Jump to content

Innovia APM 200

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Cyfal (talk | contribs) at 01:16, 16 October 2022 (spelling (WP:Typo Team)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bombardier Innovia APM 200 on the PHX Sky Train

The Innovia APM 200 was an automated people mover system (APM) manufactured and marketed by Alstom. It was second generation of Innovia APM offered and is part of Alstom's Innovia series of fully automated transportation systems.

The Innovia APM 200 was the successor to the Innovia APM 100 and was succeeded by Innovia APM 300. Designed in response to the growing popularity of the Crystal Mover, the advancements the Innovia APM 200 made over the Innovia APM 100 included a new aerodynamic design, allowing for greater speeds and tighter turns. The Innovia APM 200 also featured full composite construction, and multiple end cap options.

Specifications

Each individual Innovia APM 200 car weighs 14.4 tonnes (15.9 short tons; 14.2 long tons) empty, with a weight of 21.627 tonnes (23.840 short tons; 21.285 long tons) with passengers. The car is configured to allow eight passengers to sit down, while 92 additional passengers can stand at a density of 2.7-square-foot (0.25 m2) per passenger. If there is enough room two wheelchairs can fit in each Innovia APM 200 car, in addition to sitting and standing room. A maximum of four cars can be coupled together in a single train. Each car is air-conditioned, lit, and includes tinted windows attached to the composite shell body.

Implementations

The Track Transit System at London Heathrow Airport
  • DFW Skylink (2005) – 4.81 miles (7.74 km), 10 stations, 64 vehicles[1]
  • Heathrow Terminal 5 Transit (2008) – airside system, 0.67 kilometres (0.42 mi), 3 stations, 10 vehicles[1][2]
  • PHX Sky Train (2013) – to be built in three phases.[1] Phase 1 opened April 2013, connecting the Valley Metro Rail station to the East Economy Parking Garage and Terminal 4. Phase 1A opened December 2013 extending the line to Terminal 3, with a covered walkway to Terminal 2. Phase 2, will extend the line to the Rental Car Center, and is expected to open in 2022. When fully completed, the length of the line will be 2.17 miles (3.49 km), will have 5 stations, and a total of 18 vehicles.[3]

References

  1. ^ a b c "Worldwide projects". Bombardier Transportation. Retrieved 29 October 2019.
  2. ^ James, Kevan (2017). Heathrow Airport: An Illustrated History. Fonthill Media. p. 219.
  3. ^ "PHX Sky Train".