Jump to content

Advanced Technology Vehicles Manufacturing Loan Program

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Citation bot (talk | contribs) at 08:51, 2 July 2022 (Add: date. | Use this bot. Report bugs. | Suggested by Abductive | Category:Wikipedia articles in need of updating from May 2022 | #UCB_Category 118/645). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Energy Secretary Chu announced the loans to Ford employees in Detroit

Advanced Technology Vehicles Manufacturing (ATVM) Loan Program is a $25 billion direct loan program funded by Congress in fall 2008 to provide debt capital to the U.S. automotive industry for the purpose of funding projects that help vehicles manufactured in the U.S. meet higher mileage requirements and lessen U.S. dependence on foreign oil. Of the 108 requests made, 5 were approved to receive $8.4 billion, with the majority of that amount under repayment.[1]

Background and criteria

The loan program was authorized under section 136 of the Energy Independence and Security Act of 2007, which provided the program with $25 billion in loan authority, supported by a $7.5 billion appropriation to fund the credit subsidy, or the 30% risk profile expected for projects of this type. To qualify, automakers and eligible component manufacturers must promise to increase the fuel economy of their products by 25% over the average fuel economy of similar 2005 models, and apply the loans to future investments "reasonably related to the reequipping, expanding, or establishing a manufacturing facility in the U.S." In distributing the loans the DOE may decide which technologies it believes are most promising and deserving of assistance. Loan recipients must also be "financially viable" for the length of the loan.[2] Given 60 days by congressional statute to issue an interim final rule, the Department of Energy (DOE),[3] responsible for overseeing the program, finalized the rule 36 days later on November 5, 2008 (compared to 18 months usually needed for such rule making). This program is unrelated to the United States Treasury Department's Troubled Asset Relief Program (TARP) which has been providing bailout funding to two of the big three U.S. automakers to reduce the effects of the 2008–10 automotive industry crisis on the United States. The two programs were enacted during the Automotive industry crisis of 2008–10, but with different purposes.[4]

It has been speculated that at least two of the Big Three U.S. automobile manufacturers may not be able to qualify for this program because of its fuel economy and financial solvency requirements.[2]

In November 2008, the auto industry began lobbying for the $25 billion to be loaned immediately, as well as another $25 billion to be loaned later to cover retirees health care costs.[2]

As originally worded, the program was applicable only to four-wheeled passenger vehicles. In October 2009, a bill sponsored by California Representatives Brian Bilbray and Adam Schiff was passed extending the program's coverage to include high mileage (75 mpg equivalent) two- and three-wheeled vehicles.[5]

DOE's Alternative Vehicle Technologies Awards

The U.S. Department of Energy (DOE) announced in December 2008 the selection of six cost-shared research projects for the development and demonstration of alternative vehicle technology projects totaling a DOE investment of up to $14.55 million over three years, subject to annual appropriations. Private sector contributions will further increase the financial investment for a total of up to $29.3 million. The selections announced are part of DOE’s continuing work to develop high efficiency vehicle technologies and are not part of the recently announced $25 billion Advanced Technology Vehicles Manufacturing Loan Program. These projects were selected under three diverse topic areas: lithium-ion battery materials and manufacturing (3M Company for developing advanced anode; BASF Catalyst for domestic production of low cost cathode materials and FMC Corporation for scaling up production of stabilized lithium metal powder for high energy cathodes); thermoelectric heating, ventilation and air conditioning (TE HVAC system); and aerodynamic heavy-duty truck trailers (Navistar International Corporation).[6]

Conditional loans

Overview

ATVM budget[7]

  $5,907 M September 2009: Ford (24%)
  $1,448 M January 2010: Nissan (6%)
  $529 M April 2010: Fisker (2%)
  $465 M January 2010: Tesla (2%)
  $50 M March 2011: Vehicle Production Group (1%)
  $16,600 M 2015: Remaining authority (66%)

