Jump to content

Postmortem documentation

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Kessalya (talk | contribs) at 15:13, 3 February 2021 (Updated main definition to emphasize the fact that a post-mortem is relative to failures). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

A project post-mortem is a process used to identify the causes of a project failure (or significant business-impairing downtime), and how to prevent them in the future. This is different from a Retrospective, in which both positive and negative things are reviewed for a project.

The Project Management Body of Knowledge (PMBOK) refers to the process as lessons learned.[1] Project post-mortems are intended to inform process improvements which mitigate future risks and to promote iterative best practices. Post-mortems are often considered a key component of, and ongoing precursor to, effective risk management.[2]

Elements of a project post-mortem

Post-mortems can encompass both quantitative data and qualitative data. Quantitative data include the variance between the hours estimated for a project and the actual hours incurred. Qualitative data will often include stakeholder satisfaction, end-user satisfaction, team satisfaction, potential reusability and perceived quality of end-deliverables.

Role of time tracking

Successful analysis of project estimate variance is dependent on accurate time tracking. The greater the granularity with which time is tracked, the more detailed an analysis can be performed during the project post-mortem.

See also

References

  1. ^ Lessons Learned on the website of the Center for Disease Control, read 3. September 2015.
  2. ^ IEEE: A defined process for project post mortem review