Paul Huff Parkway

Coordinates: 35°12′39″N 84°51′47″W / 35.21083°N 84.86306°W / 35.21083; -84.86306
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
(Redirected from Sgt. Paul B. Huff Parkway)

Paul Huff Parkway
Map
Maintained byCity of Cleveland
Length2.42 mi (3.89 km)[1]
Coordinates35°12′39″N 84°51′47″W / 35.21083°N 84.86306°W / 35.21083; -84.86306
West end SR 60 in Cleveland
Major
junctions
I-75 in Cleveland
East end US 11 (SR 2) in Cleveland
Construction
Construction startOctober 1985
CompletionOctober 8, 1988

The C.S.M. Paul B. Huff Medal of Honor Memorial Parkway, more commonly known as Paul Huff Parkway or simply Paul Huff, is a major east–west thoroughfare which runs through northern Cleveland, Tennessee. While not a numbered highway, it serves as a connector between U.S. Route 11 (US 11) and State Route 60 (SR 60) as well as to Interstate 75 (I-75), and is one of the principal arterial roads in the city. The parkway is maintained by the city of Cleveland.

Paul Huff Parkway was originally constructed between 1985 and 1988 to serve as a connector between I-75 and an industrial area in the northeastern part of Cleveland. Since then, its corridor has grown to become the top producer of sales tax revenue in the city.[2] In 2022 the parkway had an annual average daily traffic (AADT) volume of 28,502 vehicles, one of the highest volumes on any road in the area. The road is named in honor of Paul B. Huff, a Cleveland-born U.S. Army soldier and Medal of Honor recipient who served in World War II.

Route description[edit]

Paul Huff Parkway is located entirely within the city limits of Cleveland in Bradley County, and is maintained by the City of Cleveland's Public Works Department. It is one of the few locally maintained and non-numbered routes that is part of the National Highway System (NHS), a national network of roads identified as important to the national economy, defense, and mobility.[3][4] In 2022, traffic volumes on the parkway ranged from 28,502 vehicles per day between Freedom Parkway and a connector road to the Bradley Square Mall, and 15,403 vehicles per day between Candies Creek Ridge Road near the western terminus and Adkisson Drive/Frontage Road.[5]

Paul Huff Parkway begins at an intersection with SR 60 (Georgetown Road) in the northwestern part of the city. An extension of the road exists approximately 18 mile (0.20 km) west of the intersection serving commercial properties. It then immediately crosses Candies Creek Ridge as an undivided four-lane road. At the bottom of the ridge it comes to an intersection with Adkisson Drive/Frontage Road, where a center turn lane begins. Adkisson Drive connects to Cleveland State Community College a short distance to the south. About 0.2 miles (0.32 km) later the road comes to an intersection with an interchange with I-75. Afterwards the road enters a large business area, skirting the edge of a few residential neighborhoods, and comes to an intersection with Peerless Road. About 14 mile (0.40 km) later it reaches Mouse Creek Road, which serves a number of residential neighborhoods to the north. The road then passes between an elementary school and a shopping center on the opposite side, before coming to an intersection with Freedom Parkway. It then passes a fire and ambulance station and crosses South Mouse Creek (commonly referred to as Mouse Creek) and the Cleveland/Bradley County Greenway. Ascending to the top of a minor ridge, the road intersects two unnamed connector roads that provide access to the Bradley Square Mall to the north and Hickory Grove Shopping Center and other commercial establishments to the south. Approximately 14 mile (0.40 km) later the road comes to an intersection with US 11 (SR 2, Keith Street/North Lee Highway) where it ends and continues east as Stuart Road.[6][7]

History[edit]

Background and construction[edit]

U.S. Army Command Sergeant Major Paul B. Huff (1918–1994), the parkway's namesake.

