Line 1 (Chengdu Tram)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by John B123 (talk | contribs) at 22:49, 31 January 2021 (Added tags to the page using Page Curation (refimprove)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chengdu Tram Line 1
Overview
LocaleChengdu
Transit typeTram
Number of lines1
Number of stations16
Operation
Began operationUnder planning
Technical
System length9.62 km
Track gaugeStandard gauge 1,435 mm (4 ft 8+12 in)

Chengdu Tram Line 1 is under planning. It was once named Yizhou Avenue Tram, with a total length of 9.62 kilometers and 16 stations. The route is planned to be laid along Yizhou Avenue, starting from Chengdu South railway station and arriving at Huayang Hualong Bridge.[1] At the beginning of 2015, the route of the Yizhou Avenue tram demonstration line (Line 1) was announced. In mid-2015, the official website of Chengdu Metro issued the "Announcement of the General Contracting Bidding for the Survey and Design of the Chengdu Yizhou Avenue Tram Demonstration Line". At the end of 2015, the names and locations of 16 stations on the line were announced.[2] In January 2016, in order to alleviate the traffic pressure in the southern part of Chengdu, the Chengdu Tram Line 1 project announced the suspension of construction.

Chengdu Tram Line 1 would start at Chengdu South Railway Station and ends at Huayang, with a total of 16 stations. The total length of the line is 9.62 kilometers, of which the elevated section is 0.91 kilometers and the ground section is 8.71 kilometers.[2]

References

  1. ^ 成都市政府 (2015-10-09). "成都有轨电车蓉1号线16个车站名称公示". Retrieved 2017-12-29.
  2. ^ a b 彭亮 (2015-11-13). "有轨电车蓉1号线16站名确定 计划2018年1月开通".

See also