USDOE announced in 2009 $8.4 billion in conditional loan agreements for Ford Motor Company; Nissan North America, Inc.; Tesla Motors, Inc. and Fisker Automotive to fund the development of advanced vehicle technologies. Additionally, DOE has spent approximately $3.3 billion on federal credit subsidies costs in order to secure the loans for the few approved companies.[7][8] The loan commitments include a $5.9 billion loan to Ford for upgrading factories in five states to produce 13 more fuel-efficient models, a $1.6 billion loan to Nissan to build advanced electric vehicles and advanced batteries, and a $465 million loan to Tesla Motors to manufacture its new electric sedan. These are the first conditional loans released under DOE's Advanced Technology Vehicles Manufacturing (ATVM) Loan Program, which is using an open, competitive process to provide about $25 billion in loans to companies that produce cars or vehicle components in the United States. To qualify, companies must propose projects that increase fuel economy to at least 25% above 2005 fuel economy levels.[9] By 2014, Ford and Nissan were making payments, while Tesla paid back the loan in 2013.[10] Nissan eventually repaid the loan in 2017.[11] The program has earned the government nearly $3 billion in interest. The program had not issued new loans since 2011, and six applicants were seeking around $12 billion of loans in early 2020. The federal government has considered shutting down the program under the Trump Administration.[11]

Ford

Ford Motor Company will receive its loans through 2011, using the funds to upgrade its engine plants in Dearborn, Michigan; Cleveland, Ohio; and Lima, Ohio, and to upgrade its transmission plants in Livonia, Michigan; Sterling Heights, Michigan; and Sharonville, Ohio. Ford will also upgrade its assembly plants in Chicago, Illinois; Louisville, Kentucky; Dearborn, Michigan; Wayne, Michigan; and Kansas City, Missouri, converting two of the truck factories into assembly plants for cars. In addition, the Ford loans will finance advances in traditional combustion engines and electrified vehicles[12] and help raise the fuel efficiency of more than two dozen popular models.[9] The V6 EcoBoost engine benefited from the loan, and is installed in many cars as well as over 500,000 F-150, saving 268 million gallons of gasoline by 2014.[13] Ford expects to pay the rest of the loan by 2023.[11]

Nissan

Nissan aims to manufacture a cost-competitive electric vehicle with a lithium-ion battery pack in Smyrna, Tennessee, and plans to eventually reach a production capacity of 150,000 vehicles per year.[9] The Nissan Leaf is produced at Nissan's Smyrna assembly plant since 2013, along with cells for its batteries.[14] Nissan repaid the loan in 2017.[11]

Tesla

Tesla Motors will use its funding (US$465 million) to finance a California-based manufacturing facility for the Tesla Model S sedan, an all-electric sedan that can be recharged at a conventional 120-volt or 240-volt outlet. Production will begin in 2011 and ramp up to 20,000 vehicles per year by the end of 2013.[9][15][16] Tesla repaid the loan in May 2013, and was the first car company to have fully repaid the government, while Ford, Nissan and Fisker had not up to that moment.[17]

Fisker Automotive

The fourth conditional commitment that the Department of Energy has entered into under the ATVM Loan program is a $528.7 million loan for Fisker Automotive for the development of two lines of plug-in hybrids by 2016.[18] Fisker received $192 million, before losing access to the rest of the loan. Fisker later defaulted once the company began to suffer from financial issues. In 2013, the company declared voluntary bankruptcy.[19] The DOE would ultimately reclaim $28 million from Fisker for a total of $53 million recovered of its $192 million loan. The money came from a three-day auction in which Chinese auto parts supplier Wanxiang Group received court approval on February 18, 2014, to buy the assets of Fisker with a bid of $149.2 million against a rival bid from Hong Kong billionaire Richard Li.[7]

Syrah Technologies

In 2022, the program granted $107 million to Syrah Technologies to assist its graphite-based active anode material Vidalia Facility in Louisiana. The grant was the first in over 10 years.[20]

Unsuccessful applications

About 108 requests were made to the program by 2010, but few were approved. Many of the companies which were denied loans have since gone out of business. Among the applicants denied were:[1]

  • A loan request under this program was denied for Carbon Motors Corporation in March 2012 after the latter had spent 2 years prior addressing the DOE's concerns.[21]
  • Aptera Motors' initial application was denied because its product was a three-wheeled vehicle; the wording on the program was modified to allow high-mileage three-wheelers and Aptera reapplied, however the company went out of business before the DOE responded to their second application.
  • Brammo asked for $45 million, application was rejected.
  • Local Motors' Local Motors initial application (filed in 2009) was rejected, company said to be working on resubmission.
  • Bright Automotive, who filed their application in 2008, went out of business in March 2012 after waiting 4 years for the DOE to respond and being unable to sustain continued operations.[21]
  • Coda Automotive, ultimately went into Chapter 11 bankruptcy on May 1, 2013.[22]
  • XP Vehicles - sued the U.S. Department of Energy [23][needs update]

