Jump to content

Bowesville station

Coordinates: 45°17′33.8″N 75°37′56.7″W / 45.292722°N 75.632417°W / 45.292722; -75.632417
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Lol1VNIO (talk | contribs) at 11:40, 5 August 2022 (Archive). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bowesville
General information
Coordinates45°17′33.8″N 75°37′56.7″W / 45.292722°N 75.632417°W / 45.292722; -75.632417
Owned byOC Transpo
PlatformsSide platforms
Tracks2
Construction
Structure typeSurface
Parking800 spaces
AccessibleYes
History
Opening2023
Future services
Preceding station OC Transpo Following station
Limebank
Terminus
Line 2
Reopens 2024
Leitrim
toward Bayview

Bowesville is an under construction station on the Trillium Line in Ottawa, Ontario. It is being constructed as part of the Stage 2 O-Train expansion and is scheduled for completion in 2023. The station will consist of two side platforms and is located southeast of the intersection of Bowesville and Earl Armstrong roads.[1]

References

  1. ^ "Trillium Line South Extension". ottawa.ca. November 19, 2019. Archived from the original on May 7, 2020. Retrieved May 2, 2020.