Soekarno–Hatta Airport Skytrain

From Wikipedia, the free encyclopedia
Soekarno–Hatta Airport Skytrain
Soekarno-Hatta Airport Skytrain used for airport terminals shuttle service
Overview
Native nameKalayang Bandara Internasional Soekarno-Hatta
StatusOperational
OwnerAngkasa Pura II
LocaleSoekarno–Hatta International Airport serving Jakarta
Stations4
Service
TypeAutomated people mover (APM)
Operator(s)Angkasa Pura II
Rolling stockWoojin Automated People Mover System
History
Opened17 September 2017; 6 years ago (2017-09-17)[1]
Technical
Line length3.05 km (1.90 mi)
ElectrificationThird rail
Route map

Soekarno–Hatta Terminal 3
Soekarno–Hatta Terminal 2
Soekarno–Hatta Terminal 1
Integrated Terminal Building
SHIA
Skytrain Depot

The Soekarno–Hatta Airport Skytrain (Indonesian: Kalayang Bandara Soekarno–Hatta) is a semi-driverless 3.05 kilometre Automated People Mover System (APMS) which connects Soekarno-Hatta Airport Terminals 1, 2, 3 and SHIA railway station, free of charge.[1] Trains are spaced 5 minutes apart, with 7 minutes needed to get from Terminal 1 to Terminal 3.[2][3]

Rolling stock[edit]

Automated People Mover System at Terminal 1 Station

The system uses Airport Automated People Mover System rubber-tyred metro manufactured by state-owned enterprise PT LEN Industri in cooperation with South Korean Woojin Industries.[4] Three train units operate with each train unit consisting of two cars. They are capable to transport 176 passengers in one trip. The train travels at a speed of 60 kilometers per hour. Each trainset is equipped with automated guide-way transit (AGT) technology. The system is capable for automated operations, but its implementation have been delayed pending trials conducted by LEN Industri.

Stations[edit]

Skytrain Terminal 3 Station

There are 4 stations served by Airport Skytrain; Terminal 1, 2 and 3 each has one station. The airport shuttle Skytrain is integrated to SHIA railway station, from where passengers can conveniently travel to–and from–Jakarta city center by Soekarno–Hatta Airport Rail Link.

Skytrain operating schedule is accessible online and through the Indonesia Airport website and smartphone application, the time was variable . All Skytrain stations are equipped with platform screen doors and have information screens displaying real-time arrival time of the next train. Skytrain has been operational since 17 September 2017.[5]

Station Transfer/Notes
Terminal 3 Terminal station

Airport interchange Soekarno-Hatta Terminal 3

Bus Terminal Terminal 3 Airport Bus Terminal

Terminal 2 Airport interchange Soekarno-Hatta Terminal 2

Bus Terminal Terminal 2 Airport Bus Terminal

Integrated Building SHIA

Mainline rail interchange Soekarno–Hatta Airport Rail Link

Terminal 1 Terminal Station

Airport interchange Soekarno-Hatta Terminal 1

Future expansion[edit]

Skytrain passengers

The Skytrain will be extended to planned new Terminal 4 and Sky Hub (commercial area) in Phase 2. Then it will be connected to Integrated Building Terminal, Terminal 1, 2 and 3.[6]

References[edit]

  1. ^ a b "Soekarno–Hatta International Airport Skytrain is officially launched". The Jakarta Post. Retrieved 2018-05-04.
  2. ^ "Skytrain Trials at Soekarno Hatta Airport to Begin in Mid August". Tempo. Retrieved 30 August 2017.
  3. ^ "Skytrain to connect terminals at Soekarno–Hatta Airport". The Jakarta Post. Retrieved 30 August 2017.
  4. ^ "Airport skytrain to be operated by crew for first six months". The Jakarta Post. Retrieved 2018-05-04.
  5. ^ "Skytrain to link with Dukuh Atas in December". The Jakarta Post. Retrieved 18 September 2017.
  6. ^ "Soekarno-Hatta Airport Airport Train officially operated for public". angkasapura2.co.id. Retrieved 29 December 2017.

External links[edit]