elizabeth Way marker

Queen Elizabeth Way

Map
Queen Elizabeth Way highlighted in red
Route information
Maintained by the Ministry of Transportation of Ontario
Length139.1 km[1] (86.4 mi)
HistoryBuilt: 1931 – October 14, 1956
Major junctions
Fort Erie endPeace Bridge to I-190 at the Canada–United States border in Fort Erie
Major intersections
Toronto end Highway 427 / Gardiner Expressway in Toronto
Location
CountryCanada
ProvinceOntario
Highway system
Highway 427 Highway 502
Former provincial highways
Highway 500  →

The Queen Elizabeth Way (QEW) is a 400-series highway in the Canadian province of Ontario linking Toronto with the Niagara Peninsula and Buffalo, New York. The freeway begins at the Peace Bridge in Fort Erie and travels 139.1 kilometres (86.4 mi) around the western end of Lake Ontario, ending at Highway 427 as the physical highway continues as the Gardiner Expressway into downtown Toronto. The QEW is one of Ontario's busiest highways, with an average of close to 200,000 vehicles per day on some sections. Major highway junctions are at Highway 420 in Niagara Falls, Highway 405 in Niagara-on-the-Lake, Highway 406 in St. Catharines, the Red Hill Valley Parkway in Hamilton, Highway 403 and Highway 407 in Burlington, Highway 403 at the OakvilleMississauga boundary, and Highway 427 in Etobicoke. Within the Regional Municipality of Halton the QEW is signed concurrently with Highway 403. The speed limit is 100 km/h (62 mph) throughout most of its length, with the exceptions being between Hamilton and St. Catharines where the posted limit is 110 km/h (68 mph).

The history of the QEW dates back to 1931, when work began to widen the Middle Road in a similar fashion to the nearby Dundas Highway and Lakeshore Road as a relief project during the Great Depression. Following the 1934 provincial election, Ontario Minister of Highways Thomas McQuesten and his deputy minister Robert Melville Smith changed the design to be similar to the autobahns of Germany, dividing the opposite directions of travel and using grade-separated interchanges at major crossroads. When opened to traffic in 1937, it was the first intercity divided highway in North America and featured the longest stretch of consistent illumination in the world. While not a true freeway at the time, it was gradually upgraded, widened, and modernized beginning in the 1950s, more or less taking on its current form by 1975. Since then, various projects have continued to widen the route. In 1997, the provincial government turned over the responsibility for the section of the QEW between Highway 427 and the Humber River to the City of Toronto, who redesignated this segment as a westward extension of the Gardiner Expressway.

Name and signage[edit]

Original Queen Elizabeth Way signage, 1940

The Queen Elizabeth Way was named for the wife and royal consort of King George VI who would later become known as Queen Elizabeth The Queen Mother. It is sometimes referred to as the Queen E.[2] In 1939, the royal couple toured Canada and the United States in part to bolster support for the United Kingdom in anticipation of war with Nazi Germany, and also to mark George VI's coronation. The highway received its name to commemorate the visit; it was unveiled on June 7 as the King and Queen ceremonially opened the highway at a site near the Henley Bridge in St. Catharines. Originally, the highway featured stylized light standards with the letters "ER", the Royal Cypher for Elizabeth Regina, the Latin equivalent to "Queen Elizabeth." While mostly replaced with modern lighting masts like other Ontario highways, replicas of these stylized "ER" poles have been installed upon three bridges along the QEW: in Mississauga over the Credit River, in Oakville over Bronte Creek, and in St. Catharines over Twelve Mile Creek. In addition Highway 420 in Niagara Falls and its extension, Falls Avenue, has these "ER" light standards installed since 2002, as a nod to this route being part of the original QEW upon its inauguration in 1940 until being bypassed by QEW's extension to Fort Erie in 1941.[3]

The markers identifying the QEW have always used blue lettering on a yellow background instead of the black-on-white scheme other provincial highway markers use. They originally showed the highway's full name only in small letters, with the large script letters "ER" placed where the highway number is on other signs. In 1955, these were changed to the current design, with the lettering "QEW."[4] Although the QEW has no posted highway number, it is considered to be part of the Province of Ontario's 400-series highway network.[5] The Ministry of Transportation of Ontario designates the QEW as Highway 451 for internal, administrative purposes.[6]

A monument was originally in the highway median at the Toronto terminus of the highway west of the Humber River bridges, dedicated to the 1939 visit of King George VI and Queen Elizabeth and known as the "Lucky Lion." The column, with a crown at the top and a lion at the base, was designed by W. L. Somerville and sculptors Frances Loring and Florence Wyle for $12,000 (equivalent to $212,400 in 2021[7]). The monument was removed in 1972 in order to accommodate widening of the original QEW, and relocated in August 1975 to the nearby Sir Casimir Gzowski Park along Lake Ontario, on the east side of the Humber River.[8]

Route description[edit]

QEW just south of interchange with Highway 405 as seen in 2005 and 2009, respectively, showing the original railway overpass, and the replacement structure which is longer to accommodate the widened freeway.

The QEW is a 139 km (86 mi) route that travels from the Peace Bridge – which connects Fort Erie with Buffalo, New York – to Toronto, the economic hub of the province. The freeway circles the western lakehead of Lake Ontario, cutting through Niagara Falls, St. Catharines, Hamilton, Burlington, Oakville, and Mississauga en route.[9] A 22 km (14 mi) portion of the freeway in Burlington is signed concurrently with Highway 403.[1] Unlike other provincial highways in Ontario, the QEW is directionally signed using locations along the route as opposed to cardinal directions. Driving towards Toronto, the route is signed as "QEW Toronto" throughout its length. In the opposing direction, it is signed as "QEW Hamilton", "QEW Niagara", and "QEW Fort Erie" depending on the location.[4]

Fort Erie–Niagara Falls[edit]

The Queen Elizabeth Way begins at the foot of the Peace Bridge, which crosses the United States border and connects with I-190 in Buffalo, New York. A customs booth is between the bridge and the freeway, beyond which a toll is charged to Canada-bound drivers. West of there, access is provided to nearby Highway 3 and the Niagara Parkway. Through customs, the four-lane freeway proper begins, immediately curving northwest. Within Fort Erie, interchanges provide access to and from the QEW at Central Avenue, Concession Road, Thompson Road, Gilmore Road, and Bowen Road. While there is some urban development at the beginning of the freeway, the majority of the first 25 km (16 mi) are within lowland forests. Numerous creeks flow through these forests, often flooding them. The Willoughby Marsh Conservation Area lies southwest of the freeway, approximately 10 km (6.2 mi) south of Niagara Falls. After an interchange with Lyons Creek Road, the freeway turns northward.[9]

After crossing the Welland River, the original route of the Welland Canal, the freeway exits the forests and enters agricultural land surrounding the suburbs of Niagara Falls, which the highway enters north of the McLeod Road interchange. Within the city, Highway 420 meets the QEW at a large four-level junction and widens to six lanes. The opposing carriageways split at this interchange to accommodate the left-hand exit/entry of the flyover ramps accessing Highway 420, with the Toronto-bound traffic passing under these flyovers and a CN rail crossing. Exiting the northern fringe of Niagara Falls, the freeway again curves northwest and begins to descend through the Niagara Escarpment, a World Biosphere Reserve. Highway 405 merges with the QEW along the short rural stretch between Niagara Falls and St. Catharines. While there is no Toronto-bound access to Highway 405, Niagara-bound drivers can follow this short freeway to the Lewiston–Queenston Bridge, which crosses the U.S. border into Lewiston, New York. The QEW continues west into St. Catharines.[9]

St. Catharines–Hamilton[edit]

