Central Luzon Link Expressway

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Central Luzon Link Expressway
Route information
Length: 66.4 km (41.3 mi)
Major junctions
East end: San Jose City, Nueva Ecija
West end: Tarlac City, Tarlac
Location
Major cities:
Towns:
Highway system
Highways | Expressways

Central Luzon Link Expressway (CLLEx) is a toll road currently under construction in Central Luzon region that will connect the Subic–Clark–Tarlac Expressway (SCTEx) to the currently under-construction North Luzon East Expressway in Cabanatuan towards San Jose, Nueva Ecija.[1]

It forms a lateral (east-west) link of expressway network that diverges from SCTEx at 2.5 km north of Luisita Interchange and traverses flat plain of Central Luzon in the east-west direction, then passes Cabanatuan and ends at San Jose. Phase I ends at Cabanatuan and Phase II at San Jose. The expressway parallels with Tarlac-Santa Rosa Road but the eastern terminus is not located at the town of Santa Rosa, Nueva Ecija.

Interchanges[edit]

Phase I - 30.7 km.
Phase II - 35.7 km.
Total Length - 66.4 km.

References[edit]

External links[edit]