The parkway was first planned as part of a connector road between I-75 and industrial parks in the northeastern part of the city.[8][9] At the time, most of the land through which it passes was still farmland and woodlands, although residential development had already begun to occur nearby.[10] A project that preceded the parkway was the construction of Stuart Road (originally Industrial Park Road) between US 11 and Old Tasso Road in 1971,[11] and the extension of this road eastward to Michigan Avenue Road. A construction contract was awarded for the extension in December 1982 and the project was completed on June 27, 1984.[9] Many residents in the area were opposed to the parkway's construction, as they felt it would bring unwanted commercial development, which it eventually did. In response, the city and state reached a land use agreement in 1983 that required restrictions on access points on the stretch between I-75 and Mouse Creek Road, but still acknowledged that the areas would eventually be developed.[12][13][14] That same year, an activist group composed of local residents was formed to campaign against commercial rezoning along the road. Concerns were also raised about safety at the Mouse Creek Road intersection and the parkway's proximity to an elementary school, which prompted the state to agree to construct a berm separating the school.[12]

The contract for the section between Mouse Creek Road and US 11 was awarded in October 1985,[15] and the contract for the section between Adkisson Drive/Frontage Road and Mouse Creek Road, including the I-75 interchange, was awarded the following month.[16][17] Most of the latter section replaced part of Valley Head Road, a two-lane road that ran from the Adkisson Drive/Frontage Road intersection, passing under I-75, and ended near what is now the intersection with Peerless Road.[18][19] The section between Adkisson Drive/Frontage Road and Mouse Creek Road was completed in July 1987,[20] and the section between Mouse Creek Road and US 11 was completed the following month.[21][22] Construction for the section between SR 60 and Adkisson Drive/Frontage Road began in September 1987 and opened to traffic on October 8, 1988.[23][24] This project was very laborious, requiring work crews to blast out and move tons of earth and rock from Candies Creek Ridge, and stabilize the sides of the ridge along the road.[10][23] Not initially planned to take place for many more years, this project's acceleration was made possible by the passage of the Better Roads Program by the Tennessee General Assembly in 1986.[25] While the entire road was constructed by the Tennessee Department of Transportation (TDOT), maintenance was turned over to the city once construction was complete.[8][17]

The road was initially referred to as the Valley Head connector road. While still under construction, the local Veterans of Foreign Wars post began a push to name the road after Command Sgt. Maj. Paul B. Huff.[19][26] On October 5, 1987, the Bradley County Commission voted to name the road after Huff,[27] followed by the Cleveland City Commission one week later.[28] The parkway was dedicated in honor of Huff on Veterans Day, November 11, 1988,[19][29][30] and signs were installed along the roadside designating it as the C.S.M. Paul B. Huff Medal of Honor Memorial Parkway.[31][32]

Later history[edit]

In 1991, the Bradley Square Mall opened along the parkway, and much commercial development took place from the late 1990s to the mid-2000s.[33][34] These included several strip malls including the Hickory Grove Shopping Center as well as such stores as Lowe's and The Home Depot, and several restaurants and hotels. This resulted in a rapid increase in congestion and crashes, prompting some residents to oppose additional developments on the parkway.[14][35] Development also resulted in the parkway becoming the top source of sales tax revenue in the county.[2] From December 2003 to January 2004, traffic lights were installed at the intersections with the I-75 ramps.[36] An additional signal was installed in July 2004 at the intersection of Freedom Parkway, which was constructed to serve the new Home Depot.[37] In 2015, a short extension of the road was constructed west of SR 60.[38] In December of that year, the first traffic light in Cleveland with a flashing yellow arrow was installed at the intersection between the parkway and SR 60.[39] The speed limit was reduced from 50 to 45 miles per hour (80 to 72 km/h) in early 2016, and that same year, city officials began debating proposed safety improvements to the parkway.[40]