The Niagara-bound QEW at the Red Hill Valley Parkway interchange in Hamilton

As the Queen Elizabeth Way enters St. Catharines, it ascends the Garden City Skyway to cross the Welland Canal. This 2.2 km (1.4 mi) structure replaced the lift bridge south of it, one of two major bottlenecks prior to the early 1960s, and is one of two high-level skyways along the route. As the QEW was the first long distance freeway in North America, several modern engineering concepts were not considered in its original 1939 design, and although it was modernized in a recent reconstruction that concluded in 2011, further expansion of the highway is inhibited by the proximity of properties throughout most of its length. Consequently, most of the route beyond the Welland Canal is wedged between service roads which provide access to and from the QEW as well as to local businesses and residences. After passing the Ontario Street (Regional Road 42) interchange, the freeway crosses Martindale Pond, which forms the mouth of Twelve Mile Creek. West of the crossing is a trumpet interchange with Highway 406, which travels south to Welland, after which the QEW crosses out of St. Catharines and into the town of Lincoln at Fifteen Mile Creek, continuing with a six-lane cross-section.[10]

Throughout Lincoln, the QEW travels along the Lake Ontario shoreline through the Niagara Fruit Belt; numerous wineries line the south side of the freeway. Interchanges at Victoria Road (Regional Road 24) and Ontario Street (Regional Road 18) provide access to the communities of Vineland and Beamsville, respectively. The latter encroaches upon the south side of the QEW, interrupting the otherwise agricultural surroundings of the highway in Lincoln. Immediately east of the Bartlett Avenue interchange, the freeway enters Grimsby, where it becomes sandwiched between the Niagara Escarpment and Lake Ontario. The route passes under three overpasses that have remained unchanged since the highway was built: Maple Avenue, Ontario Street, and Christie Street, all served by a single diamond interchange. South of the 50 Point Conservation Area, the freeway exits the Niagara Region and enters the city of Hamilton.[11]

Within Hamilton, the highway passes almost entirely within an industrial park, with interchanges at 50 Road, Fruitland Road, and Centennial Parkway (formerly Highway 20). The third of these is intertwined with the Red Hill Valley Parkway interchange (completed in 2009), at which point the freeway widens to eight lanes. From here, the freeway curves northwest onto Burlington Beach and begins to ascend the Burlington Bay James N. Allan Skyway, the second high-level bridge along the route. As it crosses over the entrance to Hamilton Harbour, the freeway enters the Regional Municipality of Halton and descends into the city of Burlington.[10]

Panoramic view of Burlington Bay James N. Allan Skyway, near Beach Boulevard

Burlington–Oakville[edit]

After descending into Burlington, the QEW crosses North Shore Boulevard (former Highway 2) and Fairview Street/Plains Road as it passes by Mapleview Centre. Next to the Burlington Transmission Station, the QEW encounters the Freeman Interchange, originally opened in 1958 to allow construction of Highway 403 and expanded in the early 1990s to accommodate the western terminus of Highway 407.[12] The freeway turns to the east, becoming concurrent with Highway 403 through Burlington and Oakville. The two routes travel straight though a commercial office area. Service roads reappear through this stretch to serve businesses fronting the highway. The segment, which was expanded in 2011, is eight lanes wide, including one high-occupancy vehicle lane (HOV lanes) in each direction, which required the construction of a second structure over Sixteen Mile Creek. In the eastern end of Oakville, the route curves northeast, passing the Ford Motor Assembly Plant. Highway 403 then diverges north from the QEW while the QEW turns back to the east, entering Mississauga and the Peel Region.[9]

Mississauga-Toronto[edit]

The Queen Elizabeth Way in Mississauga, looking west, at the Evans Avenue interchange and bridges over Etobicoke Creek.

Within Mississauga, the freeway encounters its narrowest right-of-way, wedged between residential subdivisions on either side that prevent further expansion from its six-lane cross section. It crosses the Credit River valley, where a second bridge will soon be under construction. The segment east of the Credit River is being examined for expansion possibilities, but like the previous section, there is little room for more lanes without property acquisition. Some of the interchanges through Mississauga have ramp meters on the entrances onto the QEW, meaning only one vehicle is allowed to enter the on-ramp per each green light on a traffic signal, depending on the time of day, or the amount of traffic is on the highway at a certain time. After crossing Etobicoke Creek, which forms the boundary between Peel Region and Toronto, the route passes through a sprawling four-level interchange with Highway 427, as the freeway continues eastward as the municipal Gardiner Expressway.[9]

The QEW formerly continued beyond the Highway 427 interchange to the Old Toronto city limits at the Humber River, although this section between was downloaded from provincial to municipal authorities on April 1, 1997 and became a westward extension of the Gardiner Expressway. Provincial control of the freeway ends shortly after an onramp from Highway 427; municipal ownership is evident from the use of different high-mast illumination poles that are shaded to reduce light pollution at the underpasses with Wickman Road and a railway line. East of that point the freeway retains its provincial-installed conventional lighting as it splits into a short collector-express system about ten lanes wide to serve the interchanges with Kipling Avenue and Islington Avenue. East of Grand Avenue, the municipality's shaded high-mast lighting has been erected as the freeway crosses Parklawn Avenue and a CN rail line followed by offramps to Lake Shore Boulevard, then it curves as it passes the residential condominium towers of The Queensway – Humber Bay neighbourhood along the waterfront, the Mr. Christie cookie factory (which later became a part of Mondelēz International) and the Ontario Food Terminal on the north side, and then a tunnel leading to the Humber Loop streecar right-of-way.[13]

As the freeway crosses the west bank of the Humber River this marks the QEW's old eastern terminus and the beginning of the Metro Toronto-constructed portion of the Gardiner. Coincidentally at the former eastern end of the QEW, the Metro-built Gardiner Expressway also assumed the provincial Highway 2 designation from Lake Shore Boulevard (from Lake Shore Boulevard's on-ramp to the Gardiner), until most of Highway 2 was decommissioned in 1998 leaving both Lake Shore and the Gardiner without a provincial route number. This old demarcation line was quite visible on the freeway as a change in pavement quality and the use of different guardrail and lighting (since the late 1960s the province used conventional truss poles originally fitted with mercury halide lamps before being replaced by high-pressure sodium lamps in the 1990s, while Metro installed had the distinctive cobra-neck 30-foot (9.1 m) poles with fluorescent tubes that were since swapped for orange low-pressure sodium lamps in 1978).[14] The Gardiner Expressway continues through downtown Toronto, and after crossing the Don River it ends at Lake Shore Boulevard (where it ceded the Highway 2 provincial routing back to Lake Shore until 1998), although a partial interchange connects to the Don Valley Parkway (DVP) which turns ninety degrees and heads northbound when it eventually meets Highway 401.

History[edit]

The QEW opened as The Middle Road in the mid-1930s, lacking most modern safety standards

Toronto-Hamilton Highway[edit]

As automobile use in southern Ontario grew in the early 20th century, road design and construction advanced significantly. A major issue faced by planners was the improvement of the routes connecting Toronto and Hamilton, which were consistently overburdened by the growing traffic levels.[15] Following frequent erosion of the former macadamized Lakeshore Road,[16] a cement road known as the Toronto–Hamilton Highway was proposed in January 1914.[17] The highway was designed to run along the lake shore, instead of Dundas Street to the north, because the numerous hills encountered along Dundas would have increased costs without improving accessibility. Middle Road, a dirt lane named because of its position between the two, was not considered since Lakeshore and Dundas were both overcrowded and in need of serious repairs.[18] Construction began on November 8, 1914, but dragged on throughout the ongoing war.[15][19] It was formally opened on November 24, 1917,[16] 5.5 m (18 ft) wide and nearly 64 km (40 mi) long. It was the first concrete road in Ontario, as well as one of the longest stretches of concrete road between two cities in the world.[20] Though many minor improvements in alignment were made, the original highway was without modern bridges for the crossings of the Credit River and Bronte, Etobicoke, and Mimico Creeks.[21] Modern concrete arch bridges for all crossings except Bronte Creek were completed in 1919.[22]

The Middle Road[edit]

The Toronto entrance to the QEW and the Queen Elizabeth Way Monument in 1940. In 1974, the monument was removed. It was later reinstalled nearby in 1975.

