Tianjin–Weifang–Yantai high-speed railway

From Wikipedia, the free encyclopedia
Tianjin–Weifang–Yantai
high-speed railway
津潍烟高速铁路
Overview
StatusUnder construction
Termini
Stations20
Service
Operator(s)CR Beijing Group & CR Jinan Group
History
Opened2024 (Weifang–Yantai section)[1]
2027 (Tianjin–Weifang section)[2]
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

km
Binhai West EMU depot
Binhai West
link to Tianjin–Qinhuangdao HSR
Tanggu
0.000
Binhai
(start of the line)
32.438
Dagang East (signal station)
38.600
Binhai East
58.950
Binhai South
Shuozhou–Huanghua railway
(Shenchi South ↔ Huanghua Port)
Xiaokangzhuang–Huanghua railway
(Xiaokangzhuang ↔ Huanghua Port)
100.325
Huanghua North
Shijiazhuang–Cangzhou ICR to Hengshui North
104.148
Qianmiaocun (signal station)
130.870
Haixing West
176.360
Wudi
224.505
Binzhou
Huanghua–Dajiawa railway to Huanghua South
Dongying Yellow River railway bridge
273.678
Dongying South
Qingzhou–Yangkou railway
(Qingzhou South ↔ Yangkou)
343.410
Shouguang East
372.082
Huangbucun (signal station)
376.351
Weifang North
Weifang–Sucheng HSR to Yanghe North
km

Tianjin–Weifang–Yantai high-speed railway is a high-speed railway currently under construction in China. The railway will have a design speed of 350 kilometres per hour (220 mph). Weifang–Yantai section of the railway is expected to open in 2024[1] and Tianjin–Weifang section is expected to open in 2027.[2]

History[edit]

On June 29, 2020, the feasibility study for the section from Weifang to Yantai was approved.[3] The feasibility study for the section from Binhai railway station in Tianjin to Weifang was approved in January 2022.[4][5] Construction of Tianjin–Weifang section started on 6 November 2022.[6]

Route[edit]

Between Weifang North and Changyi, the route shares the line with the Weifang–Laixi high-speed railway.

Stations[edit]

Station Name Chinese Metro
transfers/connections
China Railway
transfers/connections
Binhai 滨海 Tianjin Metro (Tianjin Metro Group Co., Ltd.)  B1  (U/C)  Z4  (U/C) Beijing–Tianjin intercity railway
Binhai East 滨海东
Binhai South 滨海南
Huanghua North 黄骅北
Haixing West 海兴西
Wudi 无棣
Binzhou 滨州
Dongying South 东营南
Shouguang East 寿光东
Weifang North 潍坊北 Jinan–Qingdao high-speed railway
Weifang–Laixi high-speed railway
Changyi 昌邑 Weifang–Laixi high-speed railway
Pingdu Xinhe[1] 平度新河
Laizhou[1] 莱州
Zhaoyuan[1] 招远
Longkoushi 龙口市
Penglaishi 蓬莱市
Yantai West[7][a] 烟台西
Zhifu 芝罘 Qingdao–Rongcheng intercity railway (Yantai Branch)
Fushan South 福山南
Yantai South 烟台南 Qingdao–Rongcheng intercity railway
  1. ^ The station is formerly known as Dajijia when the construction starts, and renamed to Yantai West in 2022.[7]

References[edit]

  1. ^ a b c d e "平度新河站、莱州站、招远站三站同时封顶 潍烟高铁距离开通又近一步". 2022-10-10. Archived from the original on 2022-11-06.
  2. ^ a b "济滨高铁、津潍高铁有望2026年、2027年底前建成通车".
  3. ^ "潍烟铁路获山东省发改委批复立项,总投资524亿元". www.thepaper.cn. Retrieved 2020-08-10.
  4. ^ "国家发展改革委关于新建天津至潍坊高速铁路可行性研究报告的批复". National Development and Reform Commission. 2022-01-10. Retrieved 2022-01-17.
  5. ^ "总投资1145.4亿元!津潍高铁获国家发改委批复立项". Archived from the original on 2022-01-14. Retrieved 2022-01-17.
  6. ^ "天津首次!这两条高速铁路同日开建". 2022-11-06. Archived from the original on 2022-11-06.
  7. ^ a b "潍烟高铁烟台西站站房工程封顶". 2022-11-30.