Jump to content

List of ship commissionings in 1988

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Qwerfjkl (bot) (talk | contribs) at 19:14, 12 March 2022 (Changing short description "Wikipedia list article" to "none" per WP:SDNONE (via Bandersnatch)). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

The list of ship commissionings in 1988 includes a chronological list of all ships commissioned in 1988.

Operator Ship Flag Class and type Pennant Other notes
30 May  Spanish Navy Príncipe de Asturias STOL aircraft carrier R11
November  People's Liberation Army Navy Changzheng 4 Type 091 submarine 404 date of initial operational capability

See also

[edit]