Over the next decade, vehicle usage increased substantially, and by 1920 Lakeshore Road was again highly congested on weekends.[23] In response, the Department of Highways examined improving another road between Toronto and Hamilton. The road was to be more than twice the width of Lakeshore Road at 12 m (39 ft) and would carry two lanes of traffic in either direction.[24] Construction on what was then known as the Queen Street Extension west of Toronto began in early 1931 as a Great Depression relief project.[25]

Before the highway could be completed, Thomas McQuesten was appointed the new minister of the Department of Highways, with Robert Melville Smith as deputy minister, following the 1934 provincial elections.[26] Smith, inspired by the German autobahns—new "dual-lane divided highways"—modified the design for Ontario roads,[27] and McQuesten ordered that the Middle Road be converted into this new form of highway.[28][29][30] A 40 m (130 ft) right-of-way was purchased along the Middle Road and construction began to convert the existing sections to a divided highway. Work also began on Canada's first interchange at Highway 10.[24]

By the end of 1937, the Middle Road was open between Toronto and Burlington. When it opened, it was the first intercity divided highway in North America[Note 1] and boasted the longest continuous stretch of illumination in the world until the Second World War.[31][32]

The New Niagara Falls Highway[edit]

McQuesten also foresaw the financial opportunities that came with cross-border tourism and opening the "Ontario frontier" to Americans. In 1937, construction began on a new dual highway from Hamilton to Niagara Falls (first known as the Hamilton-Niagara Falls Highway) along the bottom of the Niagara Escarpment. This route was intended to connect with the Middle Road on the opposing shore of Lake Ontario.[33] Work began at the end of March to grade the route between Stoney Creek and Jordan. The Hamilton-Niagara Falls Highway connected to the Middle Road via a trumpet junction known as the Burlington Interchange.[34][35]

The prospect of removing hundreds of acres of farmland did not sit well with many, especially farmers in the path of the new highway. Rumours spread the prices paid for land were to be well below market value, and local protests erupted throughout the summer. However, the purpose of the new highway was to replace the congested, winding and hilly route of Highway 8 along the escarpment; several groups of collisions that summer gradually persuaded the public to support the new highway. By the autumn, 340 acres (140 ha) of fruitland were cleared to make way for the route.[36]

Over the next two years, numerous bridges and cloverleaf interchanges along the new highway were constructed. In addition, a large traffic circle was built in Stoney Creek to connect with Highway 20. The majority of this structural work was completed by June 1939. However, despite being opened to traffic between Stoney Creek and Jordan, the majority of the new route was gravelled. Over a ten-week period in the late spring and early summer of 1940, 58 km (36 mi) were paved, completing the four-lane highway between Hamilton and Niagara Falls.

It soon came time to name the new highway, and an upcoming visit by King George VI and Queen Elizabeth proved to be the focal point for a dedication ceremony. On June 7, 1939, the two royal family members drove along both the newly connected Toronto-Hamilton and Hamilton-Niagara Falls highways and passed through a light beam near the Henley Bridge in St. Catharines.[37] This caused two Union Jacks to swing out, revealing a sign which read The Queen Elizabeth Way.[38]

However, the ceremony only named the segment of the highway between St. Catharines and Niagara Falls as The Queen Elizabeth Way. The remainder of the road was still known by various names, including the Toronto–Burlington/Hamilton Highway and The New Middle Road Highway.[38] On August 23, 1940, McQuesten cut a ribbon at the Henley Bridge in St. Catharines and officially declared the Queen Elizabeth Way open between Toronto and Niagara Falls, at which point the entire route was given the Queen Elizabeth Way name.[39] Over a ten-week period in the late spring and early summer of 1940, 58 km (36 mi) were paved, completing the four-lane highway between Hamilton and Niagara Falls.

Construction on an extension towards Fort Erie, which became known as the QEW Extension, was underway, but the ongoing war delayed its completion. As an interim measure, the unpaved highway was opened during the summer of 1941. Bypassed by the new QEW extension to Fort Erie in 1941, the Niagara Falls bridge approach became a spur route that was no longer part of the QEW so it was officially named the Rainbow Bridge Approach for the next three decades (until upgraded and designated as Highway 420 in 1972). Two lanes of pavement were laid in 1946, but the four-lane highway was not fully paved until 1956, with the portion from Niagara Falls to Fort Erie being the last to be fully paved. The entire route – from Toronto's Humber River all the way to Fort Erie, all named as the QEW – was officially opened on October 14 of that year, completing the envisioned highway 25 years after work had begun.[40]

Conversion to freeway[edit]

Long traffic jams, such as this one entering Toronto prior to the construction of the Gardiner Expressway, became commonplace on the unupgraded highway.

1950s: Control of access[edit]

Despite some modern infrastructure, including traffic circles, interchanges, and some grade-separations, the majority of the new superhighway was not controlled-access. This meant existing farmers and homeowners along several segments that were once concession roads were permitted to build driveways and entrances onto the road. In addition, the majority of the crossroads encountered along the route were at-grade intersections. This, combined with the ever-increasing number of automobiles, traffic jams, accidents, and deteriorating pavement, led the Department of Highways to state it had begun "salvaging" the QEW in its 1953 annual report.[41]

The first new interchange opened at Dixie Road in 1953, beginning a seven-year program to make the Hamilton–Toronto section into a full-fledged freeway.[42] Over the next three years, the route was improved west to Highway 10 (Hurontario Street). This work was completed in early 1956. Service roads were installed and 13 intersections eliminated, resulting in a 50% reduction of the accident rate along that section.[43] In Toronto, work began in 1955 to construct the Gardiner Expressway, which would tie in with the end of the QEW.[44] The first section of the Gardiner, connecting the QEW to Jameson Avenue, was officially opened by Metropolitan Toronto chairman Fred Gardiner and Premier Leslie Frost on August 8, 1958.[45] Work was also underway on the Toronto Bypass, involving the upgrade of Highway 27 to a freeway between the QEW and the new Highway 401. Construction began in 1953,[46] and included an upgrade of the cloverleaf interchange with the QEW with larger loop ramps. This interchange would become one of the worst bottlenecks in the province a decade after its completion, according to Highways Minister Charles MacNaughton.[47]

Expanding the QEW to six lanes between Hamilton and Toronto required the expansion of several large bridges, such as this one at Bronte Creek in 1959. The former Service Road interchange west of Bronte Creek is under construction in the background.

On September 11, 1957, construction began to widen the QEW to six lanes between Highway 27 and the Humber River. It was completed by December 1958,[48] as were interchanges with Mississauga Road and Kerr Street.[49] Service roads allowed engineers to separate local access from the highway and avoid space-consuming interchanges in many places.[41] Therefore, interchanges were only opened at Bronte Road (then Highway 25), Kerr Street, Royal Windsor Drive (then Highway 122), Southdown Road (now Erin Mills Parkway north of the interchange), Mississauga Road, Hurontario Street (then Highway 10), Cawthra Road, Dixie Road, and Highway 27.

The Skyways[edit]

Two major projects were ongoing near Burlington at this point. On April 29, 1952, the W.E. Fitzgerald struck the two-lane lift bridge at the entrance to Hamilton Harbour.[50] Damage to the crossing resulted in the QEW's closure until a temporary bridge was erected. To remedy what was becoming a major delay and hazard, the Department of Highways began planning a high-level bridge to cross the shipping channel. Immediately west of the Guelph Line interchange, construction also began to improve access to the new bridge with the Freeman Diversion, a new routing of the QEW that would bypass the existing Middle Road section which passed through the community of Freeman that was becoming increasingly built-up, then connect to a new three-way junction (the Freeman Interchange) with the proposed Chedoke Expressway, and continue to the existing Burlington Interchange which would retain the underpass for Middle Road but be reconfigured to accept traffic primarily from the Diversion. Work on the new bridge and Diversion proceeded over the next six years.[51]

The Garden City Skyway in September 1963, soon before opening. The old bridge lies to the left, raised for a passing ship. Traffic is queued on both sides, a frequent occurrence each summer until the skyway was built.