The parkway saw additional growth in commercial development in the early 2010s and from the late 2010s to the early 2020s.[41][42] These developments resulted in additional traffic congestion and hazards on the parkway, and further criticisms from motorists. By 2018, the crash rate on parts of the parkway was five times greater than that of the area, prompting the city to begin preliminary plans for safety improvements to the corridor.[43] In October 2019, the first blank-out sign in Cleveland, which restricts right turns on red when illuminated, was installed at the intersection of Paul Huff Parkway and Peerless Road.[44] On October 14, 2021, TDOT broke ground on a widening project on the connecting section of SR 60, which will include the construction of additional turn lanes at the intersection with the parkway.[45][46] In early 2022, the city announced that a total of nine improvement projects were planned for the parkway.[47] The first project, which took place from June 2022 to November 2023, expanded the Mouse Creek Road intersection by adding turn lanes to both routes and through lanes to the latter road.[48] The next project, which began in January 2024 and is expected to be complete eight months later, includes improvements to both intersections with the I-75 ramps.[49][50] Additional projects will include improvements to the intersections with Peerless Road and Frontage Road/Adkisson Drive, and the section between the latter intersection and I-75.[51][52]

Proposed extension[edit]

A residential construction boom began in the 1990s along Freewill Road, located approximately 34 mile (1.2 km) west of the western terminus of Paul Huff Parkway. In response to increased traffic commuting from this area into Cleveland, a concept for extending Paul Huff Parkway to Freewill Road arose. In 2003, a study conducted by TDOT found that the extension would be too expensive for the city to fund on its own.[53] The project again resurfaced in late 2008, when the city listed it in a request for federal funding under a then-proposed federal stimulus package in response to the Great Recession.[54][55] In early 2011, the Cleveland Area Metropolitan Planning Organization listed the extension as a possible future project pending federal funding.[56] In 2020, the extension received further momentum as additional residential growth occurred in the western part of the city.[57]

Major intersections[edit]

The entire route is in Cleveland, Bradley County.

mi[1]kmDestinationsNotes
0.000.00 SR 60 (Georgetown Road)Continues west to a dead end
0.921.48 I-75 – Chattanooga, KnoxvilleDiamond interchange; I-75 exit 27
2.423.89 US 11 (North Lee Highway/Keith Street/SR 2) / Stuart Road eastContinues east as Stuart Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also[edit]

References[edit]