See also

References

  1. ^ a b Schreiber, Ronnie (18 May 2013). "Has the Dept of Energy's Advanced Technology Vehicle Manufacturing Program Been a Failure? Not Really". The Truth About Cars. Archived from the original on 28 September 2015. Retrieved 27 November 2016.
  2. ^ a b c "Why $25 billion bailout may not help strapped automakers". Csmonitor.com. 2008-11-14. Retrieved 2014-08-21.
  3. ^ "Fact Sheet: Advanced Technology Vehicles Manufacturing Loan Program" (PDF). Atvmloan.energy.gov. Archived from the original (PDF) on 2010-05-27. Retrieved 2014-08-21.
  4. ^ Amadeo, Kimberly (25 November 2016). "Auto Industry Bailout (GM, Ford, Chrysler)". The Balance. Archived from the original on 28 November 2016. Retrieved 28 November 2016.
  5. ^ Sam Abuelsamid (2009-10-30). "President signs bill expanding ATVM program to three wheelers". Green.autoblog.com. Retrieved 2014-08-21.
  6. ^ "DOE Announces up to $29.3 Million in Projects for Research, Development, and Demonstration of Alternative Vehicle Technologies". United States Department of Energy. 2008-12-03. Archived from the original on 2011-07-21. Retrieved 2011-02-10.
  7. ^ a b c Bill Canis, Brent D. Yacobucci. "The Advanced Technology Vehicles Manufacturing (ATVM) Loan Program: Status and Issues" page 11-13. 7-5700 www.crs.gov R42064. Congressional Research Service, January 15, 2015.
  8. ^ "Department of Energy: Advanced Technology Vehicles Manufacturing (ATVM) Program". Taxpayers for Common Sense. 29 August 2013. Archived from the original on 22 April 2016. Retrieved 27 November 2016.
  9. ^ a b c d "DOE Awards $8 Billion in Loans for Advanced Vehicle Technologies". Energy Efficiency and Renewable Energy news. United States Department of Energy. 2009-06-24. Archived from the original on 28 May 2010. Retrieved 2010-04-25.
  10. ^ LeSage, Jon (7 April 2014). "Advanced Technology Vehicle Manufacturing". Green Auto Market. Retrieved 27 November 2016.
  11. ^ a b c d Berman, Bradley (12 February 2020). "Trump budget kills loan program sought by EV-maker Lordstown Motors". Electrek.
  12. ^ "Automakers' Report Card: Who Still Owes Taxpayers Money? The Answer Might Surprise You". Forbes. 29 August 2012. Retrieved 27 November 2016.
  13. ^ Balaskovitz, Andy (21 May 2014). "Fuel-efficiency loan program looking beyond the Big Three". Midwest Energy News. Retrieved 27 November 2016.
  14. ^ Driving Economic Growth: ADVANCED TECHNOLOGY VEHICLES MANUFACTURING January 2016
  15. ^ "Tesla gets long-awaited government loan". The Business Journals. Pacific Business news. 2009-06-24. Archived from the original on 2016-05-05. Retrieved 2015-04-12.
  16. ^ "Tesla Motors Bags Federal Cash". Driving Today. 2009-07-17. Archived from the original on 2016-05-28. Retrieved 2009-08-08.
  17. ^ Cole, Jay (2013-05-22). "Tesla Repays Entire DoE Loan, Taxpayers MAKE $12 Million on the Deal". Inside EVs. Archived from the original on 2016-05-06. Retrieved 2013-05-23.
  18. ^ "US Energy Secretary Chu Announces $528 Million Loan for Advanced Vehicle Technology for Fisker Automotive". United States Department of Energy. 2009-09-22. Archived from the original on 2011-10-15. Retrieved 2011-02-10.
  19. ^ Keane, Angela Greiling (November 23, 2013). "Fisker to Sell Assets in Bankruptcy at $139 Million Lossn". Bloomberg. Retrieved November 23, 2013.
  20. ^ "DOE loans office commits over US$600 million to Utah hydrogen hub & Louisiana graphite facility". Energy Storage News. 27 April 2022.
  21. ^ a b "Department of Energy says 'no' to Carbon Motors' loan request for police car". Fox News. 7 March 2012. Archived from the original on 23 June 2012. Retrieved 5 June 2012.
  22. ^ "Coda Automative Chapter 11 Petition" (PDF). PacerMonitor. PacerMonitor. 2013-05-01. Retrieved 2016-06-10.
  23. ^ "Meet the 'Inflatable Car' Inventor Suing the U.S. For $675 Million". 15 May 2013.