The Freeman Diversion opened to traffic in August 1958,[52] with the old alignment becoming an eastward extension of Plains Road (still directly accessible via a split west of Guelph Line).[9] Premier Frost opened the 2,700-metre-long (8,900 ft), four-lane skyway two months later on October 30. Although the skyway greatly reduced traffic delays, it was not without controversy due to its height, cost, tolling, and most especially its name. Residents in Burlington demanded it be named the Burlington Skyway, while Hamilton residents countered with the Hamilton Skyway. As a compromise, the Thomas B. McQuesten Skyway was proposed. However, the provincial government had the final say in the matter, and opted to name it the Burlington Bay Skyway. Tolls were collected beginning on November 10.[51]

Elsewhere, in St. Catharines, planning was already advanced on a second skyway to cross the Welland Canal. The Homer Lift Bridge, a longstanding feature along Highway 8, was another point where the QEW narrowed to two lanes and traffic faced regular delays. Construction of the Homer Skyway, as it was tentatively known, began in July 1960 and progressed over the following three years.[51][53] The $20 million (in $1963, 176,000,000 adjusted for inflation) structure was officially opened by Premier John Robarts on November 15, 1963. However, traffic had already been flowing on the 2,200-metre-long (7,200 ft) bridge since October 18.[54] As with the Burlington Bay Skyway, tolls were collected on the new bridge. However, the name was almost unanimously chosen by St. Catharines residents to be the Garden City Skyway.[55] The collection of tolls on both skyways continued until December 28, 1973.[56]

The Shook's Hill interchange serving Erin Mills Parkway, in June 1961. This rotary junction was the only example built in Ontario. It was reconfigured to a conventional Parclo A4 in 2001.

1960s and 1970s: Expansion and new interchanges[edit]

On September 15, 1960, the Shook's Hill interchange, a rotary junction or grade-separated traffic circle (the only example in Ontario, although this interchange type is common in the United Kingdom), was completed at what is now Erin Mills Parkway. It was opened to traffic the following day, and completed the program to make the QEW a freeway between Burlington and Toronto.[57][58] A final project, to reconstruct the intersection with Brant Street into an interchange, was carried out in 1964 and made the QEW a freeway between Hamilton and Toronto.[59]

By 1963, work was underway to improve the Niagara Falls–Hamilton stretch of the QEW into a controlled-access highway.[60] At the end of 1966, the QEW was six lanes wide through Mississauga and Toronto, as well as between the Freeman Interchange and east of Brant Street.[61] This six-laning was extended west from Ninth Line to Kerr Street by 1968. The remaining section of four-lane highway along the Burlington to Toronto stretch, between Brant Street and Kerr Street, was reconstructed beginning in 1970 and completed by 1972.[62][63]

The late 1960s and early 1970s also saw the complete reconstruction of three important interchanges: the Rainbow Bridge Approach (later Highway 420) in Niagara Falls, Highway 20 (Centennial Parkway) in Hamilton, and Highway 27 in Toronto. The former two were traffic circles in place since the QEW was opened in 1940; the third was a large cloverleaf interchange that had become outdated with the expansion of Highway 27 to twelve lanes throughout the 1960s. The connections with the Rainbow Bridge Approach and with Highway 27 required new massive high-speed interchanges to accommodate freeway-to-freeway traffic movements.[41][44]

The reconstruction of the interchange between QEW and Highway 27 (later renumbered to Highway 427) from a cloverleaf to a semi-directional T took just one year in the late 1960s. Note the temporary diversion of QEW traffic to an overpass that would eventually be used for The Queensway.

The four-level junction with Highway 27 was built over 48.5 ha (120 acres) and required the construction of 19 bridges and the equivalent of 42 km (26 mi) of two-lane roadway, as well as the temporary diversion of QEW traffic to an overpass that would eventually be used for The Queensway. Construction began in September 1968,[64] although preliminary work had been ongoing since 1966;[61] the interchange opened to traffic on November 14, 1969. Between the recently expanded Highway 27 (which would be renumbered as Highway 427 on December 4, 1971) and Lake Shore Boulevard, the QEW was also expanded to 8–10 lanes which included a short collector-express system between Kipling Avenue and Royal York Road.[64][65]

Construction of the four-level interchange between the QEW and Rainbow Bridge Approach began in 1971, removing the two traffic circles along the approach at the QEW and Dorchester Road.[66] The interchange between the QEW and Lundy's Lane (Highway 20) was also removed; instead, the new interchange provided access to Montrose Road.[67] The work was completed by April 1972, at which point the Rainbow Bridge Approach was designated as Highway 420.[68]

Planning for the removal of the Stoney Creek traffic circle was completed by 1970,[62] and reconstruction began in 1974.[69] This involved the removal of a rail line which crossed through the circle, and was the demise of one of two major features along the route.[41][44] The new interchange opened in 1978,[70] completing the transformation of the QEW into a controlled-access highway.[69]

During the late 1970s, construction was carried out on several new interchanges between Hamilton and Toronto. New interchanges at Dorval Drive and Trafalgar Road replaced the one at Kerr Street. In Mississauga, work commenced at Cawthra Road, while in Burlington a new interchange was built at Appleby Line.[71][72]

The Freeman Interchange in Burlington

1980s to 1997: Growing capacity[edit]

Now functioning as a freeway, the QEW was already overburdened by the ever-increasing number of vehicles. The Burlington Bay Skyway, which was built to bypass Hamilton Harbour and the Port of Hamilton, was the lone four-lane link on the route between Hamilton and Toronto. It was initially designed to handle 50,000 vehicles daily, but by 1973 there were 60,000 vehicles crossing it. Preliminary work on a second parallel structure began a decade later in 1983.[73] In July of that year, Transportation Minister James Snow broke ground for the new bridge.[55] Construction was carried out over two years, and the twinned structure was opened on October 11, 1985.[56] It was named the James N. Allan Skyway, in honour of James Allan, Minister of Highways during construction of the original skyway. The new name was not well received by locals, and debate erupted once again whilst the original bridge was closed and repaired for several years.[55] It reopened on August 22, 1988,[56] with Toronto-bound traffic crossing the original bridge. The twin structure was renamed the Burlington Bay James N. Allan Skyway, though it is commonly referred to as simply the Burlington Skyway.[55]

Alongside the twinning of the skyway to eight lanes, the QEW was widened to at least six lanes from the Freeman Interchange to Centennial Parkway. A variable lighting system, changeable message signs and traffic cameras were added to create a new traffic-management system called COMPASS. Modern interchanges were constructed for Fairview Street/Plains Road (steel tub girder bridges replaced the 1937-built structure originally used for the Burlington Interchange[74]) and Northshore Boulevard (then Highway 2) including a collector lane for Niagara-bound traffic and on/off-ramps to Eastport Drive. Eastport Drive was built at the same time to relieve traffic on Beach Boulevard. This work was completed between late 1984 and 1990.[75][76]

The former QEW in Etobicoke which was re-designated as part of the Gardiner Expressway in 1997, looking east from Royal York Road overpass.