  1. ^ a b Bureau of Transportation Statistics (June 13, 2022). "National Highway Planning Network" (Map). National Transportation Atlas Database. Washington, D.C.: United States Department of Transportation. Retrieved April 29, 2023.
  2. ^ a b Siniard, Tim; Mincey, Allen (December 17, 2021). "2021 Newsmakers: Paul Huff Parkway lands at No. 6". Cleveland Daily Banner. Archived from the original on December 18, 2021. Retrieved December 1, 2023.
  3. ^ National Highway System: Cleveland, TN (PDF) (Map). Federal Highway Administration. October 1, 2012. Archived (PDF) from the original on July 27, 2023. Retrieved July 27, 2023.
  4. ^ Natzke, Stefan; Neathery, Mike & Adderly, Kevin (August 26, 2010). "What is the National Highway System?". National Highway System. Federal Highway Administration. Archived from the original on September 24, 2012. Retrieved December 12, 2010.
  5. ^ Tennessee Department of Transportation. "Transportation Data Management System". ms2soft.com. MS2. Archived from the original on April 25, 2022. Retrieved November 27, 2021.
  6. ^ DeLorme (2017). Tennessee Atlas & Gazetteer (Map) (2017 ed.). 1 in:2.5 mi. Yarmouth, Maine: DeLorme. ISBN 978-1946494047.
  7. ^ Tennessee Department of Transportation Long Range Planning Division Office of Data Visualization (2018). Bradley County (PDF) (Map). Tennessee Department of Transportation. Archived (PDF) from the original on December 2, 2023. Retrieved December 1, 2023.
  8. ^ a b Norton, Rick (July 1, 1984). "Road project outlined". Cleveland Daily Banner. pp. 1, 3. Funding for the interchange work is 90 percent federal, and 10 percent state. Financing the connector road segments is by 75 percent state, and 25 percent local. Leonard Thurman, task force chairman, said the project is being completed via a united effort between Cleveland City and Bradley County governments, as well as well as the state and federal governments."
    "The Phase II segment will complete the actual interchange, and stretch the connector road from the new interchange to Mouse Creek Road, and on eastward to North Lee Highway at the same point as Stuart Road and/or Industrial Access Road. Once completed, Phase II will offer a connector all the way from the new interchange to Tasso Road and on eastward to Michigan Avenue Road.
  9. ^ a b Craig, David B. (June 27, 1984). "Stuart Road extended". Cleveland Daily Banner. pp. 1, 10. 'The first stage of the Interstate 75 Valleyhead Interchange and Connector Road project was officially completed this morning at a ribbon cutting ceremony. Cleveland and Bradley County public officials officially opened the extension of Stuart Road from Tasso Road to Michigan Avenue, ending the first phase of the project which will connect the interstate and Michigan Avenue."
    'One of the things this project will accomplish is this whole industrial area over here (on Stuart Road) will have a straight shot to the interstate without having the trucks go on Keith Street,' said Pat Lyle, executive vice president of the Cleveland/Bradley Chamber of Commerce.
  10. ^ a b Guthrie, Chet (July 23, 2015). "Busy street once site of the Guthrie farm". Cleveland Daily Banner. Cleveland, Tennessee. Archived from the original on July 26, 2015. Retrieved July 5, 2018.
  11. ^ "Harriman Firm Low Bidder on Interstate Link". The Knoxville News-Sentinel. May 5, 1971. p. 34. Retrieved December 1, 2023 – via Newspapers.com.
  12. ^ a b Norton, Rick (July 8, 1986). "Valleyhead connector zoning sparks discord". Cleveland Daily Banner. pp. 1, 11. CAVE is a citizens opposition group formed about three years ago when it was learned parts of the road might be zoned to commercial from residential-agriculture in order to allow limited business development along the proposed artery."
    "The citizens' group has not been heard from since 1983 because they were awaiting word from city officials about when the rezoning issue would be debated, Curtis told city commissioners."
    "In a prepared speech made before city fathers, Curtis reminded commissioners the CAVE organization took many actions in 1983 in opposition to the proposed connector road.
  13. ^ Seay, Kimberly (July 25, 1998). "Public hearing for parkway set for Monday". Cleveland Daily Banner. Retrieved December 1, 2023.
  14. ^ a b de Medici, Elizabeth (October 29, 2002). "Home Depot passes on first reading". Cleveland Daily Banner. Retrieved December 1, 2023.
  15. ^ "Notice to Contractors of State Highway Construction Bids to Be Received September 30, 1985". The Commercial Appeal. Memphis. August 30, 1985. p. A12. Archived from the original on October 26, 2023. Retrieved October 26, 2023 – via Newspapers.com.