With the expanded capacity of the skyway, and the unanticipated traffic volumes on Highway 403, the Freeman Interchange was now faced with a capacity problem.[77] To resolve this, the renamed Ministry of Transportation began planning for the missing link of Highway 403 between Burlington and Mississauga that would run parallel to the QEW;[78] this right-of-way would be sold to the 407 ETR consortium in 1995 and built as part of that route.[79] Work began in August 1991 to reconfigure the interchange to modern standards which included realigning the QEW carriageways as mainline traffic, and adding a fourth leg for the future Burlington-Mississauga link. Due to land and cost constraints of the reconstruction, this necessitated replacing the directional ramp with a lower-capacity loop ramp for the movement from Toronto-bound QEW to the Brantford-bound Highway 403 (as some traffic was expected to be diverted away from the Burlington Skyway to the under-construction Lincoln M. Alexander Parkway and planned Red Creek Expressway). The rebuilt Freeman Interchange was partially opened on October 23, 1993 to serve the existing QEW and Highway 403 segments; the first sod for what would open as Highway 407 was turned that day.[80] The completed ramps (the first to be built were cast-in-place post-tensioned bridges to cross Highway 403 westbound, followed in 2000 by precast girder bridges to pass over the North Service Road[81][82]) connecting to the future Burlington-Mississauga freeway sat unused until that segment finally opened on July 30, 2001, as part of Highway 407 ETR.[83]

Budgetary restraints in the 1990s forced the provincial government to sell off or download many highways to lower levels of government, or, in the case of Highway 407, to a private consortium.[84] As part of recommendations, the QEW east of Highway 427 to the Humber River was transferred to the responsibility of Metro Toronto. The transfer took place on April 1, 1997.[14] The city subsequently renamed it as part of the Gardiner Expressway.[85] After the provincial downloading and Amalgamation of Toronto, much of this former QEW has remained largely unchanged though some segments have received a mix of high mast and low masts with shaded high pressure sodium lamps (similar to the Don Valley Parkway), while the old steel guardrail in the median was replaced by an Ontario "tall-wall" concrete barrier in 2007. Worn-out bilingual provincial signage have received unilingual replacements, while billboards which the province had long prohibited have been erected in proximity of the now-municipal freeway.[14]

Since 1998[edit]

The Shook's Hill rotary interchange (originally opened in 1960) with Erin Mills Parkway and Southdown Road, was completely reconstructed to a conventional Parclo A4 from May 1999 to 2001.[86] The nearby Hurontario Street interchange, originally a cloverleaf junction, was reconfigured to a five-ramp Parclo by 2010.[87]

The Red Hill Valley Parkway, which opened on November 16, 2007, added a significant new interchange to the QEW.[88] The ramp to the southbound parkway did not open until December 2008.[89] The nearby interchange to Burlington Street had its 1958-built overpass replaced to accommodate the widening of the QEW to eight lanes, which included a collector lane on the Niagara-bound QEW to avoid weaving that otherwise would have resulted from the close proximity to the Red Hill Valley Parkway junction.[90] Construction was completed in 2009.[91]

HOV lanes along the co-signed QEW / Highway 403

From 1998 to 2003, the QEW between Brant Street and Guelph Line was expanded from four to eight lanes,[92] necessitating the removal of the underused Freeman Diversion split including the Niagara-bound carriageway's left-hand exit to Plains Road, so the Toronto-bound carriageway could be shifted next to the Niagara-bound carriageway where the opposing directions would be separated by a concrete median barrier and high mast lighting. This complemented the replacement of the existing railway grade separation (where each carriageway had its own underpass in order to accommodate the Plains Road off-ramp) with a new single structure wide enough to accommodate both directions of the expanded freeway. Plains Road was redirected to the existing service road (Queensway Drive/Harvester Road) that meets Guelph Line at an intersection just south of Guelph Line's interchange with the QEW. The interchange with Guelph Line (originally a full cloverleaf when built, with the northern half modified to a diamond in the mid-1960s[93][94]) was reconfigured to modern Parlo A4 that exclusively served QEW traffic after the ramps to Plains Road were removed, which was completed in 2006.[95]

Starting in 2007, the highway was widened to permit an additional HOV lane in either direction between Guelph Line and Trafalgar Road, which involved twinning the Bronte Creek and Sixteen Mile Creek Bridges following by rehabilitating the original structures.[96] These lanes were opened to traffic on November 29, 2010.[97]

Work began in 2005 to widen the QEW from four to six lanes through St. Catharines from Highway 406 to the Garden City Skyway.[98] This segment whose original design dated back to 1939, saw several interchanges improved and numerous structures replaced, although the widened Henley Bridge kept its classic architecture while existing service roads and local properties beside the freeway were largely retained. Work was completed on August 26, 2011, at a cost of $186 million.[99][100]

In the late 2000s, for the section between the Freeman Interchange to North Shore Boulevard, an additional lane was added for Niagara-bound traffic, while the widening of the structure crossing Fairview Street/Plains Road enabled the loop ramp from Fairview Street to be reinstated; this onramp was originally opened in 1985 and closed off in 2001 when Highway 407 ETR opened after concerns from the city over cyclists' safety.[101] As part of the future widening of the QEW, the existing cast-in-place concrete bridges for the North Shore Boulevard underpass were joined by two precast box girder structures on either side in 2021.[102]

QEW at the Highway 403 split in Oakville prior to reconstruction that commenced in 2016; the Ford Assembly Plant is in the background.

In Oakville, improvements are being made to the Highway 403/QEW/Ford Drive interchange. Since 2017, traffic using the existing loop ramp in the NE corner to access Highway 403/QEW was directed onto a new overpass instead of sharing the existing overpass with westbound Highway 403 traffic. From November 2016 to 2020, the 1970s-era bridges carrying QEW traffic across Ford Drive and the eastbound ramp to Highway 403 were demolished and replaced by new wider structures which can accommodate future HOV lanes and high-mast lighting.[103][104][105] At the present Highway 403 only connects to the QEW west of the interchange, but a new set of flyover ramps are being proposed from Highway 403 to the QEW east of that junction using the existing right-of-way which would allow for a direct freeway connection from Milton to south Mississauga.[106]

There are also plans to twin the bridge spanning the Credit River in Mississauga. A second bridge will be built alongside the existing structure, which will then be repaired while traffic is shifted to the new bridge. In November 2019 the Ford government announced that the historic bridge would be demolished and replaced,[107] but changed course due to public opposition on December 18 by restricting project bids to those that would rehabilitate the structure.[108]

Construction of Ontario's first diverging diamond interchange, at Glendale Avenue, began in January 2021.[109] The new interchange, which includes a dedicated ramp to Airport Road, opened to traffic on September 26, 2022.[110]

A stretch of the QEW from east of Cawthra Road to the west of Etobicoke Creek is to be widened with the removal of the adjacent service roads, with the centerpiece of the project involving reconfiguring the Dixie Road interchange to a five-ramp Parclo and replacing the aging Dixie Road overpass. Construction commenced in May 2022 with an anticipated completion date in July 2026.[111]

In November 2023, the municipal and provincial governments announced a tentative deal which will see responsibility for the Gardiner Expressway and Don Valley Parkway transferred to the provincial government, with the two highways to be maintained as provincial highways. For the foreseeable future, the downloaded QEW segment east of Highway 427 will remain signed as part of the Gardiner.[112][113]

High-occupancy toll lanes[edit]

On December 7, 2015, Ontario's Transportation Ministry announced it was working on a plan to create permanent high-occupancy toll lanes (HOT) on a 16.5-kilometre (10.3 mi) stretch, in both ways, between Trafalgar Road in Oakville and Guelph Line in Burlington starting on September 15, 2016.[114] This would require vehicles with a single occupant to purchase a permit for such use. (A portion of Highway 427 would also have HOT lanes.) Vehicles classified as environmentally-friendly and denoted with a green license plate would not be required to pay when using the HOT lanes.[115] Prices for the permits had not yet been determined for this plan, described as a pilot project, said Transportation Minister Steven Del Duca during a press conference.[116]

Exit list[edit]

The following table lists the exits along the QEW. Exits are numbered from Fort Erie to Toronto. The following table lists the major junctions along Queen Elizabeth Way, as noted by the Ministry of Transportation of Ontario.[1] 

DivisionLocationkm[1]miExit[9]DestinationsNotes
Niagara River
Canada–United States border
0.00.0
NY 955B to I-190 – Buffalo
Continuation into New York (state)
Peace Bridge (toll)
Regional Municipality of NiagaraFort EriePeace Bridge Border Crossing
0.20.12 Regional Road 124 (Central Avenue) / Duty Free WayLast Fort Erie-bound exit before U.S.A.; no exit number; no access from Central Avenue to Peace Bridge; Duty Free Way not signed Toronto-bound
1.10.681Concession Road (Regional Road 126)Toronto-bound exit and Fort Erie-bound entrance
2.11.32 To Highway 3 / Thompson Road (Regional Road 122)Toronto-bound exit and Fort Erie-bound entrance
 Regional Road 122 (Thompson Road) / Bertie Street (Regional Road 17)Fort Erie-bound exit and Toronto-bound entrance
4.62.95 Regional Road 19 (Gilmore Road)
6.74.27 Regional Road 21 (Bowen Road) – Stevensville
Fort Erie–Niagara Falls boundary12.27.612 Regional Road 25 (Netherby Road) – Welland
Niagara Falls15.59.616 Regional Road 116 (Sodom Road) – Chippawa, Crystal Beach
22.113.721 Regional Road 47 (Lyons Creek Road) – Welland
26.616.527 Regional Road 49 (McLeod Road)
29.518.330 Highway 420 – The Falls, Niagara Falls U.S.A.
 Regional Road 20 (Lundy's Lane) / Dorchester Road
Split into exits 30A (Hwy 420) and 30B (Lundy's Ln.) Fort Erie-bound
31.519.632 Regional Road 57 (Thorold Stone Road) – Thorold
34.021.134 Regional Road 101 (Mountain Road)
Niagara-on-the-Lake36.522.737 Highway 405Queenston (to Lewiston, New York)Fort Erie-bound exit and Toronto-bound entrance
37.823.538 Regional Road 89 (Glendale Avenue) – Niagara-on-the-LakeCurrently being rebuilt into Ontario's first diverging diamond interchange (DDI)
Welland CanalGarden City Skyway
St. Catharines43.927.344 Regional Road 48 (Niagara Street) / Service Road
45.628.346 Regional Road 44 (Lake Street)
46.929.147 Regional Road 42 (Ontario Street)
Henley Bridge over Twelve Mile Creek
47.729.648 Regional Road 38 (Martindale Road)Toronto-bound exit and Fort Erie-bound entrance
48.430.149 Highway 406Thorold, Welland
 Regional Road 39 (3rd Street / North Service Road)
50.431.351 Regional Road 34 (Seventh Street)
Lincoln54.734.055 Regional Road 26 (Jordan Road) – Jordan Station
57.635.857 Regional Road 24 (Victoria Avenue) – Vineland
64.340.064 Regional Road 18 (Ontario Street) – Beamsville
Grimsby68.142.368 Regional Road 14 (Bartlett Avenue)
70.643.971 Regional Road 12 (Christie Street) / Maple Avenue / Ontario Street
74.246.174 Regional Road 10 (Casablanca Boulevard)
Hamilton77.848.378Fifty RoadFormerly City Road 450
82.951.583Fruitland RoadFormerly City Road 455
88.154.788 City Road 20 (Centennial Parkway)Formerly Highway 20
89 Red Hill Valley Parkway
89.855.890Nikola Tesla Boulevard, Woodward AvenueWoodward Ave. not signed Toronto-bound
93.858.393Eastport Drive (Highway 7189)Toronto-bound exit and Fort Erie-bound entrance
Burlington BayBurlington Bay James N. Allan Skyway
HaltonBurlington97.160.397North Shore Boulevard, Eastport DriveFormerly Highway 2
99.561.899Plains Road, Fairview StreetToronto-bound exit and Fort Erie-bound entrance
100.562.4100 Highway 403 – Hamilton (Downtown), BrantfordBeginning of Highway 403 concurrency; serves John C. Munro Hamilton International Airport
 407 ETR eastToronto-bound exit and Fort Erie-bound entrance; toll highway
101.362.9101 Regional Road 18 (Brant Street)No Toronto-bound exit and Fort Erie-bound entrance
103.264.1102 Regional Road 1 (Guelph Line)
105.265.4105Walkers Line
107.366.7107 Regional Road 20 (Appleby Line)
Burlington–Oakville boundary109.367.9109 Regional Road 21 (Burloak Drive)
Oakville110.968.9110Service RoadFort Erie-bound exit only. Access removed in 2008 to accommodate widening of the QEW for HOV Lanes
111.369.2111 Regional Road 25 (Bronte Road) – Milton
113.470.5113Third Line
116.572.4116 Regional Road 17 (Dorval Drive)
Kerr StreetFort Erie-bound exit only
118.673.7118 Regional Road 3 (Trafalgar Road)
120.074.6119Royal Windsor DriveToronto-bound exit and Fort Erie-bound entrance; formerly Highway 122
123.176.5123 Regional Road 13 (Ford Drive)
Highway 403 to Highway 401TorontoEnd of Highway 403 concurrency; Toronto-bound exit and Fort Erie-bound entrance
Halton–Peel boundaryOakville–Mississauga boundary124.577.4124 Regional Road 19 (Winston Churchill Boulevard)
PeelMississauga126.678.7126 Regional Road 1 (Erin Mills Parkway) / Southdown RoadSouthdown Rd. was formerly Highway 122
130.781.2130Mississauga Road
132.782.5132Hurontario StreetFormerly Highway 10
134.983.8134 Regional Road 17 (Cawthra Road)
136.784.9136 Regional Road 4 (Dixie Road)Fort Erie-bound exit and Toronto-bound entrance
Toronto138.586.1138Evans Avenue, West Mall, Brown's LineToronto-bound exit and Fort Erie-bound entrance
139.186.4139 Highway 427 to Highway 401 – Pearson Airport
 Gardiner Expressway – Downtown Toronto
Toronto-bound terminus; freeway continues east through downtown Toronto as the Gardiner Expressway
141Evans Avenue, Kipling Avenue
St. Lawrence AvenueFort Erie-bound Right-out exit only; access to Islington Avenue south
142Islington AvenueSigned as exits 142A (south) and 142B (north); no Fort Erie-bound entrance from southbound Islington Avenue
144Park Lawn RoadToronto-bound exit and Fort Erie-bound entrance
145Lake Shore BoulevardFort Erie-bound exit and Toronto-bound entrance; formerly Highway 2 west; former beginning of Highway 2 concurrency
146Lake Shore Boulevard, South KingswayFormer end of Highway 2 concurrency
149Jameson Avenue, Lake Shore Boulevard, Dunn AvenueNo major junctions[117]
153Spadina Avenue
154York Street, Bay Street, Yonge StreetYork Street was formerly Highway 11A; Yonge Street formerly Highway 11
155Jarvis Street, Sherbourne StreetFort Erie-bound exit to Jarvis/Sherbourne, Toronto-bound entrance from Jarvis
 Don Valley Parkway
157Lake Shore BoulevardFormerly Highway 2; former Toronto-bound terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

In popular culture[edit]

As the principal travel route between Toronto and Buffalo, whenever sports teams from the two cities face each other (particularly the Sabres and Maple Leafs in the National Hockey League) the game is called The Battle of the QEW.[118] This name has also been used to describe CFL games between longtime arch-rivals the Toronto Argonauts and Hamilton Tiger-Cats.

See also[edit]

References[edit]

Notes[edit]

  1. ^ While the Long Island Parkway and several similar roadways opened in the late twenties and early thirties, these parkways were designed to move traffic in and out of a city's downtown. The Middle Road was designed to provide travel between cities, and opened a year before the Pennsylvania Turnpike, the first U.S. highway to do this.