  16. ^ "Notice to Contractors of State Highway Construction Bids To Be Received November 1, 1985". The Tennessean. Nashville. October 11, 1985. p. 11-C. Archived from the original on October 26, 2023. Retrieved October 26, 2023 – via Newspapers.com.
  17. ^ a b Norton, Rick (November 19, 1985). "City fathers are given update on road projects". Cleveland Daily Banner. p. 2. In another massive road project, Edwards reported the State of Tennessee Department of Transportation received a low bid of about $2,821,000 for the Valleyhead Connector Road from Adkisson Drive to Mouse Creek Road. This includes the new Interstate 75 Interchange.
  18. ^ United States Geological Survey (1976). East Cleveland, Tenn (Topographic map). 1:24,000. 7.5 Minute Series. Reston, Virginia: United States Geological Survey. Archived from the original on July 27, 2023. Retrieved July 27, 2023.
  19. ^ a b c Zolvinski, Steve (November 4, 1988). "Medal Of Honor Winner Huff To Be Honored With Road Name". The Leaf-Chronicle. p. 1B. Archived from the original on December 11, 2023. Retrieved December 1, 2023 – via Newspapers.com.
  20. ^ Norton, Rick (July 21, 1987). "I-75 interchange nearing completion". Cleveland Daily Banner. pp. 1, 14. Interstate 75 Valleyhead Interchange and the five-lane connector road west of Mouse Creek are now complete and the massive road project eastward to North Lee Highway is nearing completion.
  21. ^ Norton, Rick (August 18, 1987). "Craigmiles House use OK'd; part of I-75 connector opened". Cleveland Daily Banner. pp. 1, 9. In an unrelated development, city engineer Joe Edwards reported the Valley Head Road Interstate 75 interchange and connector road west of Mouse Creek Road has been opened. 'The connector east of Mouse Creek Road to North Lee Highway is only a matter of days away from completion,' Edwards told city fathers.
  22. ^ Norton, Rick (August 21, 1987). "Local road jobs talked". Cleveland Daily Banner. pp. 1, 12. Valley Head Road connector from Mouse Creek Road to North Lee Highway: The $2 million project was to be finished by the end of October, but it is already virtually completed.
  23. ^ a b Norton, Rick (September 22, 1987). "Michigan firm low bidder". Cleveland Daily Banner. p. 1. A Michigan contractor is the apparent low bidder for the western extension of the I-75 Valleyhead Connector Road from the new interchange to Georgetown Road (Highway 60).
  24. ^ Norton, Rick (October 11, 1988). "Huff Parkway western extension open". Cleveland Daily Banner. p. 2. City engineer Joe Edwards advised commissioners during their noon work session at The Chalet that the Georgetown Road western extension of Huff Parkway was officially opened Saturday and is already being heavily used.
  25. ^ Henry, Douglas; Darnell, Riley; Bragg, John; Robinson, C. Robb (April 1, 1986). 1986 Road Program (PDF) (Report). Tennessee Department of Transportation. Archived (PDF) from the original on January 23, 2020. Retrieved April 26, 2020.
  26. ^ Norton, Rick (September 29, 1987). "City asked to rename street for Medal of Honor winner". Cleveland Daily Banner. pp. 1, 13. In-between commission meetings Monday, the idea of naming the new five-lane Interstate 75 Valleyhead Interchange connector road in honor of Huff was presented, but not officially discussed by all five city commissioners.
  27. ^ Mincey, Allen (October 6, 1987). "County votes to name road after war hero Paul B. Huff". Cleveland Daily Banner. pp. 1, 9. The Bradley County Commission voted unanimously Monday night to honor Sgt. Paul B. Huff, World War II veteran and the Congressional Medal of Honor winner, with the renaming of the Valley Head Connector, pending approval by both the Cleveland City Commission and the state legislature."
  28. ^ Norton, Rick (October 13, 1987). "City okays road honoring Paul Huff". Cleveland Daily Banner. p. 1. Following the lead of Bradley County Commission, members of Cleveland City Commission on Monday okayed a request to rename the Valley Head Connector in honor of Sgt. Paul B. Huff, a World War II veteran who became the first local native to receive the Congressional Medal of Honor.
  29. ^ Davis, David (August 11, 2013). "Honoring a national hero". Cleveland Daily Banner. Archived from the original on July 14, 2014. Retrieved July 8, 2014.
  30. ^ "Command Sergeant Major (Retired) Paul B. Huff". 509thgeronimo.com. 509th Infantry Regiment. 2006. Archived from the original on November 7, 2017. Retrieved November 3, 2017.