Sources[edit]

  1. ^ a b c Ministry of Transportation of Ontario (2007). "Annual Average Daily Traffic (AADT) counts". Government of Ontario. Archived from the original on July 6, 2011. Retrieved May 26, 2011.
  2. ^ Miller, Tim; Stancu, Henry (July 27, 2012). "The QEW: 75 Years and Counting". Wheels.ca. Archived from the original on July 14, 2014. Retrieved June 7, 2014.
  3. ^ Stamp 1987, pp. 31–34.
  4. ^ a b Stamp 1987, p. 9.
  5. ^ Walter, Karena (February 21, 2014). "Search Engine: Highway Mysteries Solved". The Niagara Falls Review. Archived from the original on April 20, 2014. Retrieved April 19, 2014.
  6. ^ Ministry of Transportation of Ontario (March 31, 1984). Annual Report 1983–1984 (Report). Government of Ontario. p. 65. Retrieved December 19, 2020.
  7. ^ 1688 to 1923: Geloso, Vincent, A Price Index for Canada, 1688 to 1850 (December 6, 2016). Afterwards, Canadian inflation numbers based on Statistics Canada tables 18-10-0005-01 (formerly CANSIM 326-0021) "Consumer Price Index, annual average, not seasonally adjusted". Statistics Canada. Retrieved April 17, 2021. and table 18-10-0004-13 "Consumer Price Index by product group, monthly, percentage change, not seasonally adjusted, Canada, provinces, Whitehorse, Yellowknife and Iqaluit". Statistics Canada. Retrieved April 17, 2021.
  8. ^ Stamp 1987, pp. 43–46.
  9. ^ a b c d e f g Ontario Back Road Atlas (Map). Cartography by MapArt. Peter Heiler. 2010. pp. 18–19, 24. § L28–U36. ISBN 978-1-55198-226-7.
  10. ^ a b Golden Horseshoe (Map). Cartography by MapArt. Peter Heiler. 2011. pp. 715, 716, 726. § L17–N28. ISBN 978-1-55198-877-1.
  11. ^ Golden Horseshoe (Map). Cartography by MapArt. Peter Heiler. 2011. pp. 711–715. § E33–F42, K1–L17. ISBN 978-1-55198-877-1.
  12. ^ "QEW and Highway 403 Freeman Interchange Preliminary Design Study and Class Environmental Assessment" (PDF). qew403freeman.ca. October 10, 2017. Archived from the original (PDF) on July 29, 2021. Retrieved February 6, 2021.
  13. ^ White, Craig, ed. (2002). The Golden Horseshoe 2002. MapArt. p. 119.
  14. ^ a b c Highway Transfers List (Report). Ministry of Transportation of Ontario. April 1, 1997. p. 3.
  15. ^ a b Filey, Mike (November 20, 2011). "Road Pioneers of the Past". Life. The Toronto Sun. p. 44.
  16. ^ a b Emery & Ford 1967, pp. 179–182.
  17. ^ "Toronto–Hamilton Highway Proposed". The Toronto World. January 22, 1914. p. 14. Archived from the original on October 19, 2021. Retrieved February 9, 2010.
  18. ^ Shragge & Bagnato 1984, p. 55.
  19. ^ George H. Gooderham (December 26, 1917). "Difficulties in Construction of Toronto-Hamilton Highway". Engineering and the Contract Record: 1048–9.
  20. ^ Shragge p. 55 "...the Toronto-to-Hamilton highway which, when completed in 1917, was both Ontario's first concrete highway and one of the longest such inter-city stretches in the world."
  21. ^ H. S. Van Sconynoc (October 31, 1917). "Completion of Last Section of the Toronto-Hamilton Concrete Highway". Engineering and the Contract Record: 899–902.
  22. ^ "Four Concrete Overhead Arch Bridges on Toronto-Hamilton Highway". Engineering and the Contract Record: 301–306. April 2, 1919.
  23. ^ "Increased Volume of Traffic". County And Suburbs. Toronto World. June 26, 1920. p. 7. Archived from the original on August 18, 2021. Retrieved February 12, 2010.
  24. ^ a b Shragge & Bagnato 1984, pp. 79–81.
  25. ^ Filey 1994, pp. 61–62.
  26. ^ Shragge, John G. (2007). "Highway 401 – The Story". Archived from the original on March 28, 2008. Retrieved February 12, 2010.
  27. ^ Stamp 1987, pp. 19–20.
  28. ^ "Hopes to Improve Roads". The Gazette. Montreal. February 18, 1936. p. 14. Archived from the original on October 19, 2021. Retrieved February 9, 2010.
  29. ^ English, Bob (March 16, 2006). "Remember That 'Little Four-Lane Freeway?'". Globe And Mail. Toronto. Retrieved February 9, 2010. ...the freeway concept was promoted by Hamiltonian Thomas B. McQuesten, then the highway minister. What would become The Queen Elizabeth Way was already under construction, but McQuesten changed it into a dual-lane divided highway, based on Germany's new autobahns.[permanent dead link]
  30. ^ Stamp 1987, pp. 11–12.
  31. ^ Stamp 1987, p. 11.
  32. ^ Stamp 1987, p. 47.
  33. ^ Stamp 1987, p. 25.
  34. ^ [1][2]
  35. ^ Stamp 1987, p. 27.
  36. ^ Stamp 1987, pp. 25–28.
  37. ^ Sawchuk, Bill (June 9, 2017). "Building the Henley Bridge". St Catharines Standard. Archived from the original on August 24, 2017. Retrieved August 23, 2017.
  38. ^ a b Filey, Mike (June 6, 2010). "A Royal Trip Around T.O.". Life. The Toronto Sun. Sun Media. p. 37.
  39. ^ Stamp 1987, pp. 33–36.
  40. ^ Stamp 1987, p. 49.
  41. ^ a b c d Stamp 1987, pp. 50, 54.
  42. ^ "Division No. 6—Toronto". Annual Report (Report). Department of Highways. March 31, 1954. p. 61.
  43. ^ "Accident Alley Crashes Reduced by 50 Per Cent". The Globe and Mail. Toronto. July 21, 1956. p. 22.
  44. ^ a b c Stamp 1987, p. 56.
  45. ^ "Frederick G. Gardiner $13,000,000 Super-Highway Opened Today By Premier Frost". The Globe and Mail.
  46. ^ Clarke, W.A (March 31, 1954). "Report of the Chief Engineer". Annual Report (Report). Department of Highways. p. 12.
  47. ^ "Six-Mile Stretch of Highway 27 Will Be Expanded to Six Lanes". The Globe and Mail. Toronto. May 4, 1965. p. 5.
  48. ^ "Chronology". Annual Report (Report). Department of Highways. March 31, 1959. p. 267.
  49. ^ "Construction Report – Central Area". Annual Report (Report). Department of Highways. March 31, 1959. p. 26.
  50. ^ Blanchard, Douglas (April 30, 1952). "May Blow Up Bridge – Expert". Toronto Daily Star. pp. 1–3.
  51. ^ a b c Stamp 1987, pp. 59–61.
  52. ^ AADT Traffic Volumes 1955–1969 And Traffic Collision Data 1967–1969. Department of Highways. 1969. p. 10.
  53. ^ Shragge & Bagnato 1984, p. 81.
  54. ^ "Chronology". Annual Report (Report). Department of Highways. March 31, 1964. p. 296.
  55. ^ a b c d Stamp 1987, pp. 61–62.
  56. ^ a b c "Fast Facts from Hamilton's Past". MyHamilton. Archived from the original on September 5, 2006. Retrieved January 8, 2007.
  57. ^ "Division No. 6 – Toronto". Annual Report (Report). Department of Highways. March 31, 1960. p. 84. The construction of the [Shook's Hill] interchange will complete the facilities necessary for the complete control of access of the Queen Elizabeth Way between the Humber River and Highway 25
  58. ^ "Chronology". Annual Report (Report). Department of Highways. March 31, 1961. p. 269.
  59. ^ "Division No. 4 – Hamilton". Annual Report (Report). Department of Highways. March 31, 1965. p. 99.
  60. ^ "Construction – Central Area". Annual Report (Report). Department of Highways. March 31, 1963. pp. 31–32.
  61. ^ a b "Summary of the Report". Annual Report (Report). Department of Highways. March 31, 1967. p. xvi.
  62. ^ a b "Queen Elizabeth Way–Oakville–Fort Erie". Highway Construction Program (Report). Department of Highways. 1970–1971. p. xii.
  63. ^ "Queen Elizabeth Way – Oakville to Fort Erie". Highway Construction Program (Report). Ministry of Transportation and Communications. 1971–1972. p. xii.
  64. ^ a b "Drivers Face Three More Years of QE-27-401 Motoring Misery". The Toronto Star. July 22, 1969. p. 43.
  65. ^ "QE and 27 Interchange Opens Friday". The Toronto Star. November 13, 1969. p. 1.
  66. ^ Stamp 1987, p. 65.
  67. ^ Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1977. South-Central Ontario inset.