  31. ^ Google (September 2022). "Paul Huff Parkway NW". Google Street View. Google. Retrieved March 12, 2024.
  32. ^ Google (September 2022). "954 Paul Huff Parkway NW". Google Street View. Google. Retrieved March 12, 2024.
  33. ^ "Work begins on Hickory Grove Center; tenants are announced". Cleveland Daily Banner. June 4, 1999. Retrieved December 1, 2023.
  34. ^ Graves, Brian (February 10, 2016). "Bradley Square Mall turns 25". Cleveland Daily Banner. Archived from the original on February 11, 2016. Retrieved November 13, 2017.
  35. ^
  36. ^ "Work started on traffic signals". Chattanooga Times Free Press. December 25, 2003. Archived from the original on December 11, 2023. Retrieved December 1, 2023.
  37. ^ Harris, Ryan (July 24, 2004). "Activation of traffic signal set for Tuesday". Cleveland Daily Banner. Retrieved December 1, 2023.
  38. ^ Leach, Paul (August 25, 2015). "Cleveland hits brakes on Paul Huff Parkway extension". Chattanooga Times Free Press. Archived from the original on November 7, 2017. Retrieved November 3, 2017.
  39. ^ "'Flashing yellow arrow' introduced to city signals". Cleveland Daily Banner. December 2, 2015. Archived from the original on December 12, 2015. Retrieved December 1, 2023.
  40. ^ Love, Joyanna (April 15, 2016). "Huff traffic safety debated by city". Cleveland Daily Banner. Retrieved December 1, 2023.
  41. ^ Higgins, Randall (September 3, 2011). "Cleveland boom; Paul Huff Parkway sees increasing development". Chattanooga Times Free Press. Archived from the original on December 11, 2023. Retrieved December 1, 2023.
  42. ^ Bowers, Larry C. (December 18, 2019). "No. 8: Huff Puffs". Cleveland Daily Banner. Archived from the original on December 18, 2019. Retrieved December 1, 2023.
  43. ^ Siniard, Tim (August 14, 2018). "City Council mulls Paul Huff lane changes". Cleveland Daily Banner. Archived from the original on August 14, 2018. Retrieved December 1, 2023.
  44. ^ "City Installs First Blank-Out Sign" (Press release). City of Cleveland, Tennessee. October 9, 2019. Archived from the original on May 12, 2021. Retrieved December 1, 2023.
  45. ^ Benton, Ben (October 14, 2021). "Cleveland's $54 million State Route 60 widening project breaks ground". Chattanooga Times Free Press. Archived from the original on October 14, 2021. Retrieved October 14, 2021.
  46. ^ "State Route 60 from North of I-75 to State Route 306 (Eureka Road)". tn.gov. Nashville: Tennessee Department of Transportation. Archived from the original on October 5, 2023. Retrieved December 1, 2023.
  47. ^ Siniard, Tim (March 2, 2022). "City cracks $100 million in infrastructure enhancements". Cleveland Daily Banner. Retrieved December 1, 2023.
  48. ^ Siniard, Tim (November 16, 2023). "Mouse Creek intersection features extra lanes, new traffic arms". Cleveland Daily Banner. Archived from the original on December 11, 2023. Retrieved December 1, 2023.
  49. ^ "Roadway Activity Report for parts of the Lower East and Upper Cumberland (January 18 - 24, 2024)" (Press release). Nashville: Tennessee Department of Transportation. January 19, 2024. Archived from the original on February 29, 2024. Retrieved February 29, 2024.
  50. ^ Mosley, Sheridan (November 22, 2023). "Rep. Dan Howell shares updates on local road construction projects". WCLE-FM. Cleveland, Tennessee. Archived from the original on February 29, 2024. Retrieved February 29, 2024.
  51. ^ Bromley, Grant (November 4, 2023). "Fivas tells Rotarians of expansion projects in Cleveland". Cleveland Daily Banner. Archived from the original on December 11, 2023. Retrieved December 1, 2023.
  52. ^ "Paul Huff Parkway Improvements". The Cleveland Connector. City of Cleveland, Tennessee. Summer 2021. p. 1. Archived from the original on March 21, 2023. Retrieved March 6, 2024.
  53. ^ Higgins, Randall (July 6, 2003). "Paul Huff Parkway extension costs considered too expensive". Chattanooga Times Free Press. Retrieved December 1, 2023.
  54. ^ Davis, David (December 31, 2008). "Cleveland seeking $62 million in federal stimulus project money". Cleveland Daily Banner. Retrieved March 6, 2024.
  55. ^ Higgins, Randall (February 14, 2009). "Cleveland seeks flood study funds". Chattanooga Times Free Press. Retrieved December 1, 2023.
  56. ^ Higgins, Randall (January 15, 2011). "Plan may include Huff Parkway extension". Chattanooga Times Free Press. Retrieved December 1, 2023.
  57. ^ Siniard, Tim (July 30, 2020). "Extending Paul Huff Parkway on the western end a possibility". Cleveland Daily Banner. Archived from the original on August 1, 2020. Retrieved December 1, 2023.