  68. ^ "Queen Elizabeth Way – Hamilton to Fort Erie". Highway Construction Program 1972–73 (Report). Ministry of Transportation and Communications. April 1972. p. xv.
  69. ^ a b Construction Program (Report). Ministry of Transportation and Communications. 1975–1976. p. xiii.
  70. ^ "From Saltfleet to Stoney Creek". Virtual Museum of Canada. Archived from the original on February 22, 2014. Retrieved February 6, 2014.
  71. ^ Construction Program (Report). Ministry of Transportation and Communications. 1976–1977. p. XIII.
  72. ^ Construction Program (Report). Ministry of Transportation and Communications. 1980–1981. p. XVI.
  73. ^ Shragge & Bagnato 1984, p. 83.
  74. ^ https://local-news.ca/2022/07/08/how-things-work-what-makes-a-good-bridge/
  75. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation and Communications. 1985–1986. p. X. ISSN 0714-1149.
  76. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation and Communications. 1989–1990. p. 9. ISSN 0714-1149.
  77. ^ https://www.thekingshighway.ca/PHOTOS/qew-578_xlg.jpg
  78. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation and Communications. 1991–1992. p. 8. ISSN 0714-1149.
  79. ^ Boyle, Theresa (April 1, 1995). "Rae Announces 407 Extension". News. The Toronto Star. p. A12. Rae also announced yesterday that the province will ask for private-sector proposals to design and construct the Burlington–Oakville link of Highway 403 as part of Highway 407.
  80. ^ Tait, Eleanor (October 23, 1993). "Sod Broken On QEW and Hwy. 403 Link". News. The Hamilton Spectator. p. T8.
  81. ^ https://local-news.ca/2022/07/08/how-things-work-what-makes-a-good-bridge/
  82. ^ https://www.thekingshighway.ca/PHOTOS/Hwy11photos10.htm
  83. ^ Settlement of Claim of Richard Prendiville (PDF) (Report). Ontario Superior Court of Justice. December 12, 2001. p. 7. Archived from the original (PDF) on July 27, 2014. Retrieved June 30, 2014.
  84. ^ Schankula, Tina (November 18, 1997). Transfer of Responsibility for Provincial Highways to Municipalities (Report). Ontario Federation of Agriculture.
  85. ^ "The Gardiner Expressway". Get Toronto Moving. Archived from the original on February 23, 2014. Retrieved June 7, 2014.
  86. ^ Hicks, Kathleen A. (2003). Clarkson and its Many Corners (PDF). Mississauga Library System. p. 258. ISBN 0-9697873-4-0. Archived (PDF) from the original on December 22, 2014. Retrieved February 16, 2014.
  87. ^ Ministry of Transportation of Ontario (2010). "2010 Completed Projects". Southern Highways Program 2011 to 2015 (PDF) (Report). Government of Ontario. p. 8. Archived from the original (PDF) on February 22, 2014. Retrieved February 16, 2014.
  88. ^ "Red Hill Opening Delayed". Local. The Hamilton Spectator. November 15, 2007. p. A4.
  89. ^ De Lazzer, Rachel (November 13, 2008). "Ramp Delay Puts Pressure on Woodward". Local. The Hamilton Spectator. p. A4.
  90. ^ https://www.thekingshighway.ca/PHOTOS/QEWphotos17.htm
  91. ^ Ministry of Transportation of Ontario (2010). "Red Hill Creek Expressway Interchange, QEW Burlington Street to Centennial Parkway". Southern Highways Program 2010–2014 (PDF) (Report). Government of Ontario. p. 6. Archived from the original (PDF) on February 22, 2014. Retrieved February 8, 2014.
  92. ^ "Archived copy" (PDF). Archived (PDF) from the original on July 29, 2021. Retrieved February 14, 2021.{{cite web}}: CS1 maint: archived copy as title (link)
  93. ^ https://www.thekingshighway.ca/PHOTOS-5/qew-745_lg.jpg
  94. ^ https://www.thekingshighway.ca/PHOTOS/QEWphotos4.htm
  95. ^ "Archived copy" (PDF). Archived (PDF) from the original on July 29, 2021. Retrieved February 6, 2021.{{cite web}}: CS1 maint: archived copy as title (link)
  96. ^ "New $11 million twin bridge at Bronte". InsideHalton.com. Archived from the original on February 8, 2021. Retrieved January 29, 2021.
  97. ^ Ministry of Transportation (November 29, 2010). "HOV Lanes Open On QEW Between Burlington and Oakville". Government of Ontario. Archived from the original on January 9, 2015. Retrieved February 8, 2014.
  98. ^ Phillips, Carol (December 17, 2004). "QEW Widening Starts With $15.2m Bridges Project". The Hamilton Spectator. p. A7.
  99. ^ "QEW widening right on schedule, MTO says". NiagaraThisWeek.com. Archived from the original on October 19, 2021. Retrieved January 29, 2021.
  100. ^ "Queen Elizabeth Way Widening in St. Catharines, Ontario Complete". Daily Commercial News. August 26, 2011. Archived from the original on February 22, 2014. Retrieved February 8, 2014.
  101. ^ "Province has 'fight on their hands' over proposed on-ramp: Mayor". Archived from the original on October 19, 2021. Retrieved January 27, 2021.
  102. ^ https://local-news.ca/2022/02/23/how-things-work-mechanically-stabilized-earth-walls/
  103. ^ http://www.botconstruction.ca/projects/recent_projects.html Archived March 24, 2020, at the Wayback Machine Projects – Bot Construction Group
  104. ^ "MTO 2015-2013" (PDF). Bot Construction Group. Archived from the original (PDF) on December 28, 2016. Retrieved March 14, 2020.
  105. ^ https://www.mcintoshperry.com/project/qew-hwy-403-interchange-expansion/
  106. ^ Central Region (June 2003). Transportation Environmental Study Report: Highway 403 and Queen Elizabeth Way from Trafalgar Road to Winston Churchill Boulevard (PDF). Ministry of Transportation of Ontario. Archived (PDF) from the original on March 7, 2021. Retrieved January 30, 2018.
  107. ^ "Archived copy". Archived from the original on November 24, 2019. Retrieved November 24, 2019.{{cite web}}: CS1 maint: archived copy as title (link)
  108. ^ "More than 80-year-old highway bridge west of Toronto spared tear down as province pledges to rehabilitate". December 18, 2019. Archived from the original on December 19, 2019. Retrieved January 30, 2021.
  109. ^ "QEW and Glendale Ave. Diverging Diamond Interchange". Niagara Region. Retrieved April 27, 2022.
  110. ^ Hocking, Kyle (September 23, 2022). "Ontario's first 'Diverging Diamond' interchange to open September 26". CityNews. Retrieved September 25, 2022.
  111. ^ https://www.qewdixie.com/
  112. ^ Benzie, Robert; Rider, David (November 27, 2023). "Ontario and Toronto agree to new deal, including the upload of DVP and Gardiner Expressway". Toronto Star. Retrieved November 27, 2023.
  113. ^ Carter, Adam (November 27, 2023). "Toronto uploads Gardiner, DVP to province, steps aside on Ontario Place redevelopment". CBC News. Retrieved November 27, 2023.
  114. ^ Edwards, Peter (June 23, 2016). "Toll Lanes Coming to QEW on Sept. 15". Toronto Star. Archived from the original on June 24, 2016. Retrieved June 23, 2016.
  115. ^ Kalinowski, Tess (December 7, 2015). "Toll Lanes Coming to the QEW". Toronto Star. Archived from the original on December 7, 2015. Retrieved December 7, 2015.
  116. ^ "HOT Lanes, Derided as 'Lexus Lanes,' Inch Ahead in Ontario". CBC News. CBC/Radio Canada. December 7, 2015. Archived from the original on December 8, 2015. Retrieved December 7, 2015.
  117. ^ "Road and expressway closures - road restrictions - street events". City of Toronto. Retrieved February 5, 2024.
  118. ^ Campbell, Caitlin (April 4, 2012). "Sabres vs Leafs Historic Rivalry". The Hockey Writers. Archived from the original on December 22, 2015. Retrieved August 23, 2015.

Bibliography[edit]

External links[edit]

KML is from Wikidata